Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical DESHBANDHU NAGAR PANCHPOTA KOLKATA 700152 | KOLKATA | KOLKATA | WEST BENGAL | 700152 | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical 40 SOLOK PALLY DOCTOR BAGAN 2ND LANE GARFA GARFA KOLKATA WEST BENGAL 700078 | KOLKATA | WEST BENGAL | 700078 | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
| 5 | Accepted-Technical VILL P O ALAMPUR P S NODAKHALL SOUTH 24 PARGANAS PIN 743318 | ALAMPUR | SOUTH 24 PARGANAS | WEST BENGAL | 743318 | Accepted-Technical Accepted |
Tender Value
Refer Docs
Closing Date
13 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EO, MKDA
MKDA, Sahid Kshudiram Zilla PArikalpana Bhavan, 2nd Floor, Paschim Medinipur Zilla Parishad Complex, Paschim Medinipur
Refurbishment, Renovation of interiors including acoustic paneling, related interior works, Audio Visual Infrastructure, Electrical Works and supply of Furniture for the Conference Hall in the 1st Floor of SHG Building at the District Collectorate
2026_MKDA_1048852_1
NIQ-1/MKDA/2026-27
Open Tender
CIVIL WORKS
Item Rate
180 days
MIDNAPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
17 Nov 2026
6 Nov 2026
17 Nov 2026
6 Nov 2026
13 Nov 2026
6 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carefully isolate the relevant electrical circuits before commencing dismantling and dismantle existing light fittings, fans, surface-mounted conduits, brackets, trims and associated accessories only at locations identified for removal. Use appropriate tools and controlled methods to prevent damage to retained ceiling, wall finishes, wiring, ducts and adjoining installations. Segregate reusable components from scrap, label and stack reusable items at a location designated by the client, and safely cap or secure exposed wiring ends pending subsequent installation. Include removal of loose fixing components and local cleaning of the affected work area. Disposal of unserviceable materials shall be undertaken in accordance with site instructions and applicable safety requirements; any concealed or hazardous condition encountered shall be reported before further disturbance.
Note: about 35 nos Ceiling Fan, 25 nos Tube Light and about 150 mtr Cable/wire with condutes to be removed | 280 | Sqm | - | - |
| 2 | Remove loose, flaking, delaminated or otherwise unsound paint films, deteriorated wall coverings, redundant panels, abandoned surface fixtures and associated fasteners from the designated wall surfaces. Employ controlled scraping, sanding and dismantling methods appropriate to the substrate so as to minimise damage to sound plaster, masonry, glazing and retained services. Rake out loose material, remove dust and contaminants, and prepare the exposed substrate to receive subsequent repair and finishing systems. Collect, segregate and transport generated debris to the site-designated disposal point, leaving the work area orderly and suitable for follow-on trades. The item includes ordinary removal and surface preparation only; major concealed defects, extensive replastering or specialist hazardous-material abatement, if discovered, shall be assessed and approved separately. | 228 | Sqm | - | - |
| 3 | Inspect and repair localised cracks, pinholes, chipped plaster, fixing holes, surface depressions and damaged areas exposed during dismantling. Remove friable material back to a sound substrate, apply compatible bonding agent where required, and reinstate the affected areas using suitable cementitious repair mortar, plaster or approved filler according to the depth and nature of the defect. Ensure repaired surfaces are firmly bonded, adequately levelled and brought flush with adjacent existing finishes; provide curing wherever cement-based materials are used. Make good around removed fixtures, service penetrations and altered openings, and leave all treated surfaces dry, stable and ready for putty, primer or paint. Structural cracks, active water ingress and extensive substrate failure are excluded from routine minor repairs and shall be notified for separate technical direction. | 10 | Sqm | - | - |
| 4 | Prepare the specified internal wall surfaces and apply an approved-quality wall putty or compatible skim-coat compound in the number of coats necessary to achieve a uniform, smooth and paint-ready substrate. Before application, ensure the base is sound, dry, clean and free from dust, grease, loose particles and efflorescence; apply primer or bonding treatment where required by the selected product system. Apply each coat evenly with suitable tools, allowing adequate drying between coats, followed by careful sanding to remove ridges, trowel marks and surface undulations. Fill minor pinholes and local imperfections, remove all sanding dust and maintain consistent surface plane, texture and edge definition at corners, reveals and junctions. Materials and application shall conform to the manufacturer's recommendations and the approved finish sample. | 228 | Sqm | - | - |
| 5 | Execute minor brickwork or concrete-block masonry alterations, including closing redundant openings and forming small infill sections as indicated by the approved site requirements. Use sound, dimensionally consistent bricks or blocks of an appropriate type, laid in approved cement-sand mortar with properly staggered joints, full bedding and plumb, level and true alignment. Prepare and wet the substrate as appropriate, provide bonding or toothed junctions to existing masonry where practicable, and ensure joints are fully packed without voids. Complete necessary cutting, bonding, curing and local making-good to adjoining surfaces so that the completed work is stable and ready for plastering or finishing. This item is for minor non-structural masonry only; structural alterations, lintels, reinforcement and major demolition are excluded unless specifically detailed and approved. | 1.5 | Cum | - | - |
| 6 | Supply and install approved commercial-grade modular carpet tiles of the specified colour, pattern, pile construction, backing and performance classification, subject to approval of a physical sample. Verify floor levels and moisture condition before installation; remove dust, loose particles, oil and adhesive residues, and rectify minor surface irregularities with a compatible levelling compound where required. Establish control lines and lay tiles in the approved directional orientation and pattern using the adhesive recommended by the manufacturer, maintaining tight, uniform joints and accurate alignment. Include measured cutting around columns, door frames, floor boxes and other obstructions, neat perimeter termination, rolling or pressure-setting as recommended, and replacement of visibly defective or damaged tiles. Protect the completed flooring from traffic and contamination until handover, and leave the surface clean and uniformly finished. Extensive floor screeding or major substrate remediation is excluded unless separately measured. | 280 | Sqm | - | - |
| 7 | Supply and install an exposed-grid suspended ceiling system comprising approved mineral-fibre/acoustic ceiling tiles, compatible main runners, cross tees, perimeter wall angles, suspension wires or approved hangers, connectors and necessary fixing accessories. Tiles shall be of the approved module, thickness, edge profile, acoustic performance and finish, and shall be installed in accordance with the manufacturer's system details and the approved reflected ceiling plan. Set out the grid symmetrically where practicable, maintain true, level and aligned members, provide secure suspension from suitable structural supports, and accurately cut tiles around luminaires, diffusers, sprinklers, detectors, access points and other services. Coordinate all service openings and maintain required access to concealed installations; unsupported loading from services shall not be imposed on the ceiling grid. Include perimeter finishing, replacement of damaged tiles, removal of installation debris and final alignment checks. | 290 | Sqm | - | - |
| 8 | Fabricate and install gypsum-board false ceiling, drops or bulkheads in the configuration shown on the approved reflected ceiling plan, using an appropriately gauged galvanised-steel framework with perimeter channels, intermediate members, hangers, connectors and corrosion-resistant fasteners. Fix approved gypsum boards of suitable thickness to the framework with joints staggered and fasteners installed at the recommended centres. Form straight lines, accurate levels, clean corners and consistent bulkhead profiles; provide suitable reinforcement around access openings, fixtures and other local interruptions. Treat joints with compatible jointing compound and reinforcing tape, apply successive coats as required, sand smooth and prepare the surface for the specified primer and paint finish. Coordinate all cut-outs with lighting, HVAC, fire and electrical layouts, and retain access to concealed services. Include ordinary joint treatment and finishing; major structural supports and specialised acoustic assemblies are excluded unless specified. | 150 | Sqm | - | - |
| 9 | Supply and install purpose-made concealed ceiling access panels/trap doors at the approved service-access locations, sized to suit the actual maintenance requirement and coordinated with the ceiling module and surrounding framework. The panel assembly shall incorporate a rigid frame, suitable board or substrate matching the adjacent ceiling construction, concealed or unobtrusive hinges, positive locking/catch arrangement and all necessary fixing accessories. Reinforce the surrounding ceiling framing to maintain rigidity and prevent sagging or cracking; ensure the panel opens freely, remains securely supported and provides practical access to valves, dampers, junction boxes and other maintainable services. Finish the exposed face to match the adjacent ceiling in plane, texture and paint treatment, with neat, uniform perimeter gaps and no visible damage. Confirm final locations with the services team before closure. | 6 | Nos. | - | - |
| 10 | Prepare the designated internal wall and ceiling surfaces and apply an approved premium-quality interior emulsion paint system in the selected colour and sheen, following approval of colour samples. Surfaces shall be dry, clean, sound and suitably smooth; apply compatible wall primer/sealer, rectify minor defects with putty where required, and sand between preparatory coats as necessary. Apply a minimum of two uniform finish coats, or the number stipulated by the manufacturer's system to achieve complete hiding and consistent colour, using brush, roller or spray application appropriate to the location. Maintain sharp, clean cut-in lines at junctions, corners, frames and service fittings; protect floors, furniture, glazing, electrical accessories and other finished surfaces against splashes. Allow appropriate drying intervals and inspect under normal lighting for patchiness, roller marks, runs, pinholes and shade variation; rectify defects and remove paint residue before handover. | 300 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
0-Check_List.xls
Tender Documents • 0.02 MB
0-SBD.pdf
Tender Documents • 0.56 MB
BOQ_2567728.xls
BOQ • 0.34 MB
0-BIDDER.pdf
Tender Documents • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .