| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.9 LAdmitted-Finance SHOP NO 4 BLOCK A MAKKA MASJID COMPLEX NEAR MAKKA MASJID BATHINDI JAMMU | JAMMU | JAMMU | JAMMU AND KASHMIR | -48.00% | ₹78.9 L | L1 | Admitted-Finance |
| 2 | L2₹86.9 LAdmitted-Finance | -42.71% | ₹86.9 L | L2 | Admitted-Finance |
| 3 | L3₹91.0 LAdmitted-Finance | -39.99% | ₹91.0 L | L3 | Admitted-Finance |
| 4 | L4₹1.1 CrAdmitted-Finance | -27.99% | ₹1.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.1 CrAdmitted-Finance NA | -25.91% | ₹1.1 Cr | L5 | Admitted-Finance |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
31 Jul 2026, 5:00 pmClosed
SE PMGSY Jammu
Office of the Superintending Engineer PMGSY Circle Jammu, Tiger Division Burma Dwar, Jammu Cant
Permanent restoration of roads from Dagair to Panaya JK05-062, Shoara to Kamdhani JK05-79 and Chigal to Kathar JK05-103
2026_JKRRD_148630_1
SE/PMGSY/J/24 of 2026-27 dated 09.07.2026
Open Tender
Civil Works - Roads
Percentage
180 days
Jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹6.6 L
SE Office PMGSY Jammu
24 Aug 2026
9 Jul 2026
1 Aug 2026
10 Jul 2026
31 Jul 2026
11 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Part A Dagair to Panaya JK05-79
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil. | 1,315 | Cum | 256.85 | ₹3,37,757.75 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum | 4,826.57 | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | 5,733.6 | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 6,540.45 | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 7,788.4 | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Cold twisted bars | - | Kg. | 123.2 | - |
| 0.0 | Supply and packing of stone boulder in GI wire crates apron complete as per design and technical specifications and directions of engineer in charge including cost of wire | - | Cum | 1,765.69 | - |
| 0.0 | Providing and laying river bed materials on road surface including watering and compaction with power road roller under optimum mositure condition to give at least dry density including all carriage lead lift loading handling rehanding complete. | 422 | Cum | 550 | ₹2,32,100 |
| 0.0 | Back filling behind R/wall Abutment wing wall Return wall as per drawing & technical specification. (with 50%Dumping stone including cost of stones in Horizontal on level and 50%Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc complete) | 330.27 | Cum | 578.15 | ₹1,90,945.6 |
| 0.0 | Demolishing R.C.C. work manually/by mechanical means including
stacking of steel bars and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge. | - | sqm | 2,516.85 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_233337.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].