Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance HOUSE NO 180 TELSRA ROAD JUNGLE SIDE BANKI MONGRA KORBA CG 495447 | KORBA | KORBA | CHHATTISGARH | 495447 | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 L+₹1.1 L (25.4%)Admitted-Finance HOUSE NO A 31 POWER CITY JAMSHEDPUR KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | ₹5.4 L+₹1.1 L (25.4%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Tapan Kumar L1 | Vijay Chandra Jha L2 |
|---|---|---|---|---|---|
| 1.00 | Drilling (Power Drill)/blasting in roof /sides in stone / drifting, and removal of excavated materials manually upto 30m lead in UG. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. | 76.91 | Cubic Meter | 1,900 ₹1,46,129 Lowest | 2,189.19 ₹1,68,370.6 |
| 2.00 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 1.31 | Cubic Meter | 5,000 ₹6,550 Lowest | 6,842.08 ₹8,963.12 |
| 3.00 | Roof bolting (1.5m Length, 29mm dia) by machenical drilling of holes, jamming tightening the roof bolts with bearing plates /w- straps including carriage of material from nearest district store to working faces within a lead of 500 m. (i). Material Like drill Rod , Drill bit will be provided by the department.(ii). Material like mechanical drill machine /UDM , drill cable , etc. will be provided by the colliery management. (iii). Arrangement of water & power will be provided by the management . (for underground). | 90 | Nos | 145 ₹13,050 Lowest | 181.61 ₹16,344.9 |
| 4.00 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 1.05 | Cubic Meter | 2,000 ₹2,100 Lowest | 2,431.33 ₹2,552.9 |
| 5.00 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 19.32 | Cubic Meter | 500 ₹9,660 Lowest | 759.67 ₹14,676.82 |
| 6.00 | Loading of material (Cement) into tub on surface within a lead of 50m. | 3.63 | Metric Tonnes | 180 ₹653.4 Lowest | 225.87 ₹819.91 |
| 7.00 | Loading of material (Sand) into tub on surface within a lead of 50m. | 7.15 | Cubic Meter | 250 ₹1,787.5 Lowest | 389.85 ₹2,787.43 |
| 8.00 | Loading of material (Stone chips) into tub on surface within a lead of 50m. | 4.88 | Cubic Meter | 250 ₹1,220 Lowest | 389.85 ₹1,902.47 |
| 9.00 | Loading of material (Steel) into tub on surface within a lead of 50m. | 0.36 | Metric Tonnes | 180 ₹64.8 Lowest | 225.87 ₹81.31 |
| 10.00 | Loading of material (Bricks) into tub on surface within a lead of 50m. | 8.57 | Thousand | 500 ₹4,285 Lowest | 727.61 ₹6,235.62 |
Tender Value
₹6.5 L
EMD Value
₹8,200
Closing Date
21 Aug 2026, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 01 nos. air crossing 17LE panel at Singhali UG Mine, Korba Area.
2026_SECL_363058_1
SECL/GM/KB/SO(M)/eNIT/26-27/30 dt 03.08.26
Open Tender
Civil Works - Buildings
Item Rate
20 days
Korba
As per NIT
4 documents required · 4 mandatory
₹8,200
1 Sept 2026
6 Aug 2026
22 Aug 2026
6 Aug 2026
21 Aug 2026
7 Aug 2026
6 Aug 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drilling (Power Drill)/blasting in roof /sides in stone / drifting, and removal of excavated materials manually upto 30m lead in UG. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. | 76.91 | Cubic Meter | 2,233.87 | ₹1,71,806.94 |
| 2 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 1.31 | Cubic Meter | 6,981.72 | ₹9,146.05 |
| 3 | Roof bolting (1.5m Length, 29mm dia) by machenical drilling of holes, jamming tightening the roof bolts with bearing plates /w- straps including carriage of material from nearest district store to working faces within a lead of 500 m. (i). Material Like drill Rod , Drill bit will be provided by the department.(ii). Material like mechanical drill machine /UDM , drill cable , etc. will be provided by the colliery management. (iii). Arrangement of water & power will be provided by the management . (for underground). | 90 | Nos | 185.32 | ₹16,678.8 |
| 4 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 1.05 | Cubic Meter | 2,480.95 | ₹2,605 |
| 5 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 19.32 | Cubic Meter | 775.18 | ₹14,976.48 |
| 6 | Loading of material (Cement) into tub on surface within a lead of 50m. | 3.63 | Metric Tonnes | 230.48 | ₹836.64 |
| 7 | Loading of material (Sand) into tub on surface within a lead of 50m. | 7.15 | Cubic Meter | 397.81 | ₹2,844.34 |
| 8 | Loading of material (Stone chips) into tub on surface within a lead of 50m. | 4.88 | Cubic Meter | 397.81 | ₹1,941.31 |
| 9 | Loading of material (Steel) into tub on surface within a lead of 50m. | 0.36 | Metric Tonnes | 230.48 | ₹82.97 |
| 10 | Loading of material (Bricks) into tub on surface within a lead of 50m. | 8.57 | Thousand | 742.46 | ₹6,362.88 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 0.76 MB
BOQ_375975.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .