| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.5 LAccepted-AOC GANDHI NAGAR DISTRICT MAHOBA UTTAR PRADESH | MAHOBA | UTTAR PRADESH | 210421 | L1 | Accepted-AOC first lowest | |
| 2 | L2₹97.0 L+₹4.5 L (4.91%)Rejected-AOC | L2 | Rejected-AOC l2 | |
| 3 | Rejected-Technical | - | Rejected-Technical document incomplete | |
| 4 | Rejected-Technical | - | Rejected-Technical document incomplete | |
| 5 | Rejected-Technical | - | Rejected-Technical document incomplete |
Tender Value
₹98.1 L
EMD Value
₹2.0 L
Closing Date
30 Sept 2024, 12:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC, BAJARIYA, MAHOBA
Restoration work of Charkhari dal nahar from Km. 0.100 to Km. 3.500 (Lot-02)
2024_UPIDC_957677_2
02/SE/2024-25
Open Tender
Civil Works
Item Rate
120 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,872
₹2.0 L
19 Nov 2024
20 Sept 2024
30 Sept 2024
20 Sept 2024
30 Sept 2024
20 Sept 2024
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST)
Jungle Clearance cutting heavy under growth and bushes upto 7.50 cm diameter with collection and removal of roots with collection & Removal including all cost of material, labour, T&P etc. complete .
Dismantaling cement concrete brick or floor including stacking of dismantled materials within a distance of 60m.
Earth work in foundation of walls, piers, abutments etc with disposal initial lead & lift including all cost of material, labour, T&P etc. completion of work.
Earth work in Mar,Ranker & Kanker mixed soils in digging or in embankment including lead upto 30 m. and inial lift up to 1.50 m. including dressing making profile and manual compaction but excluding mechanical compaction.
Earth work in filling in Mar, Kabar, Ranker & Kanker mixed soil including with 1 Km. lead and inial lift including all cost of material, labour, T&P etc. complete.
Dewatering including all cost of maetrial labour t&p etc completion of work.
Laying sand in foundation & C.C. sleeper with all cost of material labour T&P etc required for proper completion of work.
Providing and laying P.C.C. 1:3:6 cement concrete with 19mm. Size graded hard stone grit and coarse sand including cost of all material, labour and T&P required for proper completion of work.
Centering & Shuttering for plain C.C. work including cost of all material, labour and T&P etc. required for proper completion of work.
Centering & Shuttering for R.C.C. work including cost of all material, labour and T&P etc. required for proper completion of work.
Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all material, labour T&P etc required proper completion of work.
Providing & Laying R.C.C. 1:1½:3 including cost of all material, labour & T&P etc. required for proper completion of work.
Providing and laying C.C. 1:2:4 cement concrete with 11.2 mm to 19 mm. Size graded hard stone grit and coarse sand including all cost of all material, labour and T&P required for proper completion of work.
Providing & Laying C.C. 1:1½:3 including cost of all material, labour & T&P etc. required for proper completion of work.
Providing & Fixing P.V.C. pipe 100mm dia. including all cost of material, labour, T&P etc. complete.
Providing & Laying apron for bed protection with Stone Boulder Pitching wt 25-60 kg including cost of all material, labour, T&P etc. required for proper completion of work.
supplying , laying and fixing NP3 R.C.C. hume pipe 900 mm dia including carriage T&P material and labour etc for proper completion of work
Preparation of subgrade for lining work (excluding cost of earth works)including all cost of T&P and labour etc for proper completion of work
Providing & Laying C.C. 1:1½:3 for Lining work including cost of all material, labour & T&P etc. required for proper completion of work.
Laying 125 micron thick polythene sheet including all labour T&P etc. required for proper completion of work.
Construction joint of C.C. Lining with bitumen sealing compound.including all labour T&P etc. required for proper completion of work.
Laying two coat of bitumen sealing compound on top of sleepers of C.C. Lining works including all cost of labour Material T&P etc.
R.C.R. 1:3 Stone Masonry including all cost of material, labour, T&P etc. complete.
Struck Pointing (Lined or struck deep on Stone masonry in cement or lime) including all cost of material labour T&P etc. complete.
Cement Plaster with 1:3 Cement Mortar (cement and Coarse sand) including all cost of material, labour, T&P etc. complete.
Painting two coat on wall including scraping old paint including cost of all material, labour T&P etc. required for proper finish of work.
Saturated Earth work in Mar,Ranker & Kanker mixed soils in digging or in embankment including lead upto 30 m. and inial lift up to 1.50 m. including dressing making profile and manual compaction but excluding mechanical compaction.
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earth work and Dismantling of Masonry works as per Technical Specification.
M/S NIRANJAN SINGH CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .