| 1 | 1₹38.1 LAccepted-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | SALEM | TAMIL NADU | 636456 | ₹38.1 L Quoted ₹32.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹33.6 LRejected-AOC 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹33.6 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | LENIN ENGINEERING WORKS L1 | BHARATH ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing eroded coal pipes along with bends of length at about 15mtr length after arresting at both end of the rest of the pipe near boiler corner at elevation 16mtr and lowered to ‘O’ mtr,. arresting and disconnecting hanger supports. | 60 | Nos | 23,670 ₹14.2 L | 24,500 ₹14.7 L |
| 2.00 | Charges for lifting the coal pipe and assembling in proper position with the existing coal pipe line and removing coal pipe temporary supports and devolution of scraps to stores. | 60 | Nos | 11,620 ₹7.0 L | 12,100 ₹7.3 L |
| 3.00 | Charges for making scaffolding arrangements and landing platformat the bottom of the coal pipe at 14 mtr height at boiler corner1 to 4 for easy dismantling and assembling the coal pipe. The dismantling of scaffolding arrangements supports and landing platform. | 4 | Nos | 36,795 ₹1.5 L | 37,600 ₹1.5 L |
| 4.00 | Cutting of 10mm thick patches of various sizes and prepare the patches to suit the eroded portions of coal bends, inner Cone assembly and welding these patches including devolution of scraps to stores as per the direction of the engineer in charge. | 250 | Mtr | 269 ₹67,250 | 275 ₹68,750 |
| 5.00 | Charges for arresting the coal pipe firmly, dismantling the eroded ceralin (Less than 900) or MS bend by gas cutting, lowering the bends to the respective floor, assembling the new bend by welding after setting alignment and removing all coal pipe supports including charges for scaffolding. | 53 | Nos | 14,200 ₹7.5 L | 14,700 ₹7.8 L |
| 6.00 | Cutting gas | 9 | Sets | 3,635 ₹32,715 | 4,000 ₹36,000 |
| 7.00 | Cost of MS Welding electrodes | 250 | Kgs | 443 ₹1.1 L | 480 ₹1.2 L |
| 8.00 | Charges for consumables and T& Ps | 1 | LS | 4,925 ₹4,925 | 5,200 ₹5,200 |
Tender Value
Refer Docs
EMD Value
₹34,900
Closing Date
27 Apr 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPSI Mill Plant Unit III Coal flow system to boiler Removing the existing dislocated coal pipe lines at both left and right sides of the Boilers up to boiler at 16 meter level and re assembling the same after rectification of the pipes coal bend
2025_EB_550958_1
CE / MTPS-I / SE / M-I / MP /OT. 35/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹34,900
Yes
22 May 2026
24 Apr 2025
28 Apr 2025
24 Apr 2025
27 Apr 2025
24 Apr 2025
Amount
Dismantling the existing eroded coal pipes along with bends of length at about 15mtr length after arresting at both end of the rest of the pipe near boiler corner at elevation 16mtr and lowered to ‘O’ mtr,. arresting and disconnecting hanger supports.
Charges for lifting the coal pipe and assembling in proper position with the existing coal pipe line and removing coal pipe temporary supports and devolution of scraps to stores.
Charges for making scaffolding arrangements and landing platformat the bottom of the coal pipe at 14 mtr height at boiler corner1 to 4 for easy dismantling and assembling the coal pipe. The dismantling of scaffolding arrangements supports and landing platform.
Cutting of 10mm thick patches of various sizes and prepare the patches to suit the eroded portions of coal bends, inner Cone assembly and welding these patches including devolution of scraps to stores as per the direction of the engineer in charge.
Charges for arresting the coal pipe firmly, dismantling the eroded ceralin (Less than 900) or MS bend by gas cutting, lowering the bends to the respective floor, assembling the new bend by welding after setting alignment and removing all coal pipe supports including charges for scaffolding.
Cutting gas
Cost of MS Welding electrodes
Charges for consumables and T& Ps
BHARATH ENGINEERING WORKS (BID ID -1321447)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_657702.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_657702.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid