Loading…
Loading…
Tender Value
₹12.5 Cr
EMD Value
₹25.1 L
Closing Date
13 Aug 2026, 6:00 pm4d left
ACE PWD Zone Ajmer
ACE PWD Zone Ajmer
RENEWAL OF ROAD FROM CHAGGA KA JHOPRA TO DHANDHOLA CHAURAHA UNDER DMFT SCHEME
2026_CEPWD_576353_4
NIT-14/2026-27 PWD ZONE AJMER
Open Tender
Civil Works
Percentage
240 days
SHAHPURA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Egras Challan Deposit
₹25.1 L
Yes
22 Jul 2026
22 Jul 2026
17 Aug 2026
22 Jul 2026
13 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART 'A' ROAD WORK Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical MeansBy Mechanical Means In area of non-thorny jungle | - | Hect | 10,374 | - |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 748.13 | Cum | 69 | ₹51,620.97 |
| 3 | Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per MoRTH Specification Clause 301.3.5(B) Mechanical Means | 495 | Cum | 188 | ₹93,060 |
| 4 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 39,199.31 | Cum | 44 | ₹17,24,769.64 |
| 5 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRTH Specification Clause 301.3.5 | 1,425 | Cum | 36 | ₹51,300 |
| 6 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300-1 and 300-2 for embankment construction as per MoRTH Specification Clause 305.3.4 | 1,425 | Cum | 10 | ₹14,250 |
| 7 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion
complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-I Material | 7,182.85 | Cum | 773 | ₹55,52,343.05 |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,
complete as per MoRTH Specification Clause 401.
For Grading III Material | 2,992.5 | Cum | 407 | ₹12,17,947.5 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead | 15,240.5 | Cum | 1,044 | ₹1,59,11,082 |
| 10 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 51,425 | Sqm | 28 | ₹14,39,900 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
Tendernotice_2.pdf
PDF • 23.42 MB
BOQ_1024685.xls
BOQ • 0.36 MB
04-Bid-Dhandola.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].