Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.8 L+₹6,387.41 (1.36%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹5.0 L+₹32,399.99 (6.91%)Rejected-AOC | L3 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | DMBUILDERS L1 | V.Sekaran L2 | S.Sathish kumar L3 |
|---|---|---|---|---|---|---|
| 1.00Vellore District Construction of Drainage at Indhira Nagar in Ulli Panchayat at Gudiyatham Block 15th CFC (DP)(Untied,Tied Sanitation,Tied Water Supply) 2025-26 Package No 08 | ||||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 67.48 | Cu.M | 250 ₹16,870 Lowest | 253.23 ₹17,087.96 | 323 ₹21,796.04 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 9.64 | Cu.M | 5,750 ₹55,430 | 5,231.59 ₹50,432.53 Lowest | 5,449 ₹52,528.36 |
| 4.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete (Below Gr.Level) | 231.36 | Sq.M | 375 ₹86,760 Lowest | 525.6 ₹1,21,602.82 | 553 ₹1,27,942.08 |
| 5.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete (Above Gr.Level) | 4.16 | Sq.M | 350 ₹1,456 Lowest | 1,051.2 ₹4,372.99 | 1,095 ₹4,555.2 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 26.61 | Cu.M | 8,000 ₹2,12,880 | 6,571.56 ₹1,74,869.21 Lowest | 6,845 ₹1,82,145.45 |
| 7.00 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.04 | MTs. | 95,000 ₹3,800 | 88,226.55 ₹3,529.06 Lowest | 91,902 ₹3,676.08 |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.75 | Cu.M | 8,500 ₹6,375 Lowest | 8,971.3 ₹6,728.48 | 9,345.1 ₹7,008.83 |
| 9.00 | Plastering with cement mortar 1:5, 20mm thick including cost and conveyance and all labour charges etc. | 43.38 | Sq,.M | 300 ₹13,014 Lowest | 550.83 ₹23,895.01 | 573.78 ₹24,890.58 |
| 10.00 | Letering and Painting Name board | 1 | No. | 1,000 ₹1,000 | 480 ₹480 Lowest | 500 ₹500 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
10 Sept 2025, 3:00 pmClosed
The Block Developement Officer Gudiyatham
The Block Developement Office Gudiyatham
Vellore District Construction of Drainage at Indhira Nagar in Ulli Panchayat at Gudiyatham Block 15th CFC (DP)(Untied,Tied Sanitation,Tied Water Supply) 2025-26 Package No 08
2025_RDTN_598097_1
A3/760/2025 GUD AUG 41-25
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
9 Dec 2025
28 Aug 2025
10 Sept 2025
28 Aug 2025
10 Sept 2025
28 Aug 2025
Amount
Vellore District Construction of Drainage at Indhira Nagar in Ulli Panchayat at Gudiyatham Block 15th CFC (DP)(Untied,Tied Sanitation,Tied Water Supply) 2025-26 Package No 08
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete (Below Gr.Level)
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete (Above Gr.Level)
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete.,
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with cement mortar 1:5, 20mm thick including cost and conveyance and all labour charges etc.
Letering and Painting Name board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.Sekaran (BID ID -1450762)
S.Sathish kumar (BID ID -1450933)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_714879.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .