Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
29 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TENDER
15 conditions · 4 needing a document upload
Financial Eligibility Criteria : The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Electrical License: The individual/firm should have valid "B" grade electrical license and should be on their own name/firm name issued by the competent Authority. A copy of license should be uploaded through IREPS with their offer, failing which the tender WILL BE REJECTED.
Similar nature of work: - "Works of wiring /cabling or installation and commissioning of electrical items (other than on coaches) such as lights, fans, pumps, charging arrangements earthings etc. (with or without supply of items/equipments) for 230 V, 1 phase or 415 V, 3 phase system or higher voltages." (Ref: Hqrs Lr.No:E.29/P/Similar nature of works Dt: 30.12.2014.)
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
37 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Senior Divisional Electrical Engineer/Maintenance/ Secunderabad Division/ South Central Railway / Secunderabad - 500025. In submitting the tender it would be deemed that the tenderer has kept himself fully Informed of the provision of the Indian Railways Standard General Conditions of Contract including all corrections and Amendments issued upto date and claim that he is not aware of any amendment or correction slip to the IRSGCC shall not be entertained.(As per IRGCC April 2022 or latest with amendments).
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Senior Divisional Electrical Engineer/Maintenance/ Secunderabad Division/ South Central Railway/ Secunderabad - 500025. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.(As per IRGCC April 2022 or latest with amendments).
DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalised by the Railway and will, therefore, be supplied to the contractor as and when they are finalised on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.(As per IRGCC April 2022 or latest with amendments).
Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED (As per IRGCC April 2022 or latest with amendments).
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. (As per IRGCC April 2022 or latest with amendments).
CORRIGENDUM NOTICE ON IREPS: [I] Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III] To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders. (As per IRGCC April 2022 or latest with amendments).
E-Tender shall be rejected if it is not accompanied by the prescribed: [1] Cost of tender document [2] EMD [3] Certificate(s) in support of technical eligibility criteria [4] Certificate(s) in support of financial eligibility criteria [5] Copy of documents in support of Proprietary concern/ Partnership firm / Pvt.Ltd.company / Limited Company / JV firm / Valid MOU for JV firms as detailed in COMMERCIAL COMPLIANCE. (As per IRGCC April 2022 or latest with amendments).
The bidders/tenderers should ensure that they are GST compliant. Quoted rates are inclusive of applicable GST as per GST ACT -2017 amended from time to time and as detailed in Special Conditions - General (under TAXES clause). (As per IRGCC April 2022 or latest with amendments).
The tenderer[s] may also upload the following documents alongwith his/their tender: The tenderer may upload method statement, which shall contain organizational set up and working systems to be adopted by the successful tenderers during the operation of the contract. It shall contain the details of man power and machineries in the prescribed format and details of methodology for planning, execution, monitoring and completion of the project. The methodology so adopted shall suit to the nature of work and shall also comply fully with best practice and current regulations. A comprehensive detailing for each activity like setting-up organization, safety plan, execution plan, quality assurance plan, sequence of work to achieve the mile stones, ensure targeted progress and quality and inturn deployment of resources, risk analysis and its mitigation strategy shall be given communication arrangement within his organization and with the railways for decisions, progress or any other matter connected with this project to ensure full information about the project including progress of work at different time scale shall also be furnished. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall adhere to the time frame as mentioned in mile stone chart prescribed in the tender. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall engage the personnel with requisite qualification as per Special Conditions of Contract. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall deploy adequate number of plant and equipment for the execution of subject contract works to achieve progress as per mile stone chart. (As per IRGCC April 2022 or latest with amendments).
List of works completed in the last seven financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work. Date of actual start, actual completion and final value of contract should also be given. (As per IRGCC April 2022 or latest with amendments).
List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award. (As per IRGCC April 2022 or latest with amendments).
Supportive documents/certificates from the organizations with whom they worked/are working as list of works completed and list of works on hand should be enclosed. (As per IRGCC April 2022 or latest with amendments).
[1] I/We have read the various conditions of the tender attached hereto and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for the period mentioned in the tender document [NIT HEADER] from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money Deposit submitted. [2] I/We offer to do the work at the percentage rates quoted by me/us in the attached schedule and bind myself/ourselves to complete the work within the period of completion given in this tender document [NIT HEADER] from the date of issue of letter of acceptance of this tender. I/We also hereby agree to abide by the IRS GCC and Special Conditions of contract in carryingout the works laid down by South Central Railway for the present contract. [3] The full value of the earnest money paid shall stand forfeited without prejudice to any other rights or remedies of the railway if [a]I/We do not execute the contract document within seven days after receipt of notice issued by the Railway that such documents are ready: OR [b] I/We do not commence the work within fifteen days after receipt of orders to that effect. [4] Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work. (As per IRGCC April 2022 or latest with amendments).
I/We fail to submit the requisite Performance Guarantee [P.G] in the prescribed format within the time limit as prescribed in GCC (as amended from time to time) from the date of issue of Letter of Acceptance, we are aware that the contract shall be terminated duly forfeiting EMD and other dues, if any payable against the contract. Also, I/We shall be debarred from participating in the retender for the work. (As per IRGCC April 2022 or latest with amendments).
I/We understand that no post-tender correspondence will be entertained, however, if any clarification is required by the Railway, the same will be sought from the tenderer. Also, I/We are aware that any Certificate/ Documents offered after the tender opening shall not be given any credit and shall not be considered. (As per IRGCC April 2022 or latest with amendments).
I/we do hereby solemnly affirm and state on behalf of the tenderer including its constituents as under: (As per IRGCC April 2022 or latest with amendments).
[i] I/We the tenderer(s) am/are signing this document after carefully reading the contents. [ii] I/We declare and certify that I/We have not made any misleading or false representation in the documents, forms, statements attached in proof of the qualification requirements. [iii] I/We also understand that my/our offer will be evaluated based on the documents/credentials uploaded alongwith the offer and the same shall be binding upon me/us. [iv] I/We declare that the information and the documents attached alongwith the tender by me/us are correct and I/We are fully responsible for the correctness of the information and the documents submitted by us. (As per IRGCC April 2022 or latest with amendments).
[i] I/We do hereby undertake that, if any of the certificates regarding eligibility criteria submitted by us are found to be forged/false/incorrect at any time during the process of evaluation of the tenders, it shall lead to forfeiture of the tender EMD. Further, I/We and all my/our constituents understand that my/our offer shall be summarily rejected. [ii] I/We also understand that, if the certificates submitted by us are found to be false/forged/ incorrect at any time after the award of the contract, it will lead to termination of the contract besides suspending of business for 5 years, with the tenderer and with all the partners in case of partnership firm and with all the members of a JV in case of a Joint Venture, forfeiture of EMD/SD and Performance Guarantee and any other action provided in the contract. (As per IRGCC April 2022 or latest with amendments).
It is certified that I/We have not been blacklisted or debarred by railways or any other ministry/ department/public sector undertaking of the government of India/State Government from participation in tenders/contract on the date of tender opening of bids, either in individual capacity or as a member of JV firm in which I/We were/are members. (As per IRGCC April 2022 or latest with amendments).
I/We indemnify and save harmless the Railway from and against all actions, suit proceedings losses, costs, damages, charges, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the Contractor, his agents or employees, in the execution of the works or in his guarding of the same. All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the actual loss or damage sustained, and whether or not any damage shall have been sustained. (As per IRGCC April 2022 or latest with amendments).
The prices are inclusive of GST
Secunderabad Division Electrical Maintenance Department - (i) Bhongir- Construction of 8 Bedded RPF barracks for Male at Bhongiri -Out Post (ii) DLS/KZJ - Upgradation of RPF Out post building at DLS/KZJ (iii) Jamikunta - Construction of CPWI office and shed at JMKT (iv) Manuguru - Replacement of old type1 qtrs (B,No.8/1-5&19/1-3 =08 units) & old TypeII qtrs (B.No.3/1-4 =04 units) with New Type-II qtrs at MUGR rly colony (v) Karepalli - DKJ-BDCR Section - KRA - Construction of Type-IV Quarter (1No.) for SSE/P.Way and Type-III (1No.) for JE/Pway at Karepalli (vi) Provision of 2 Nos. of 8 passenger capacity lifts in place of existing over aged lifts in Sanchalan Bhavan and Provision of 02 Nos of 13 passenger lifts capacity at New Annex Building at RSB (vii) Provision of 01 No of 6 passenger lift capacity at Chittapur Running Room (viii) CHZ - Construction of new type design RPF post- office building at Cherlapalli (ix) Secunderabad - Additional block for TTE Rest House with 27 Beds (14 Beds for Male TTEs and 13 Beds for Lady TTEs with separate toilets) with AC's, kitchen, Store, RO water and furniture provision (x) KHNP- Construction of Type-II quarters -07 Nos at KHNP (xi) Proposal for construction of new building of 5000 Sqft fri Cyber Cell/SCR for formation of integrated command control Centre -Electrical arrangements.
E-M-SC-05-OT-2026-27
E-M-SC-05-OT-2026-27
Open
Works - General
6 Months
Hyderabad, Telangana
₹0
₹5.2 L
29 May 2026
7 May 2026
15 May 2026
465 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,60,38,016.13 | ||
| — | 39.00 | — | — | ||
| Concrete for foundations and plinth in other than hard soil and rock | — | — | — | 1,56,117 | |
| — | 44.00 | — | — | ||
| Concrete for foundations and plinth in hard soil. | — | — | — | 1,88,848 | |
| — | 100.00 | — | — | ||
| Horizontal drilling of bores for LT cables | — | — | — | 1,26,900 | |
| — | 4900.00 | — | — | ||
| Excavation of cable trench in all types of soils for LT cable as per the directions of engineer at site making good after laying the cable | — | — | — | 6,37,000 | |
| — | 250.00 | — | — | ||
| Excavation of cable trench in Tar road surface as per the Rly specification No:C/E/UGC/1/92& Drg No:SC/A3/STD/1288 Alt-I | — | — | — | 54,000 | |
| — | 1000.00 | — | — | ||
| Excavation of cable trench incement concrete bed flooring as per the Rly specification No:C/E/UGC/1/92& Drg No:SC/A3/STD/1288 Alt-I | — | — | — | 4,05,000 | |
| — | 240.00 | — | — | ||
| Excavation of cable trench across the track as per the Rly specification No:C/E/UGC/1/92& Drg No:SC/A3/STD/1288 Alt-I | — | — | — | 63,600 | |
| — | 65.00 | — | — | ||
| Provision of Earthing arrangements. | — | — | — | 2,27,370 | |
| — | 41.00 | — | — | ||
| Supply and Erection Provision of RCC earth pit hollow box of size 300 mm x 300 mm x 300mm with 50 mm wall thickness by using M20 Grade precast RCC. It includes fixing of earth pits at various locations (All the required men, material and transportation are to be arranged by contractor) Drawings to be collected from Sr.DEE/M/SC office | — | — | — | 30,176 | |
| — | 41.00 | — | — | ||
| Supply and Erection of RCC precast slabs with hook to cover Earth pits of dimensions. All the required materials for this work i.e. stones, cement, iron and sand etc. are to be supplied by contractor.) Drawings to be collected from Sr.DEE/M/SC office. | — | — | — | 6,396 | |
| — | 6.00 | — | — | ||
| Supply and erection of earth electrodes for maintenance free earthing i.e., copper bonded high tensile low carbon steel electrode of with minimum 3mtrs. Long, 17 mm dia with copper coating thickness of min 250 microns and current carrying capacity of min 15 KA for 1 sec. | — | — | — | 24,750 | |
| — | 300.00 | — | — | ||
| Supply and filling of Earth enhancing materials for maintenance free earthing. | — | — | — | 78,000 | |
| — | 3.00 | — | — | ||
| Supply and fixing of copper bus bar 50x 6mm. | — | — | — | 12,000 | |
| — | 3.00 | — | — | ||
| Supply and fixing of 25x3 mm EC grade copper strip for connecting earth terminal to the bus bar in equipment room. | — | — | — | 4,794 | |
| — | 6.00 | — | — | ||
| Earth chamber with LID 100x250x250 mm. | — | — | — | 4,200 | |
| — | 120.00 | — | — | ||
| Supply & laying of 1Cx35mm cable from pit to main equipment bus bar including bolts, nuts & HDPE pipes | — | — | — | 28,800 | |
| — | 12.00 | — | — | ||
| Supply & providing of exothermic weld connection | — | — | — | 7,488 | |
| — | 3.00 | — | — | ||
| Supply of TPN DB-7 segment 12 way DB comprising of 100A MCCB and outgoings by 2 Nos. of 63A FP MCBs, 2 Nos. of 20A DP MCBs, 2 Nos. of 63A FP RCCBs with 100ma sensitivity complete with copper busbar etc. | — | — | — | 79,881 | |
| — | 3.00 | — | — | ||
| Erection, Testing and commissioning of TPN DB-7 segment 12 way DB comprising of 100A MCCB and outgoings by 2 Nos. of 63A FP MCBs, 2 Nos. of 20A DP MCBs, 2 Nos. of 63A FP RCCBs with 100ma sensitivity complete with copper busbar etc. | — | — | — | 10,551 | |
| — | 24.00 | — | — | ||
| Supply of bulk head fitting IP43 with aluminium body, heat resistant glass cover and powder coated wire gurad including 10mm thick hylam sheet | — | — | — | 9,840 | |
| — | 24.00 | — | — | ||
| Erection of bulk head fitting IP43 with aluminium body, heat resistant glass cover and powder coated wire gurad including 10mm thick hylam sheet | — | — | — | 1,200 | |
| — | 100.00 | — | — | ||
| Supply of 100 mm 'B' class GI pipes as perIS:1239 along with accessories. | — | — | — | 78,400 | |
| — | 100.00 | — | — | ||
| Erection of 100 mm 'B' class GI pipes as perIS:1239 along with accessories. | — | — | — | 10,900 | |
| — | 50.00 | — | — | ||
| Supply of 50mm 'B' class GI pipes as per IS:1239 along with accessories. | — | — | — | 14,600 | |
| — | 50.00 | — | — | ||
| Erection of 50mm 'B' class GI pipes as per IS:1239 along with accessories. | — | — | — | 2,000 | |
| — | 550.00 | — | — | ||
| Supply of 50 mm of HDPE pipes of Grade PE-100, PN 6(6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 | — | — | — | 44,000 | |
| — | 550.00 | — | — | ||
| Erection of 50 mm of HDPE pipes of Grade PE-100, PN 6(6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 | — | — | — | 6,050 | |
| — | 2050.00 | — | — | ||
| Supply of 63 mm of HDPE pipes of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 | — | — | — | 2,39,850 | |
| — | 2050.00 | — | — | ||
| Erection of 63 mm of HDPE pipes of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 | — | — | — | 32,800 | |
| — | 700.00 | — | — | ||
| Supply of 110 mm size of HDPE pipe of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 (SDR - 21) | — | — | — | 2,56,900 | |
| — | 700.00 | — | — | ||
| Erection of 110 mm size of HDPE pipe of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 (SDR - 21) | — | — | — | 35,000 | |
| — | 4050.00 | — | — | ||
| Supply of 4 core 50 Sqmm LTUG XLPE aluminium armoured cable as per IS 7098 Part I alongwith end terminations. | — | — | — | 14,13,450 | |
| — | 4050.00 | — | — | ||
| Erection of 4 core 50 Sqmm LTUG XLPE aluminium armoured cable as per IS 7098 Part I alongwith end terminations. | — | — | — | 1,98,450 | |
| — | 2550.00 | — | — | ||
| Supply of 4 core x25 Sqmm LTU G XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 5,61,000 | |
| — | 2550.00 | — | — | ||
| Erection of 4 core x25 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 63,750 | |
| — | 2100.00 | — | — | ||
| Supply of 4 core x16 Sqmm LTU G XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 3,25,500 | |
| — | 2100.00 | — | — | ||
| Erection of 4 core x16 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 44,100 | |
| — | 1400.00 | — | — | ||
| Supply of 4 core x120 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 10,76,600 | |
| — | 1400.00 | — | — | ||
| Erection of 4 core x120 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 1,49,800 | |
| — | 700.00 | — | — | ||
| Supply of 4 core x95 Sqmm LTU G XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 4,35,400 | |
| — | 700.00 | — | — | ||
| Erection of 4 core x95 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 60,200 | |
| — | 2100.00 | — | — | ||
| Supply of 4 core x70 Sqmm LTU G XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 10,29,000 | |
| — | 2100.00 | — | — | ||
| Erection of 4 core x70 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 1,40,700 | |
| — | 800.00 | — | — | ||
| Supply of 2 core x70 Sqmm LTU G XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 1,81,600 | |
| — | 800.00 | — | — | ||
| Erection of 2 core x70 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 25,600 | |
| — | 16650.00 | — | — | ||
| Supply of 8 SWG GI wire. | — | — | — | 1,49,850 | |
| — | 16650.00 | — | — | ||
| Erection of 8 SWG GI wire. | — | — | — | 16,650 | |
| — | 26000.00 | — | — | ||
| Supply of 25mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 6,76,000 | |
| — | 26000.00 | — | — | ||
| Erection of 25mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 78,000 | |
| — | 4250.00 | — | — | ||
| Supply of 32mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 1,48,750 | |
| — | 4250.00 | — | — | ||
| Erection of 32mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 17,000 | |
| — | 800.00 | — | — | ||
| Supply of 25mm PVC casing and capping on wall along with accessories. | — | — | — | 16,000 | |
| — | 800.00 | — | — | ||
| Erection of 25mm PVC casing and capping on wall along with accessories. | — | — | — | 2,400 | |
| — | 150.00 | — | — | ||
| Supply of 32mm PVC casing and capping on wall along with accessories. | — | — | — | 3,900 | |
| — | 150.00 | — | — | ||
| Erection of 32mm PVC casing and capping on wall along with accessories. | — | — | — | 450 | |
| — | 250.00 | — | — | ||
| Supply & erection of 25mm Flexible pipes as per BIS-9537 (latest) along with accessories. | — | — | — | 5,000 | |
| — | 7900.00 | — | — | ||
| Cutting and chipping the wall for laying the PVC conduit pipe and plastering after laying the PVC conduit pipe with cement and sand mortar mixed with 1:8 ratio, but without laying PVC conduit pipe. | — | — | — | 3,08,100 | |
| — | 10000.00 | — | — | ||
| Supply of 2Nos. of 1.5 Sq.mm, of FRLS PVC insulated flexible multistrand copper wire | — | — | — | 3,00,000 | |
| — | 10000.00 | — | — | ||
| Erection of 2Nos. of 1.5 Sq.mm, o f FRLS PVC insulated flexible multistrand copper wire | — | — | — | 40,000 | |
| — | 37700.00 | — | — | ||
| Supply of 3Nos. of 1.5 Sq.mm, of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 18,47,300 | |
| — | 37700.00 | — | — | ||
| Erection of 3Nos. of 1.5 Sq.mm, o f FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 2,26,200 | |
| — | 16600.00 | — | — | ||
| Supply of 2 Nos.. of 2.5 Sq.mm, 1No. 1.5 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire. | — | — | — | 10,62,400 | |
| — | 16600.00 | — | — | ||
| Erection of 2 Nos.. of 2.5 Sq.mm, 1No. 1.5 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire. | — | — | — | 1,32,800 | |
| — | 5800.00 | — | — | ||
| Supply of 2Nos.. of 4.0 Sq.mm, 1No. 2.5 sq.mm of FR LS PVC insulated flexible multistrand copper wire including earth continuity wire. | — | — | — | 5,56,800 | |
| — | 5800.00 | — | — | ||
| Erection of 2Nos.. of 4.0 Sq.mm, 1No. 2.5 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire. | — | — | — | 69,600 | |
| — | 870.00 | — | — | ||
| Supply of single core multi strand 4 sq. mm FRLS Cu.Conductor | — | — | — | 40,020 | |
| — | 870.00 | — | — | ||
| Laying , connecting & commissioning of single core multi strand 4 sq. mm FRLS Cu.Conductor | — | — | — | 3,480 | |
| — | 870.00 | — | — | ||
| Supply of single core multi strand 6 sq. mm FRLS Cu.Conductor | — | — | — | 83,520 | |
| — | 870.00 | — | — | ||
| Laying , connecting & commissioning of single core multi strand 6 sq. mm FRLS Cu.Conductor | — | — | — | 5,220 | |
| — | 770.00 | — | — | ||
| Supply of single core multi strand 10 sq. mm FRLS Cu.Conductor | — | — | — | 92,400 | |
| — | 770.00 | — | — | ||
| Laying , connecting & commissioning of single core multi strand 10 sq. mm FRLS Cu.Conductor | — | — | — | 6,160 | |
| — | 153.00 | — | — | ||
| Supply of 1 or 2 module GI concealed sheet metal boxes | — | — | — | 5,049 | |
| — | 153.00 | — | — | ||
| Erection of 1 or 2 module GI concealed sheet metal boxes | — | — | — | 612 | |
| — | 177.00 | — | — | ||
| Supply of 3 module GI concealed sheet metal boxes | — | — | — | 8,142 | |
| — | 177.00 | — | — | ||
| Erection of 3 module GI concealed sheet metal boxes | — | — | — | 1,062 | |
| — | 123.00 | — | — | ||
| Supply of 4 module GI concealed sheet metal boxes | — | — | — | 6,765 | |
| — | 123.00 | — | — | ||
| Erection of 4 module GI concealed sheet metal boxes | — | — | — | 861 | |
| — | 154.00 | — | — | ||
| Supply of 6 module GI concealed sheet metal boxes | — | — | — | 11,550 | |
| — | 154.00 | — | — | ||
| Erection of 6 module GI concealed sheet metal boxes | — | — | — | 1,540 | |
| — | 145.00 | — | — | ||
| Supply of 8 or 9 module GI concealed sheet metal boxes | — | — | — | 14,210 | |
| — | 145.00 | — | — | ||
| Erection of 8 or 9 module GI concealed sheet metal boxes | — | — | — | 1,885 | |
| — | 143.00 | — | — | ||
| Supply of 12 module GI concealed sheet metal boxes | — | — | — | 17,303 | |
| — | 143.00 | — | — | ||
| Erection of 12 module GI concealed sheet metal boxes | — | — | — | 2,288 | |
| — | 153.00 | — | — | ||
| Supply of 1 or 2 modular plates with frame | — | — | — | 7,038 | |
| — | 153.00 | — | — | ||
| Erection of 1 or 2 modular plates with frame | — | — | — | 1,071 | |
| — | 189.00 | — | — | ||
| Supply of 3 modular plates with frame | — | — | — | 10,962 | |
| — | 189.00 | — | — | ||
| Erection of 3 modular plates with frame | — | — | — | 1,512 | |
| — | 125.00 | — | — | ||
| Supply of 4 modular plates with frame | — | — | — | 9,750 | |
| — | 125.00 | — | — | ||
| Erection of 4 modular plates with frame | — | — | — | 1,375 | |
| — | 166.00 | — | — | ||
| Supply of 6 modular plates with frame | — | — | — | 16,102 | |
| — | 166.00 | — | — | ||
| Erection of 6 modular plates with frame | — | — | — | 4,150 | |
| — | 157.00 | — | — | ||
| Supply of 8 or 9 modular plates with frame | — | — | — | 20,096 | |
| — | 157.00 | — | — | ||
| Erection of 8 or 9 modular plates with frame | — | — | — | 3,925 | |
| — | 155.00 | — | — | ||
| Supply of 12 modular plates with frame | — | — | — | 24,645 | |
| — | 155.00 | — | — | ||
| Erection of 12 modular plates with frame | — | — | — | 4,650 | |
| — | 12.00 | — | — | ||
| Supply of 3 way module size GI sheet metal/PVC box inconcealed/surface similar to GM makeor equivalent asper the directions of Engineer at site with accessories | — | — | — | 552 | |
| — | 12.00 | — | — | ||
| Erection of 3 way module size GI sheet metal/PVC box inconcealed/surface similar to GM makeor equivalent asper the directions of Engineer at site with accessories | — | — | — | 180 | |
| — | 2.00 | — | — | ||
| Supply of 4 way module size GI sheet metal/PVC box in concealed/surface similar to GM make or equivalent as per the directions of Engineer at site | — | — | — | 112 | |
| — | 2.00 | — | — | ||
| Erection of 4 way module size GI sheet metal/PVC box in concealed/surface similar to GM make or equivalent as per the directions of Engineer at site | — | — | — | 40 | |
| — | 12.00 | — | — | ||
| Supply of 6 way module size GI sheet metal/PVC box inconcealed/surfacesimilar to GM makeor equivalent asper the directions of Engineer at site with accessories | — | — | — | 852 | |
| — | 12.00 | — | — | ||
| Erection of 6 way module size GI sheet metal/PVC box inconcealed/surfacesimilar to GM makeor equivalent asper the directions of Engineer at site with accessories | — | — | — | 300 | |
| — | 12.00 | — | — | ||
| Supply of 8 way module size GI sheet metal/PVC box inconcealed/surfacesimilar to GM makeor equivalent asper the directions of Engineer at site with accessories | — | — | — | 1,164 | |
| — | 12.00 | — | — | ||
| Erection of 8 way module size GI sheet metal/PVC box inconcealed/surfacesimilar to GM makeor equivalent asper the directions of Engineer at site with accessories | — | — | — | 300 | |
| — | 12.00 | — | — | ||
| Supply of 12 way module size GI sheetmetal/PVC box inconcealed/surfacesimilar to GM make or equivalent asper the directions of Engineer at site with accessories | — | — | — | 1,536 | |
| — | 12.00 | — | — | ||
| Erection of 12 way module size GI sheetmetal/PVC box inconcealed/surfacesimilar to GM make or equivalent asper the directions of Engineer at site with accessories | — | — | — | 360 | |
| — | 3320.00 | — | — | ||
| Supply of 6/10A 1-way modular switch | — | — | — | 1,29,480 | |
| — | 3320.00 | — | — | ||
| Erection of 6/10A 1-way modular switch | — | — | — | 16,600 | |
| — | 640.00 | — | — | ||
| Supply of 6/10A multi socket for cell phone pin or 2pin +3 pin with safety shutter | — | — | — | 58,240 | |
| — | 640.00 | — | — | ||
| Erection of 6/10A multi socket for cell phone pin or 2pin +3 pin with safety shutter | — | — | — | 7,680 | |
| — | 265.00 | — | — | ||
| Supply of 16/20A one way modular switch | — | — | — | 23,585 | |
| — | 265.00 | — | — | ||
| Erection of 16/20A one way modular switch | — | — | — | 3,180 | |
| — | 260.00 | — | — | ||
| Supply of 6&16/20A twin socket heavy duty socket with safety shutter | — | — | — | 40,300 | |
| — | 260.00 | — | — | ||
| Erection of 6&16/20A twin socket heavy duty socket with safety shutter | — | — | — | 5,460 | |
| — | 50.00 | — | — | ||
| Supply of modular MCB 32A DP 1-Way switch with LED indicator 2 module | — | — | — | 19,950 | |
| — | 50.00 | — | — | ||
| Erection of modular MCB 32A DP 1-Way switch with LED indicator 2 module | — | — | — | 1,950 | |
| — | 65.00 | — | — | ||
| Supply of modular MCB DP 20/25 A capacity similar to GM make as per the directions of engineer at site (for ac units) | — | — | — | 21,775 | |
| — | 65.00 | — | — | ||
| Fixing of modular MCB DP 20/25 A capacity similar to GM make as per the directions of engineer at site (for ac units) | — | — | — | 6,500 | |
| — | 20.00 | — | — | ||
| Supply of 10 A sp modular MCB | — | — | — | 5,720 | |
| — | 20.00 | — | — | ||
| Erection of 10 A sp modular MCB | — | — | — | 800.8 | |
| — | 855.00 | — | — | ||
| Supply of Ceiling rose (3-terminal). | — | — | — | 18,810 | |
| — | 855.00 | — | — | ||
| Erection of Ceiling rose (3-terminal). | — | — | — | 2,565 | |
| — | 145.00 | — | — | ||
| Supply of Angle holders | — | — | — | 3,480 | |
| — | 145.00 | — | — | ||
| Erection of Angle holders | — | — | — | 435 | |
| — | 225.00 | — | — | ||
| Supply of BLDC fans 1200mm sweep with remote | — | — | — | 5,31,000 | |
| — | 225.00 | — | — | ||
| Erection of BLDC fans 1200mm sweep with remote | — | — | — | 22,500 | |
| — | 43.00 | — | — | ||
| Supply of Modular type exhaust fan 300mm/380mm | — | — | — | 55,728 | |
| — | 43.00 | — | — | ||
| Erection of Modular type exhaust fan 300mm/380mm | — | — | — | 11,137 | |
| — | 40.00 | — | — | ||
| Supply of window mount 12"" sweep heavy duty exhaust fan made of alloy steel of 50-55 w with complete with all accessories | — | — | — | 94,800 | |
| — | 40.00 | — | — | ||
| Fixing and connecting of window mount 12"" sweep heavy duty exhaust fan made of alloy steel of 50-55 w with complete with all accessories | — | — | — | 10,360 | |
| — | 23.00 | — | — | ||
| Supply & fixing of Ding dong call bell | — | — | — | 5,290 | |
| — | 23.00 | — | — | ||
| Supply & erection of modular type bell push switch as per the directions of Engineer at site | — | — | — | 3,197 | |
| — | 50.00 | — | — | ||
| Supply of Foot Lamp light(4module) with support frame &plate (3Nos of 0.5W LEDs | — | — | — | 21,900 | |
| — | 50.00 | — | — | ||
| Erection of Foot Lamp light(4module) with support frame &plate (3Nos of 0.5W LEDs | — | — | — | 1,050 | |
| — | 155.00 | — | — | ||
| Supply of 9w LED bulb | — | — | — | 23,250 | |
| — | 155.00 | — | — | ||
| Erection of 9w LED bulb | — | — | — | 775 | |
| — | 50.00 | — | — | ||
| Supply of LED based reading light fitting 360 degree tiltable type based reading light fitting | — | — | — | 93,350 | |
| — | 50.00 | — | — | ||
| Erection of LED based reading light fitting 360 degree tiltable type based reading light fitting | — | — | — | 2,600 | |
| — | 25.00 | — | — | ||
| Supply of 200 W LED Flood light fixture complete with necessary mounting accessories, clamps and hardware etc as per specification enclosed. | — | — | — | 2,14,975 | |
| — | 25.00 | — | — | ||
| Erection, connecting, testing and commissioning of 200 W LED Flood light fixture complete with necessary mounting accessories, clamps and hardware etc as per specification enclosed. | — | — | — | 2,150 | |
| — | 440.00 | — | — | ||
| Supply of integrated T8 20W LED (indoor type) tube light fixture complete with necessary mounting accessories, clamps and hardware etc. as per specification enclosed. | — | — | — | 1,62,360 | |
| — | 440.00 | — | — | ||
| Erection,connecting, testing and commissioning of integrated T8 20W LED (indoor type) tube light fixture complete with necessary mounting accessories, clamps and hardware etc. as per specification enclosed. | — | — | — | 18,920 | |
| — | 270.00 | — | — | ||
| Supply of surface mounted LED 40W luminaire batten type fitting complete with necessary mounting accessories, clamps and hardware etc. as per specification enclosed. | — | — | — | 1,55,250 | |
| — | 270.00 | — | — | ||
| Erection, connecting, testing and commissioning of surface mounted LED 40W luminaire batten type fitting complete with necessary mounting accessories, clamps and hardware etc. as per specification enclosed. | — | — | — | 21,870 | |
| — | 600.00 | — | — | ||
| Supply of recess 15 W LED Round Down lighters with diffuser and electronic driver complete with necessary mounting accessories, clamps and hardware etc as per specification enclosed. | — | — | — | 3,53,400 | |
| — | 600.00 | — | — | ||
| Erection, connecting, testing and commissioning of recess 15 W LED Round Down lighters with diffuser and electronic driver complete with necessary mounting accessories, clamps and hardware etc as per specification enclosed. | — | — | — | 29,400 | |
| — | 30.00 | — | — | ||
| Supply of 1' x 1' 18 W LED celling surface light fitting including power LEDs complete with all accessories as per specification enclosed | — | — | — | 61,710 | |
| — | 30.00 | — | — | ||
| Erection of 1' x 1' 18 W LED celling surface light fitting including power LEDs complete with all accessories as per specification enclosed | — | — | — | 1,380 | |
| — | 135.00 | — | — | ||
| Supply of 2'X2', 43W LED luminaire complete with necessary mounting accessories, clamps and Hardware etc, as per specification enclosed. | — | — | — | 3,99,465 | |
| — | 135.00 | — | — | ||
| Erection, connecting testing and commissioning of 2'X2', 43W LED luminaire complete with necessary mounting accessories, clamps and Hardware etc, as per specification enclosed. | — | — | — | 6,750 | |
| — | 138.00 | — | — | ||
| Supply of 10 W LED Indoor type tube light fitting as per specification enclosed. | — | — | — | 37,260 | |
| — | 138.00 | — | — | ||
| Erection of 10 W LED Indoor type tube light fitting as per specification enclosed. | — | — | — | 4,140 | |
| — | 45.00 | — | — | ||
| Supply of following sizes of 5 mtr hot dip galvanised double arm Conicle poles with foundation bolts, base plate, MCB & brackets. | — | — | — | 4,71,780 | |
| — | 45.00 | — | — | ||
| Erection of following sizes of 5 mtr hot dip galvanised double arm Conicle poles with foundation bolts, base plate, MCB & brackets. | — | — | — | 62,325 | |
| — | 105.00 | — | — | ||
| Supply of 40W LED Street light luminarie made up of pressure die cast aluminum housing with high efficiency LED as lighting source and lens with toughened glass having bottom opening separate driver compartment with IP 66 protection suitable to operate with necessary mounting accessories, clamps and hardware etc as per specification enclosed. | — | — | — | 1,57,500 | |
| — | 105.00 | — | — | ||
| Erection, connecting, testing and commissioning of 40W LED Street light luminarie made up of pressure die cast aluminum housing with high efficiency LED as lighting source and lens with toughened glass having bottom opening separate driver compartment with IP 66 protection suitable to operate with necessary mounting accessories, clamps and hardware etc as per specification enclosed. | — | — | — | 7,875 | |
| — | 30.00 | — | — | ||
| Supply of 100W LED Highbay light with PDC housing suitable for celing ( Surface/Suspended) mounting with System efficiency 150LM/W, complete with necessary mounting accessories, clamps and hardware etc, as per Specification enclosed | — | — | — | 1,65,000 | |
| — | 30.00 | — | — | ||
| Erection, connecting, testing and commissioning of 100W LED Highbay light with PDC housing suitable for celing ( Surface/Suspended) mounting with System efficiency 150LM/W, complete with necessary mounting accessories, clamps and hardware etc, as per Specification enclosed | — | — | — | 1,650 | |
| — | 17.00 | — | — | ||
| "Supply of 12 way Vertical TPN IP 54 distribution board similar to Legrand model No.507753 as per IEC 61439/3 or latest fixed on wall with the following switches 1X160A 25KA4pole Electronic release with inbuilt earth leakage module of adjustable sensitivity maximumoperative voltage 690V compatibility MCCB I/C and 4 x 63 A 10KA 'C' Curve TPMCB out going,4 x 32 A 10KA 'C' Curve TPMCB out going, 4 x 20 A 10KA DP 'C' Curve MCB out going, 4x10A'C' Curve SPMCB out going with all other connected accessories etc. Note: MCCBs: ICs=100%ICu " | — | — | — | 9,30,631 | |
| — | 17.00 | — | — | ||
| Fixing of 12 way Vertical TPN IP 54 distribution board similar to Legrand model No.507753 as per IEC 61439/3 or latest fixed on wall with the following switches 1X160A 25KA4pole Electronic release with inbuilt earth leakage module of adjustable sensitivity maximumoperative voltage 690V compatibility MCCB I/C and 4 x 63 A 10KA 'C' Curve TPMCB out going,4 x 32 A 10KA 'C' Curve TPMCB out going, 4 x 20 A 10KA DP 'C' Curve MCB out going, 4x10A'C' Curve SPMCB out going with all other connected accessories etc. Note: MCCBs: ICs=100%ICu " | — | — | — | 68,000 | |
| — | 1.20 | — | — | ||
| Design, fabrication, supply, erection, testing, Commissioning of indoor LT panel board with 14SWG ( with powder coated RAL 7032 ) with suitable Bus bar 600 A capacity , Digital MFM with RS485 , digital voltmeter, digital ammeter with CTS, indication lamps etc for each incomer, and for housing of following switchgear , 250A 4P MCCB for I/C-01 No's, 3x100A 4 pole MCCBs, 4x63A 4 pole MCCBS , 2X32A MCCBS complete with accessories etc Note: Before fabrication drawing approval is to be taken from Sr.DEE/M/SC-3) (1) All cables terminations to be done along with double compression glands and required lugs. as per the direction of Engineer at site. | — | — | — | 1,36,072.8 | |
| — | 0.70 | — | — | ||
| Design, fabrication, supply, erection, testing, Commissioning of Outdoor LT panel board with 14SWG ( with powder coated RAL 7032 ) with suitable Bus bar 600A capacity , Digital MFM ,digital voltmeter, digital ammeter with CTs, indication lamps etc, for housing of following switchgear, 3x100A 4 pole MCCB ,4x63A MCCBS , 2x32A MCCBS , complete with accessories, etc Note: Before fabrication drawing approval is to be taken from Sr.DEE/M/SC-3) (1) All cables terminations to be done along with double compression glands and required lugs. as per the direction of Engineer at site. | — | — | — | 79,375.8 | |
| — | 2.60 | — | — | ||
| Design, fabrication, supply, erection, testing, Commissioning of Outdoor LT panel board with 14SWG ( with powder coated RAL 7032 ) with suitable Bus bar 300A capacity , Digital MFM ,digital voltmeter, digital ammeter with CTs, indication lamps etc, for housing of following switchgear 250A 4P MCCB for I/C-01 No's, 4x100A 4 pole MCCB ,4x63A MCCBS , 2x32A MCCBS complete with accessories, etc Note: Before fabrication drawing approval is to be taken from Sr.DEE/M/SC-3) (1) All cables terminations to be done along with double compression glands and required lugs. as per the direction of Engineer at site. | — | — | — | 2,94,824.4 | |
| — | 1.50 | — | — | ||
| Design, fabrication, supply, erection, testing, Commissioning of Indoor LT panel board with 14SWG ( with powder coated RAL 7032 ) with suitable Bus bar 600A capacity , Digital MFM ,digital voltmeter, digital ammeter with CTs, indication lamps etc, for housing of following switchgear 250A 4P MCCB for I/C-01 No's, 2x100A 4 pole MCCB ,4x63A MCCBS , 4x32A MCCBS ,250 A COS complete with accessories, etc Note: Before fabrication drawing approval is to be taken from Sr.DEE/M/SC-3) (1) All cables terminations to be done along with double compression glands and required lugs. as per the direction of Engineer at site. | — | — | — | 1,70,091 | |
| — | 5.00 | — | — | ||
| Supply and Erection of Digital multi function panel meter with RS485 communication port. | — | — | — | 35,050 | |
| — | 15.00 | — | — | ||
| Supply of 8-way Double door (SPN) distribution boards (Sleek type) | — | — | — | 12,000 | |
| — | 15.00 | — | — | ||
| Erection of 8-way Double door (SPN) distribution boards (Sleek type) | — | — | — | 1,680 | |
| — | 45.00 | — | — | ||
| Supply of 12 way SPN double door distribution board | — | — | — | 68,175 | |
| — | 45.00 | — | — | ||
| Erection of 12 way SPN double door distribution board | — | — | — | 9,540 | |
| — | 8.00 | — | — | ||
| Supply of 16 way SPN double door distribution board | — | — | — | 14,992 | |
| — | 8.00 | — | — | ||
| Erection of 16 way SPN double door distribution board | — | — | — | 2,096 | |
| — | 74.00 | — | — | ||
| Supply of 25A DP RCCB with 30mA sensitivity | — | — | — | 1,40,452 | |
| — | 74.00 | — | — | ||
| Erection of 25A DP RCCB with 30mA sensitivity | — | — | — | 19,610 | |
| — | 9.00 | — | — | ||
| Supply of 40 amp 4pole 30mA RCCB as per the direction of the engineer at site. | — | — | — | 24,417 | |
| — | 9.00 | — | — | ||
| Fixing of 40 amp 4pole 30mA RCCB as per the direction of the engineer at site. | — | — | — | 2,943 | |
| — | 236.00 | — | — | ||
| Supply of 6/10/16/20/25/32A, C-curve DP MCBs with 10KA breaking capacity | — | — | — | 93,692 | |
| — | 236.00 | — | — | ||
| Erection of 6/10/16/20/25/32A, C-curve DP MCBs with 10KA breaking capacity | — | — | — | 12,980 | |
| — | 365.00 | — | — | ||
| Supply of 6/10/16/20/25/32A, C-curve SP MCBs with 10KA breaking capacity | — | — | — | 44,530 | |
| — | 365.00 | — | — | ||
| Erection of 6/10/16/20/25/32A, C-curve SP MCBs with 10KA breaking capacity | — | — | — | 6,205 | |
| — | 8.00 | — | — | ||
| Supply of 63A, C-curve FP MCB with 10KA breaking capacity | — | — | — | 10,040 | |
| — | 8.00 | — | — | ||
| Erection of 63A, C-curve FP MCB with 10KA breaking capacity | — | — | — | 1,400 | |
| — | 46.00 | — | — | ||
| Supply of 40A, C-curve FP MCB with 10KA breaking capacity | — | — | — | 45,126 | |
| — | 46.00 | — | — | ||
| Erection of 40A, C-curve FP MCB with 10KA breaking capacity | — | — | — | 5,934 | |
| — | 50.00 | — | — | ||
| Supply of 40A, C-curve DP MCB with 10KA breaking capacity | — | — | — | 24,150 | |
| — | 50.00 | — | — | ||
| Erection of 40A, C-curve DP MCB with 10KA breaking capacity | — | — | — | 3,200 | |
| — | 20.00 | — | — | ||
| Supply of 50/63A, C-curve DP MCB with 10KA breaking capacity | — | — | — | 13,200 | |
| — | 20.00 | — | — | ||
| Erection of 50/63A, C-curve DP MCB with 10KA breaking capacity | — | — | — | 1,840 | |
| — | 4.00 | — | — | ||
| Supply of 40 Ltr Water Coolers | — | — | — | 1,14,400 | |
| — | 4.00 | — | — | ||
| Erection of 40 Ltr Water Coolers | — | — | — | 5,720 | |
| — | 22.00 | — | — | ||
| Supply and erection ,testing and commissioning of ( desert coolers) Air coolers | — | — | — | 2,04,270 | |
| — | 2.00 | — | — | ||
| Supply of 150 Ltr Water Coolers | — | — | — | 95,396 | |
| — | 2.00 | — | — | ||
| Erection of 150 Ltr Water Coolers | — | — | — | 4,768 | |
| — | 4.00 | — | — | ||
| Supply and erection of Time switch daily operating type | — | — | — | 17,152 | |
| — | 4.00 | — | — | ||
| Supply and erection of Power contactor 25A capacity 2 NO type | — | — | — | 6,840 | |
| — | 1.00 | — | — | ||
| Design, Supply, erection, fixing and commissioning of 10 KWp rooftop on-grid solar plant with MPPTtechnology with Mono PERC Bifacial solar modules of 535wp or above,ModuleMounting Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT),Inverter (10KW output puresine wave inverterwith RMS), and Controls and Protections, interconnect cables and switches ,all complete as per the standard specifications as per the direction of site Engineer, | — | — | — | 4,77,105.45 | |
| — | 1.00 | — | — | ||
| Supply, erection, connecting, testing and commissioning of 5.0 HP 43 stage Energy efficient Vertical submersible pump set , Three Phase ,415 Vol, suitable for 100mm dia bore well pump set Delivery size : 32mm, Head 284 Mtr ,LPM @58"44@ RPM :2880 | — | — | — | 65,100 | |
| — | 1.00 | — | — | ||
| Supply & fixing of control panel consisting of DOL starter, single phase preventer with power automatic ON & OFF system, with dry run, pilot lamps, selector switch, Voltmeter, Ammeter in suitable sheet steel box of 16 SWG upto 7.5HP pumps including all connected accessories as per the directions of engineer at site. | — | — | — | 15,550 | |
| — | 250.00 | — | — | ||
| Supply of 3 core 4Sq.mm copper flat cable as per the direction of site Engineer. | — | — | — | 37,500 | |
| — | 250.00 | — | — | ||
| "Laying, connecting and commissioning of 3 core 4Sq.mm copper flat cable as per the direction of site Engineer." | — | — | — | 4,000 | |
| — | 250.00 | — | — | ||
| Supply of 40mm of HDPE pipes of Grade PE-100, PN 16 (16Kg/Cm2 Capacity) with accessories as per IS 4984 - 2016 (SDR-21) | — | — | — | 40,750 | |
| — | 250.00 | — | — | ||
| Erection of 40mm of HDPE pipes of Grade PE-100, PN 16 (16Kg/Cm2 Capacity) with accessories as per IS 4984 - 2016 (SDR-21) | — | — | — | 7,000 | |
| — | 3.00 | — | — | ||
| Supply, fixing, connecting, testing & commissioning of Power Analyzer formonitoring frequency | — | — | — | 2,13,300 | |
| — | 9.00 | — | — | ||
| "Supply,erection,connecting,testing and commissioning of Single phase smart meters 10-60A, whole current, Static smart meters of accuracy class 1.0, BIS Certified, IS:16444 Compliance, Export / Import, Prepaid, Remote Load Control, Disconnection & Reconnection, GPRS (SIM) based WBIOT communication defined in IS 16444, TOD Tariff, Registering & Communicating electrical parameters and events in 15 minutes time intervals,. Note : The price is inclusive of Implementationof cloud hosted Head EndSystem andmeter datamanagementweb-basedsoftware permeter - OneTime with 1 year of Defect Liability Period( DLP ). " | — | — | — | 63,117 | |
| — | 9.00 | — | — | ||
| Supply and Installation of Poly carbonateMeter box (IP-54)for Single Phasemeter by Removing existingmeter) | — | — | — | 9,900 | |
| — | 47.00 | — | — | ||
| Supply and fixing of Occupancy Infrared motion sensor 2 module similar to Model no.6772 51 of Legrand make or equavalant Havells/GM/L&T/Havells make with all necessary accessories complete. | — | — | — | 65,659 | |
| — | 7.00 | — | — | ||
| Supply and fixing, Transportation of Sheet iron Junction Box for 4Core 120sqmm Cable termination with 250A suitable copper busbar capacity JB of size 18x18"X12" | — | — | — | 54,600 | |
| — | 13.00 | — | — | ||
| Supply and Erection of cable Termination Jn.box made-up of thermoplastic suitable for termination of 25 / 35 / 50sq.mm cables with IP 55 / IP 65 protection the suitable clamping arrangements for fixing to pole or wall. | — | — | — | 69,751.5 | |
| — | 68.00 | — | — | ||
| Supply of SMC 4 terminal junction Box with Accessories | — | — | — | 43,928 | |
| — | 68.00 | — | — | ||
| Erection of SMC 4 terminal junction Box with Accessories | — | — | — | 1,700 | |
| — | 5.00 | — | — | ||
| Supply, installation,testing, gas charging & commissioning of 2TR capacity, Inverter type, copper coil, BEE star cassette AC unit with all connected accessories. | — | — | — | 5,69,600 | |
| — | 5.00 | — | — | ||
| Supply, installation,testing, gas charging & commissioning of 3TR capacity Inverter type,copper coil, BEE star cassette AC unit with all connected accessories. | — | — | — | 7,87,500 | |
| — | 200.00 | — | — | ||
| Supply, installation of Hard/Soft Copper Refrigerant Piping complete with fittings,elbow, bends, supporting arrangements on wall for 2/3TR Cassette as per the direction of Engineer at site. | — | — | — | 2,24,200 | |
| — | 10.00 | — | — | ||
| Supply, fabrication and fixing of suitable size out door wall mounted chair type MS base frame stand for outdoor unit2/ 3.0TR cassette unit including all connected accessories etc. | — | — | — | 23,600 | |
| — | 21.00 | — | — | ||
| Supply, installation, testing and comissioning of 5 star inverter type 1.5 Ton capacity split type Air conditioning unit complete, conforming to IS: 1391(Part-2)-1992 with amdts No.1 to 4 fitted with rotary compressor suitable for using HCFC refrigerant or latest for wall mounting as per specification enclosed. | — | — | — | 10,39,626 | |
| — | 94.50 | — | — | ||
| Supply of copper pipe 1/4" & 1/2" of 20 SWG along with 9 mm thickness insulation | — | — | — | 99,508.5 | |
| — | 94.50 | — | — | ||
| Supply of 1" CPVC Drain pipe with all connected accessories as per site requirement. | — | — | — | 13,702.5 | |
| — | 210.00 | — | — | ||
| Supply and fixing of ISI 38/40mm width and 12.5mm height PVC pipe/Casing and Caping, with necessary screws including joints bends and all necessary accessories complete. | — | — | — | 13,230 | |
| — | 210.00 | — | — | ||
| Supply and run of 2 nos, 6.0 sqmm, 1100 V PVC (FRLS) insulated flexible copper conductor wires and one run of 2.5 sqmm PVC (FRLS) insulated flexible copper cable for earthing in existing PVC conduit/Casing and capping pipe. | — | — | — | 13,230 | |
| — | 18.00 | — | — | ||
| Supply of 63A 4 pole MCCB with 16KA breaking capacity with Adjustable thermal magnetic release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 63,720 | |
| — | 18.00 | — | — | ||
| Erection of 63A 4 pole MCCB with 16KA breaking capacity with Adjustable thermal magnetic release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 8,910 | |
| — | 10.00 | — | — | ||
| Supply of 32A 4 pole MCCBs with 16 KA breaking capacity with Adjustable thermal magnetic release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 35,400 | |
| — | 10.00 | — | — | ||
| Erection of 32A 4 pole MCCBs with 16 KA breaking capacity with Adjustable thermal magnetic release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 4,950 | |
| — | 4.00 | — | — | ||
| Supply of 250A 4 pole MCCB with 36KA breaking capacity with LSIG Micro processor based release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 1,07,996 | |
| — | 4.00 | — | — | ||
| Erection of 250A 4 pole MCCB with 36KA breaking capacity with LSIG Micro processor based release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 10,796 | |
| — | 1.00 | — | — | ||
| Supply and erection of 250 A 4P On-load Change over switch in open execution with complete with accessories etc. | — | — | — | 15,152.88 | |
| — | 16.00 | — | — | ||
| Supply of 100A 4 pole MCCB with 25KA breaking capacity with Adjustable thermal magnetic release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 90,016 | |
| — | 16.00 | — | — | ||
| Erection of 100A 4 pole MCCB with 25KA breaking capacity with Adjustable thermal magnetic release with extended rotor handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 8,992 | |
| — | 1.00 | — | — | ||
| Supply and erection encloser for MCCBs | — | — | — | 1,604 | |
| — | 28.00 | — | — | ||
| Supply of 25 Lt Geyser(5 star rated) | — | — | — | 2,64,012 | |
| — | 28.00 | — | — | ||
| Erection of 25 Lt Geyser(5 star rated) | — | — | — | 5,600 | |
| — | 0.50 | — | — | ||
| Supply and erection of fabricated small parts steel (Galavanised). | — | — | — | 45,997.5 | |
| — | 2.00 | — | — | ||
| Dismantlement of old lifts at RSB Building | — | — | — | 2,99,720 | |
| — | 1.50 | — | — | ||
| Design, fabrication, supply, erection, testing, Commissioning of Indoor LT panel board with 14SWG ( with powder coated RAL 7032 ) with suitable Bus bar 600A capacity , Digital MFM ,digital voltmeter, digital ammeter with CTs, indication lamps etc, for housing of following switchgear 250A 4P MCCB for I/C-01 No's, 2x100A 4 pole MCCB ,4x63A MCCBS , 2x32A MCCBS complete with accessories, etc Note: Before fabrication drawing approval is to be taken from Sr.DEE/M/SC-3) (1) All cables terminations to be done along with double compression glands and required lugs. as per the direction of Engineer at site. | — | — | — | 1,70,091 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1_Tender_Booklet_E_M_SC_05_OSW_SW_OT_2026_27.pdf Tender Booklet
ATTACHMENT
2_Breakup_Quantities.pdf
ATTACHMENT
3_GCC_April-2022_withcorrectionslips.pdf
ATTACHMENT
1_Tender_Booklet_E_M_SC_05_OSW_SW_OT_2026_27.pdf
ATTACHMENT
Tender_Booklet_E_M_SC_05_OSW_SW_OT_2026_27_Corrigendum_1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .