| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.4 CrAccepted-AOC | ₹76.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹114.0 CrRejected-AOC 96 ELECTRONIC CITY COMPLEX BANGALORE KARNATAKA 560100 | BENGALURU URBAN | KARNATAKA | 560100 | ₹114.0 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹128.6 CrRejected-AOC | ₹128.6 Cr | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
Refer Docs
Closing Date
29 Sept 2022, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, WRD, Groundwater Circle, Taramani, Chennai-113
Setting up of Real Time Data Acquisition System, Hydro Modelling Flood Control Room at Ezhilagam and Flood Monitoring Centres for Water Resources Department Headquarters at Chepauk and four Collectorates
2022_MDBPW_242301_1
CRTFF / WRD / 01 / 2022
Open Tender
Electronics Equipment
150 days
As per bid document
As per Bid Document
5 documents required · 5 mandatory
₹0
Exempted
Chennai
7 Feb 2024
21 Jul 2022
29 Sept 2022
21 Jul 2022
29 Sept 2022
7 Sept 2022
21 Jul 2022 - 8 Aug 2022
4 Aug 2022
Amount
I Field Equipment ARG Locations with GPRS/ GSM- 63 Locations
ARG sensor with required accessories and mounting setup as per Technical Specification No: 8.1, 8.6.1, 8.8.1
Soil moisture Probe with required accessories and mounting setup as per Technical Specification No: 8.2, 8.6.1, 8.8.1
Civil works as per the drawing No: CFM-ARG
Installation, Testing and Commissioning
ARG Locations with GPRS/ GSM and L-Band Satellite Communication System- 23 Locations
ARG sensor with required accessories and mounting setup as per Technical Specification No: 8.1, 8.6.1 8.6.2, 8.8.1
Soil moisture Probe with required accessories and mounting setup as per Technical Specification No: 8.2, 8.6.1 8.6.2, 8.8.1
Civil works as per the drawing No: CFM-ARG
Installation, Testing and commissioning
AWS Locations with GPRS/ GSM- 2 Locations
AWS with GSM/GPRS mode of transmission as per Technical Specification No: 8.4, 8.6.2, 8.8.2
Civil works as per the drawing No: CFM-AWS
Installation, Testing and commissioning
AWS Locations with GPRS/ GSM and L-Band Satellite Communication System- 6 Locations
AWS with GSM/GPRS and L-Band Satellite Communication System mode of transmission as per Technical Specification No: 8.4 &8.6.1, 8.6.2, 8.8.2
Civil works as per the drawing No: CFM-AWS
Installation, Testing and commissioning
AWLR (SE) Locations with GPRS/ GSM in Existing Gauge well- in 76 Waterbody locations
AWLR with Shaft Encoder based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.1, 8.6.1, 8.8.1
Civil works as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (SE) Locations with GPRS/ GSM, L-Band Satellite Communication System in Existing Gauge well- in 2 Waterbody location
AWLR with Shaft Encoder based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity, as per Technical Specification No: 8.3.1, 8.6.2, 8.8.1
Civil works as per the drawing numbers in Annexure- Drawings and Technical Specification No:7
Installation, Testing and Commissioning
AWLR (SE) Locations with GPRS/ GSM in New Gauge well- in 11 Waterbody locations
AWLR with Shaft Encoder based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.1, 8.6.1, 8.8.1
Civil works for New Gauge well as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and Commissioning
AWLR (R ) Locations with GPRS/ GSM, New Frame and Radar based system- in 7 Waterbody locations
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity, as per Technical Specification No: 8.3.2, 8.6.1, 8.8.1
Required civil works for New Frame Structure, as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R) Locations with GPRS/ GSM, in New Frame and Radar based system- in 16 Waterway locations
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity, as per Technical Specification No: 8.3.2, 8.6.1, 8.8.1
Civil works for New Frame Structure as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and Commissioning
AWLR (R) Locations with GPRS/ GSM, L-Band Satellite Communication System, New Frame and Radar based system- in 12 Waterway locations
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity, as per Technical Specification No: 8.3.2, 8.6.2, 8.8.1
Civil works for New Frame/ Box Structure as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (SE) Locations with GPRS/ GSM in New Gauge well- in 4 Waterway locations
AWLR with Shaft Encoder based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.1, 8.6.1, 8.8.1
Civil works (New Gauge well) as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (SE) Locations with GPRS/ GSM, L-Band Satellite Communication System in New Gauge well- in 1 Waterway locations
AWLR with Shaft Encoder based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity, as per Technical Specification No: 8.3.1, 8.6.2, 8.8.1
Civil works for New Gauge well, as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR(R), AWS, Gate Sensor locations with GPRS/ GSM, L-Band Satellite Communication System (1 No.) - Chembarambakkam Lake
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity, as per Technical Specification No: 8.3.2, 8.6.2 & 8.8.2
AWS with sensors as per Technical Specification - Data Logger with min. 8 sensor connectivity as per Technical Specification No: 8.4, 8.6.2 & 8.8.2
Gate Sensors (24nos) with required accessories and mounting setup - Data Logger with min. 24 sensor connectivity 8.5, 8.6.2 & 8.8.2
CCTV Camera with inbuilt IR illuminator with required accessories and mounting setup
Civil works for AWS , AWLR and Gate Sensors including mounting frame as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and Commissioning
AWLR (R), AWS, Gate Sensor locations with GPRS/ GSM, L-Band Satellite Communication System (1 No.) - Poondi Lake
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger included with Gate Sensory as per Technical Specification No: 8.3.2, 8.6.2 & 8.8.2
AWS with sensors as per Technical Specification - Data Logger with min. 8 sensor connectivity as per Technical Specification No: 8.4, 8.6.2 & 8.8.2
Gate Sensors (16nos) with required accessories and mounting setup - Data Logger with min. 18 (Iincl 2 for AWLR) sensor connectivity as per Technical Specification No: 8.5, 8.6.2 & 8.8.2
CCTV Camera with inbuilt IR illuminator with required accessories and mounting setup
Civil works for AWS , AWLR and Gate Sensors including mounting frame as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R), AWS, Gate Sensor locations with GPRS/ GSM, L-Band Satellite Communication System (1 No.) - Redhills Lake
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with Gate sensor connectivity as per Technical Specification No: 8.3.2, 8.6.1& 8.8.2
AWS with sensors as per Technical Specification - Data Logger with min. 8 sensor connectivity as per Technical Specification No: 8.4, 8.6.2 & 8.8.2
Gate Sensors (2nos) with required accessories and mounting setup - Data Logger with min.4 sensor connectivity as per Technical Specification No: 8.5, 8.6.2 & 8.8.2
CCTV Camera with inbuilt IR illuminator with required accessories and mounting setup
Civil works for AWS , AWLR and Gate Sensors including mounting frame as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R ), AWS, Gate Sensor locations with GPRS/ GSM, L-Band Satellite Communication System (1 No.) - Thervoy Lake
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.2, 8.6.1& 8.8.2
AWS with sensors as per Technical Specification - Data Logger with min. 8 sensor connectivity as per Technical Specification No: 8.4, 8.6.2 & 8.8.2
CCTV Camera with inbuilt IR illuminator with required accessories and mounting setup
Civil works for AWS and AWLR including mounting frames as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R ), AWS location with GPRS/ GSM, L-Band Satellite Communication System (1 No.) - Cholavaram Lake
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.2, 8.6.2, 8.8.2
AWS with sensors as per Technical Specification - Data Logger with min. 8 sensor connectivity as per Technical Specification No: 8.4, 8.6.2 & 8.8.2
CCTV Camera with inbuilt IR illuminator with required accessories and mounting setup
Civil works for AWS and AWLR including mounting frames as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R ), GS location with GPRS/ GSM - Nandhambakkam Check dam
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.2, 8.6.1 & 8.8.1
Gate Sensors (14nos) with required accessories and mounting setup - Data Logger with min. 16 sensor connectivity as per Technical Specification No: 8.5, 8.6.1, 8.8.2
CCTV Camera with inbuilt IR illuminator with required accessories and mounting setup
Civil works for AWLR and Gate Sensors including mounting frames as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R ) location with GPRS/ GSM - Feeder Canal Regulator and KP-TK Canal Regulator (2 sites)
AWLR with RADAR based sensors (2 Nos) with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity (1 No) as per Technical Specification No: 8.3.2, 8.6.1& 8.8.1
AWLR with RADAR based sensor (1 No) with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity (1 No) as per Technical Specification No: 8.3.2, 8.6.1, 8.8.1
Civil works for AWLR including mounting frames as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R ), GS location with GPRS/ GSM, L-Band Satellite Communication System (3 Nos.) - Kesavaram Anicut and two downstream bridges (Three sites)
AWLR with RADAR based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.2, 8.6.2 & 8.8.1
Gate Sensors (16nos) with required accessories and mounting setup – One Data Logger with min. 18 sensor connectivity as per Technical Specification No: 8.5, 8.6.2 & 8.8.2
Civil works for AWLR including mounting frames as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR location with GPRS/ GSM - Araniar Anicut
AWLR with RADAR based sensors (2 Nos) with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity (1 No) as per Technical Specification No: 8.3.2, 8.6.1, 8.8.1
AWLR with RADAR based sensor (1 No) with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity (1 No) as per Technical Specification No: 8.3.2,8.6.1, 8.8.1
Civil works for AWLR including mounting frames as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (SE) AWS, GS location with GPRS/ GSM, L-Band Satellite Communication System in new Gauge Well (1 No.) - Korattur Anicut
AWLR with Shaft Encoder based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity – Right Bank as per Technical Specification No: 8.3.1, 8.6.2 & 8.8.1
AWS with sensors as per Technical Specification - Data Logger with min. 8 sensor connectivity – Right Bank as per Technical Specification No: 8.4, 8.6.2 & 8.8.2
Gate Sensors (4 Nos) with required accessories and mounting setup – One Data Logger with min. 4 sensor connectivity – Right Bank as per Technical Specification No: 8.5, 8.6.2 & 8.8.2
Gate Sensors (4 Nos) with required accessories and mounting setup – One Data Logger with min. 4 sensor connectivity - Left Bank as per Technical Specification No: 8.5, 8.6.2 & 8.8.2
Civil works for New full Gauge well and Frame structures for AWLR as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
AWLR (R) location with GPRS/ GSM , L-Band Satellite Communication System (1 No.) - Vallur Anicut
AWLR with Radar based sensor with required accessories and mounting setup - Data Logger with min. 2 sensor connectivity as per Technical Specification No: 8.3.2, 8.6.2 & 8.8.1
Civil works for New full Gauge well and Frame structures for AWLR as per the drawing Nos in Annexure – Drawings and Technical Specification No:7
Installation, Testing and commissioning
Plank Type (Gauge Plate) Water Level Recorders including levelling and fixing on existing permanent structures
ADCP, float, GPS, laptop inclusive of all accessories as per the Techncial specification No: 10.1
Electromagnetic Current Meters inclusive of all accessories as per the Techncial specification No: 10.2
II Control Room (HMCR, NDRC, FMC) Equipment A Hydro Modelling Control Room (HMCR) 1 Location - IT Components Servers
4 CPU Blade Server (for Hydro modelling) with required license operating on Microsoft windows including OS and Virtualization software cost as per the Technical Specification No:9.5.1
2 Processor Blade Server (for Database) operating on RedHat Linux including OS cost as per the Technical Specification No:9.5.2
2 Processor Blade Server (for hosting Web DSS Application, GIS Server, Email Server and SMS Server) with required license operating on Microsoft windows including OS and Virtualization software cost as per the Technical Specification No:9.5.2
Integrated Blade Chassis to house all the blade servers , storage and network as per the Technical Specification No:9.5.3
Software
Backup Software- Should support full VM back and granular restore as per the Technical Specification No:9.13
Enterprise Management System with license as per the Technical Specification No:9.8
PostgreSQL on RedHat Linux as per the Technical Specification No:9.15 (notional)
RTDAS Field Equipment System Software at Data Centre as per OEM supplier’s standards
Mike suite of software for Hydro Modelling. Perpetual and Network License with Dongle. (all inclusive for 5 years) for Mike Hydro Rainfall Runoff, Mike Flood, Mike Hydro River (DA), Mike 21, Mike +, Mike Operation (all in latest version)
Customization and integration with 3rd party systems and the existing system
Gateways
SMS package for the department users for the entire project duration
SMS package for the public (Required during Oct - Dec every year)
E-mail gateway
GIS system [GeoServe for Web DSS and 3 Q-GIS Desktop and 2 ArcGIS Pro (Latest Version) with Spatial Analyst] License
Routers
Datacentre Core Router Networked to all equipment using GPON as per Technical Specification No:9.1
Firewalls
Internet and DC Firewall (NGFW)as per the Technical Specification No:9.4
Web Application Firewall as per the Technical Specification No:9.3
Anti-Advance Persistent threat as per the Technical Specification No:9.2
EPABX + 20 digital phones as per the Technical Specification No: Section – 9.11
L-Band Satellite Communication System (Antenna, Support structure, modem/ router) as per the Technical Specification No: Section – 9.19
SSL Certificates - Wildcard license with unlimited sub domain support
Installation, Testing & Commissioning of Hydro Modelling Control Room (HMCR) – IT Components
Connectivity
Internet Leased line connectivity for Hydro Modelling Control Room with 100 Mbps 1:1 bandwidth (1+1) – Installation
Internet Leased line connectivity for Hydro Modelling Control Room to Disaster Recovery on Cloud and Hydro Modelling Control Room to Nearline DR & FMC with 100Mbps 1:1 bandwidth (1+1) - Installation
Satellite Pool Bandwidth charges annual recurring for back haul communication between service provider HUB and Hydro Modelling Control Room @128 Kbps – Installation
Any other items not specified above, but required for the completeness of the objective of the HMCR. (Specify)
Hydro Modelling Control Room – 1 Location- Non- IT Components
Video Wall Solution - 70" in a 3x2 arrangement with Videowall Management solution as per the Technical Specification No:9.17
70" LED Display Panels as per the Technical Specification No:9.18
Computers
Workstations for Hydro Modelling as per the Technical Specification No:9.9.1
Desktops – Control Room as per the Technical Specification No:9.9.2
Desktops – Admin as per the Technical Specification No:9.9.3
Printers
Network Colour Laser Printers (A3 Size) as per the Technical Specification No:9.10.1
Network Multifunction Printer (A4) as per the Technical Specification No:9.10.2
SAT Phone as per the Technical Specification No:9.12
Civil works including Site Preparation, Fire Rated False partition, Civil Partition, Floor tile, False ceiling, False Flooring, Floor Strengthening, Doors and Painting works, plumbing, etc complete as per the drawing Nos in Annexure – Drawings and Technical Specification No: - 6, 9,11
Electrical Cabling, Panels, DB, Earthing, & Necessary Illumination Devices and fixtures as per Technical Specification No: 11
IP Based CCTV Surveillance System as per Technical Specification No:11.16
Fire Alarm system as per Technical Specification No:11.12
Fire Suppression System - Gas based for Sever, Electrical, UPS & Battery room as per Technical Specification No:11.10
Fire Suppression System- Sprinkler based for all the other area as per Technical Specification No:11.10
Aspirating Smoke Detection System as per Technical Specification No:11.13
Public Address System as per Technical Specification No:11.17
Water Leak Detection System as per Technical Specification No:11.9
Rodent Repellent System as per Technical Specification No:11.15
Access Control System - Biometric and Card reader with required number of Access Cards as per Technical Specification No:11.14
Comfort AC for all the other rooms as per Technical Specification No:11.11
Precision AC for server room as per Technical Specification No:11.11
Integrated Building Management System software
UPS of adequate capacity, 30 kVA minimum, with 30 Min Power Backup for IT components as per Technical Specification No:9.16
UPS of adequate capacity, 30 kVA minimum, with 30 Min power backup for Non-IT components as per Technical Specification No:9.16
Diesel Genset of adequate capacity. Minimum 250 kVA, with Automatic Transfer, shelter and exhaust setup as per Technical Specifications No. 11.18
Networking Cost (Passive Components including CAT6 cables, OFC, CAT6 & Fiber Patch Cords, LIU, Rj45 Jack Panels etc.)
Furniture
Command Centre Desks (4 seater) as per Technical Specification No:11.2
Sys Admin Desks (4 seater) as per Technical Specification No:11.2
Server Storage Desk as per Technical Specification No:11.2
Modelling Workstation Desks as per Technical Specification No:11.2
Office Desks, Storage Units as per Technical Specification No:11.2
Conference Table (16 -seater arrangement) as per Technical Specification No:11.2
Ergonomic Chairs – Work as per Technical Specification No:11.2
Ergonomic Chairs – Waiting as per Technical Specification No:11.2
Installation, Testing & Commissioning of Hydro Modelling Control Room – Non IT Components
Any other items not specified above, but required for the completeness of the objective of the HMCR. (Specify)
Disaster Recovery (DR) on Cloud
Infrastructure as a service (Virtual Machines) cost for all the applications and database ( Hydro modelling, web DSS, Mobile app sever , GIS server , PostgreSQL) for five years
Cloud storage Primary Storage (Unified) with usable space 50 TB for all the applications and sensor data extendable to 200 TB. 2 TB of standard storage + rest archive storage for five years as per the Technical Specifications – Section 9c
PostgreSQL on RedHat Linux
RTDAS Field Equipment System Software
Customization and integration with 3rd party systems and the existing system
Mobile App (Crowd Sourcing) Server
GIS system [GeoServe for Web DSS and 3 Q-GIS Desktop ] License
SSL Certificates- Wildcard license with unlimited sub domain support
Installation, Testing & Commissioning Disaster Recovery (DR) on Cloud
Internet Leased line connectivity for Disaster Recovery on Cloud to Hydro Modelling Control Room and Disaster Recovery on Cloud to Nearline Disaster Recovery & FMC with 100 Mbps 1:1 bandwidth – Installation
Any other items not specified above, but required for the completeness of the objective of the DR on cloud. (Specify)
D. Nearline DR Centre & FMC at WRD HQ - 1 No (IT - Component) Servers
2 Processor Blade Server (for Database) operating on RedHat Linux including OS and Virtualization software cost as per the Technical Specification No:9.5.2
2 Processor Blade Server (for hosting Web DSS Application, GIS Server, Email Server and SMS Server) with required license operating on Microsoft windows including OS cost as per the Technical Specification No:9.5.2
Integrated Blade Chassis to house all the blade servers , storage and network as per the Technical Specification No:9.5.3
Software
Backup Software- Should support full VM back and granular restore as per the Technical Specification No:9.13
Enterprise Management System with license as per the Technical Specification No:9.8
PostgreSQL on RedHat Linux as per the Technical Specification No:9.15
RTDAS Field Equipment System Software
Mike suite of software for Hydro Modelling. Network License with Dongle. (all-inclusive for 5 years at 3 months per year) for Mike Hydro Rainfall Runoff, Mike Flood, Mike Hydro River (DA), Mike 21, Mike +, Mike Operation. (All in latest version).
Customization and integration with 3rd party systems and the existing system
GIS system [GeoServe for Web DSS and 3 Q-GIS Desktop and 2 Arc GIS Pro with Spatial Analyst] License
Routers
Datacentre Internet Router as per the Technical Specification No: 9.1
Firewalls
Internet and DC Firewall (NGFW)as per the Technical Specification No:9.4
Web Application Firewall as per the Technical Specification No:9.3
Anti-Advance Persistent threat as per the Technical Specification No:9.2
EPABX + 20 digital phones as per the Technical Specification No: 9.11
L-Band Satellite Communication System (Antenna, Support structure, modem/ router) as per the Technical Specification No: 9.19
SSL Certificates- Wildcard license with unlimited sub domain support
Installation, Testing & Commissioning
Connectivity
Internet Leased line connectivity for NDRC with 100 Mbps 1:1 bandwidth (1+1) – Installation
Internet Leased line connectivity for NDRC to Disaster Recovery on Cloud and NDRC to HMCR with 100 Mbps 1:1 bandwidth (1+1) – Installation
Satellite Pool Bandwidth charges annual recurring for backhaul communication between service provider HUB and NDRC @ 128 Kbps – Installation
Any other items not specified above, but required for the completeness of the objective of the NDRC. (Specify)
Nearline DR Centre & FMC at WRD HQ - 1 No (Non-IT)
Video Wall Solution - 70" in a 3 X 2 arrangement with Videowall Management solution as per Technical Specification No:9.17
70" LED Displays as per the Technical Specification No:9.18
Computers
Workstations for Hydro Modelling as per Technical Specification No:9.9.1
Desktops – Control Room as per Technical Specification No:9.9.2
Desktops – Admin as per Technical Specification No:9.9.3
Printers
Network Colour Laser Printers (A3 Size) as per Technical Specification No:9.10.1
Network Multifunction Printer (A4) as per Technical Specification No:9.10.2
SAT Phone as per Technical Specification No:9.12
Civil works including Site Preparation, Fire Rated False partition, Civil Partition, Floor tile, False ceiling, False Flooring, Floor Strengthening, Doors and Painting works, plumbing, etc complete as per the drawing Nos in Annexure – Drawings and Technical Specification No:6, 9,11
Electrical Cabling, Panels, DB, Earthing, & Necessary Illumination Devices and fixtures as per Technical Specification No:11
IP Based CCTV Surveillance System as per Technical Specification No:11.16
Fire Alarm System as per Technical Specification No:11.12
Fire Suppression System - Gas based for Sever, Electrical, UPS & Battery room as per Technical Specification No:11.10
Fire Suppression System- Sprinkler based for all the other area as per Technical Specification No:11.10
Aspirating Smoke Detection System as per Technical Specification No:11.13
Public Address System as per the Technical Specification No: 11.17
Water Leak Detection System as per Technical Specification No:11.9
Rodent Repellent System as per Technical Specification No:11.15
Access Control System - Biometric and Card reader with required number of Access Cards as per Technical Specification No:11.14
Comfort AC for all the other rooms as per Technical Specification No:11.11
Precision AC for server room as per Technical Specification No:11.11
Integrated Building Management System software
UPS of adequate capacity, minimum 20kVA with 30 Min Power Backup for IT components as per Technical Specification No:9.16
UPS of adequate capacity, minimum 20kVA with 30 Min power backup for Non-IT components as per Technical Specification No:9.16
Diesel Genset of adequate capacity, minimum 125 KVA, with AMF panels, shelter and exhaust setup as per Technical Specifications No. 11.18
Networking Cost (Passive Components including CAT6 cables, OFC, CAT6 & Fiber Patch Cords, LIU, Rj45 Jack Panels etc.)
Furniture
Command Centre Workstation Desks as per Technical Specification No:11.2
Office / Modelling Desks as per Technical Specification No:11.2
Conference Table (10 -seater arrangement) as per Technical Specification No:11.2
Ergonomic Chairs as per Technical Specification No:11.2
Installation, Testing & Commissioning
Any other items not specified above, but required for the completeness of the objective of the NDRC. (Specify)
Flood Monitoring Centres (FMC) (4 nos) in Tiruvallur, Kancheepuram, Chengalpattu, Ranipet (IT & Non IT)
Router as per Technical Specification No:9.1
Video Wall Solution - 70" in a 2 x 2 arrangement with Videowall Management solution as per Technical Specification No:9.17
Computers
Desktop- Control Room as per Technical Specification No:9.9.2
Desktop- Admin computers as per Technical Specification No:9.9.3
Phones
IP Phone as per Technical Specification No: 9.11
SAT phone as per Technical Specification No:9.12
Printers
Network Colour Laser Printers (A3 Size) as per Technical Specification No:9.10.1
Network Multifunction printer (A4 Size) as per Technical Specification No:9.10.2
Passive Cabling including CAT6 cables, Patch Panels, patch cords etc. as per Technical Specification No:11.8
UPS with adequate capacity, minimum 15 kVA with 30 minutes battery backup and isolation transformer as per Technical Specification No:9.16
Civil works including Site Preparation, Fire Rated False partition, Civil Partition, Floor tile, False ceiling, False Flooring, Floor Strengthening, Doors and Painting works, plumbing, etc complete as per the drawing Nos in Annexure – Drawings and Technical Specification No:6, 9,11
Electrical Panel, DB, Cable trays, earthing, light fixtures, cabling including industrial sockets and related accessories for racks and workstation as per Technical Specification No:11
Comfort AC for Control Room as per Technical Specification No:11.11
Diesel Genset of adequate capacity, minimum 50 kVA, including required foundation and exhaust system
IP Based CCTV Surveillance System as per Technical Specification No:11.16
Fire Alarm system as per Technical Specification No:11.12
Portable Fire Suppression System as per Technical Specification No:11.10
Access Control System – Card based as per Technical Specification No:11.14
Furniture
Command Centre Workstation Desks (3 seater) as per Technical Specification No:11.2
Office Desks as per Technical Specification No:11.2
Conference Table (10 -seater arrangement) as per Technical Specification No:11.2
Ergonomic Chairs – Work as per Technical Specification No:11.2
Ergonomic Chairs – Waiting as per Technical Specification No:11.2
Installation, Testing & Commissioning
Internet Leased line connectivity for Flood Monitoring Centres (FMC) with 100 Mbps 1:1 bandwidth (1+1) – Installation
Any other items not specified above, but required for the completeness of the objective of the FMC. (Specify)
Other Cost
Training/Capacity building to Nodal Department’s officers in day to day operation of the Hydro Modelling Control Room, Nearline Disaster Recovery Centre and Flood Monitoring Centres for Flood Forecasting and Disaster Management tasks.
Environmental Management Measures as required
Description of Work / Item(s)
Amount
Field Equipment
Field Equipment - Operation and Maintenance cost like field visits, cleaning, calibration etc.
Control Rooms – Facility & Equipment (electrical power and water supply by User Agencies)
Hydro Modelling Control Room (HMCR)
Disaster Recovery on Cloud
Near line Disaster Recovery Centre (NDRC) & FMC
Flood Monitoring Centre (FMC)
Relocation of inventory from FMC at Chengalpattu to the new Collectorate Building
Relocation of inventory from FMC at Ranipet to the new Collectorate Building
Control Rooms- Manpower cost (Flood Forecasting and Disaster Management operation in Control Rooms by User Agency staff)
Manpower cost- Hydro Modelling Control Room. January to September
Manpower cost- Hydro Modelling Control Room. October to December
Manpower cost- Near line Disaster Recovery Centre & FMC. January to September
Manpower cost- Near line Disaster Recovery Centre & FMC. October to December
Manpower cost- Flood Monitoring Centres (FMC). January to September
Manpower cost- Flood Monitoring Centres (FMC). October to December
Telecommunication cost Field Equipment
L-Band Satellite Pool Band width charges annual recurring for communication between Remote Terminal stations and Service provider HUB @ 128 kbps
GSM / GPRS Dual SIM charges annual recurring for communication Remote Terminal stations and Hydro Modelling Control Room / Cloud / Near line Disaster Recovery Centre &FMC @ 128 kbps
Hydro Modelling Control Room (HMCR)
Satellite Pool Bandwidth charges annual recurring for backhaul communication between Service provider HUB and Hydro Modelling Control Room / Cloud / Near line Disaster Recovery Centre & FMC @ 128 Kbps
Internet Leased line connectivity for Hydro Modelling Control Room with 100 Mbps 1:1 bandwidth (1+1)
Internet Leased line connectivity for Hydro Modelling Control Room to Disaster Recovery on Cloud with 100 Mbps 1:1 bandwidth (1+1)
Internet Leased line connectivity for Hydro Modelling Control Room to Near line Disaster Recovery Centre& FMC with 100 Mbps 1:1 bandwidth (1+1)
Near line Disaster Recovery Centre (NDRC) & FMC
Internet Leased line connectivityfor Near line Disaster Recovery Centre & FMC with 100 Mbps 1:1 bandwidth (1+1)
Internet Leased line connectivity for Near line Disaster Recovery Centre & FMC to Disaster Recovery on Cloud with 100 Mbps 1:1 bandwidth (1+1)
Flood Monitoring Centres (FMC) (4 Nos)
Internet Leased line connectivity for Flood Monitoring Centres (FMC) with 100 Mbps 1:1 bandwidth (1+1)
Cost of providing feed to ICCC, GrCC
Description of Work / Item(s)
Amount
PRICE Schedule for Supply as per Schedule of Requirements – Capital Cost (Price Schedule Table-4A)
PRICE and Completion Schedule - Related Services- Operation & Maintenance Cost during Warranty Period of Five Years (Price Schedule Table-4B)
YOKOGAWA INDIA LIMITED
Orange Business Services India Pvt Ltd
YOKOGAWA INDIA LIMITED
Orange Business Services India Pvt Ltd
YOKOGAWA INDIA LIMITED
Orange Business Services India Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid