Loading…
Loading…
Tender Value
₹30.5 Cr
EMD Value
₹15 L
Closing Date
20 Aug 2026, 6:00 pm
HQ CE ANZ Sri Vijaya Puram
Military station brichgunj sri vijaya puram
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR PROVISIONING OF BASIC STORAGE AND INFRASTRUCTURE FOR SPL VEH AND EQPT INCL GHE/GSE FOR NGMMCB DET 1 AT CAMPBELL BAY
2026_MES_769860_1
801260/E8
Open Tender
Civil Works
Lump-sum
CampbellBay
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE CampbellBay
₹15 L
Yes
HQ CE ANZ Sri Vijaya Puram
20 Aug 2026
5 Jun 2026
22 Aug 2026
5 Jun 2026
20 Aug 2026
12 Aug 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | GENERAL SUMMARY
NOTE: Schedule ‘A’ Part - II to XIII are prepriced by MES under Ser No. 03 to 14. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | - | - | - | - |
| - | Lumpsum price worked out by the tenderer for "BUILDINGS/STRUCTURES" as listed in Schedule ‘A’ Part- I | 1 | Lumpsum | - | - |
| 0.0 | Construction of RCC retaining wall upto 4 m height and 150m length by Analysis, design, Engineering, detailing, & Structural drgs including concertina coil over retaining wall as required at site and as marked on site plan for the entire area of Site Plan as per the DBR vetted by IIT/NIT and approved by Accepting Officer.
Note: If the actual length of Retaining wall as per the Contractor's design / proposal of site development as shown on site plan turns out to be different the variation in length shall be measured using Pro-rata. | 1 | Lumpsum | - | - |
| - | Lumpsum price worked out by the tenderer for "EXCAVATION & EARTHWORK INCLUDING SITE CLEARANCE AND LAND DEVELOPMENT" as listed in Schedule ‘A’ Part- II | 1 | Lumpsum | - | - |
| 0.0 | Lumpsum price worked out by the tenderer for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III | 1 | Lumpsum | - | - |
| 0.0 | Lumpsum price worked out by the tenderer for "EXTERNAL ELECTRIC SUPPLY" as listed in Schedule ‘A’ Part- IV | 1 | Lumpsum | - | - |
| - | Lumpsum price worked out by the tenderer for "ROAD / PATH / CULVERT/HARD STANDING" as listed in Schedule ‘A’ Part- V | 1 | Lumpsum | - | - |
| - | Lumpsum price worked out by the tenderer for "AREA DRAINAGE" as listed in Schedule ‘A’ Part- VI | 1 | Lumpsum | - | - |
| - | Lumpsum price worked out by the tenderer for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part- VII | 1 | Lumpsum | - | - |
| - | Lumpsum price worked out by the tenderer for "COMPOUND WALL,FENCING,GATES" as listed in Schedule ‘A’ Part- VIII | 1 | Lumpsum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
Tender.pdf
Tender Documents • 10.94 MB
BOQ_862144.xls
BOQ • 3.50 MB
Drawings.pdf
Additional Documents • 4.96 MB
Corrigendum2.pdf
PDF • 0.41 MB
Corrigendum1.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].