| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.2 LAccepted-Finance | ₹47.2 L | L1 | Accepted-Finance As per BOQ Comparative statement generated |
| 2 | L2₹52.5 L+₹5.3 L (11.2%)Accepted-Finance | ₹52.5 L+₹5.3 L (11.2%) | L2 | Accepted-Finance As per BOQ Comparative statement generated |
| 3 | L3₹53.5 L+₹6.3 L (13.3%)Accepted-Finance | ₹53.5 L+₹6.3 L (13.3%) | L3 | Accepted-Finance As per BOQ Comparative statement generated |
| 4 | L4₹55.0 L+₹7.9 L (16.7%)Accepted-Finance | ₹55.0 L+₹7.9 L (16.7%) | L4 | Accepted-Finance As per BOQ Comparative statement generated |
| 5 | L5₹57.3 L+₹10.1 L (21.5%)Accepted-Finance HANU YOKMA | SENAPATI | MANIPUR | 795007 | ₹57.3 L+₹10.1 L (21.5%) | L5 | Accepted-Finance As per BOQ Comparative statement generated |
Tender Value
₹78.6 L
EMD Value
₹1.9 L
Closing Date
26 Jun 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal from Yurugam to Youlgo Chenmo to Youljuk at Koyul .(Under BADP )
2026_PWD_19034_2
14 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
90 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹2,000
Payable To Executive Engineer InFC division Leh
₹1.9 L
30 Jun 2026
6 Jun 2026
27 Jun 2026
6 Jun 2026
26 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. A. All kinds of soil 90% | 1,648.46 | Cum | 278.09 | ₹4,58,420.24 |
| 2 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 271.44 | Cum | 537.71 | ₹1,45,956 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 181.44 | Cum | 5,725.33 | ₹10,38,803.88 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 663.57 | Cum | 6,444.31 | ₹42,76,250.79 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) derived from natural sources : 3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1.86 | Cum | 9,048.91 | ₹16,830.97 |
| 6 | Steel work welded in built up sections/ framed work, including cutting, hoisting,
fixing in position an In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all | 236 | Kg | 146.29 | ₹34,524.44 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for :
A. Foundations, footings, bases for columns | 903 | Sqm | 306.15 | ₹2,76,453.45 |
| 8 | B. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 2.4 | Sqm | 635.45 | ₹1,525.08 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 989.07 | Cum | 220.4 | ₹2,17,991.03 |
| 10 | Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates | 93.14 | Cum | 1,494.48 | ₹1,39,195.87 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_45395.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .