Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.2 L+₹223.69 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.2 L
EMD Value
₹11,200
Closing Date
26 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of drain from main road to khanchi nallah via house of Mohd Maqbool Wani and others And construction of drain from house of Ab Salam Ganie to nallah khanchi via house of Mohd Ibrahim Wani and others
2026_RDPR_319045_52
NIT_30_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
PAKHERPORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹11,200
5 Oct 2026
3 Aug 2026
27 Aug 2026
3 Aug 2026
26 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Dismantling/demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per the direction of Engineer incharge | 7.76 | Cum | 1,064.55 | ₹8,260.91 |
| 0_) | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones. | 10.07 | Cum | 1,222 | ₹12,305.54 |
| 0_) | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate (including carriage of all materials) | 21.18 | cum | 6,310.45 | ₹1,33,655.33 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 117.45 | Sqm | 286.35 | ₹33,631.81 |
| 0_) | P/A 6mm thick cement plaster of mix 1:3 (1cement: 3 fine sand) (including carriage of all materials) . | 145.39 | Sqm | 240 | ₹34,893.6 |
| 6 | Add provision for Signboard/Photographs, carriage of cement/steel and other unforeseen items | 1 | Job | 940 | ₹940 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
BOQ_1055056.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .