Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC 1 |
| 2 | L2₹3.5 L+₹55,722.13 (19.1%)Rejected-AOC | ₹3.5 L+₹55,722.13 (19.1%) | L2 | Rejected-AOC 2 |
| 3 | L3₹3.5 L+₹55,931.22 (19.1%)Rejected-AOC | ₹3.5 L+₹55,931.22 (19.1%) | L3 | Rejected-AOC 3 |
Tender Value
₹3.5 L
EMD Value
₹6,970
Closing Date
16 Feb 2026, 12:00 pmClosed
BDO KHARIBARI
KHARIBARI
Installation of Solar Drinking water near Health Centre at Dulal Jote sansad within Raniganj Panishali GP under APAS fund part no-27/09
2025_DMD_935270_63
12/BDO/KHB/APAS/2025-26
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
30 days
BDO OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,970
21 Sept 2026
9 Feb 2026
18 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 2.89 | M3 | 119.27 | ₹344.69 |
| 2 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1.69 | M2 | 323 | ₹545.87 |
| 3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree | 1.37 | M3 | 3,815.54 | ₹5,208.21 |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes (ii ) River Bazree | 0.77 | M3 | 4,497.4 | ₹3,449.51 |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m II. Other than SAIL/ TATA/RINL | 0.09 | MT | 58,250 | ₹5,122.51 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge | 16.32 | M3 | 205 | ₹3,345.6 |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 5.96 | M3 | 660.33 | ₹3,935.57 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] ii) with 1:4 cement morter ( b) 15 mm thick plaster | 9.75 | M3 | 153.14 | ₹1,493.11 |
| 9 | Neat cement punning about 1.5 mm thick in wall, dado, window sill, floor etc. | 9.75 | M2 | 32.73 | ₹319.12 |
| 10 | Drilling borehole by Rig machine with Odex-115 (Simultaneous driving of casing pipe) method of drilling through any kind of oil,boulder, rock etc. upto the required depth. This item includes the cost of hiring of Rig machine, Compressor, Supporting vehicle andother machinery & equipments with operators, drivers, laborersetc. Proportionate cost of drilling tools and accessories such asHammer, Pilot bit, Reamer bit, Guide device, Guide sleeve etc.Cost of consumable materials like fuel & lubricants, electrode forwelding, any other related equipment, materials and service etc.(Vide page TW-4 Item 1 ) | 43 | Mtr | 1,105 | ₹47,515 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.16 MB
BOQ_2456229.xls
BOQ • 0.28 MB
APAS_NIT_2nd_Phase_2nd_call.pdf
Tender Documents • 5.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .