| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC Out of Two tenders recvied, The lowest Rate Quoted by Thiru.D. Rajagobal, Contractor, Valathamangalam at 0.08per Less Estimate may be approved. |
| 2 | L2₹10.1 LRejected-Finance | ₹10.1 L | L2 | Rejected-Finance The above rate quoted |
| Sl No | Description | Qty | Unit | D. RAJAGOPAL L1 | S.NATESAN L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Thirukovilpathu Vadakku kudiyana theru road (Km 0/0-0/375) in Arunthavapuram Panchayat | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | Km 0/0-0/375 | 450 | Sq.m | 6.16 ₹2,772 | 7.36 ₹3,312 |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 5.00 | Km 0/0-0/375 | 101.25 | Cu.m | 140.25 ₹14,200.31 | 141.45 ₹14,321.81 |
| 6.00Picking the existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete. | |||||
| 7.00 | Km 0/0-0/375 | 375 | Sq.m | 23.16 ₹8,685 | 24.36 ₹9,135 |
| 10.00Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER | |||||
| 11.00 | Km 0/0-0/375 | 84.38 | Cu.m | 3,926.67 ₹3.3 L | 3,927.87 ₹3.3 L |
| 12.00Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges | |||||
Tender Value
₹10.2 L
EMD Value
₹10,200
Closing Date
4 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT)
Panchayat Union office , Ammapettai
Strengthening of Thirukovilpathu Vadakku kudiyana theru road (Km 0/0-0/375) in Arunthavapuram Panchayat at Ammapettai Block
2026_RDTN_666596_17
3410/2025/A2 Date.23.02.2026
Open Tender
Civil Works - Roads
Panchayat Union office, Ammapettai.
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹10,200
15 May 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
Strengthening of Thirukovilpathu Vadakku kudiyana theru road (Km 0/0-0/375) in Arunthavapuram Panchayat
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., complete
Provision for HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
TechnicalBit.pdf
Tender Documents • 0.91 MB
PriceBit.pdf
Tender Documents • 0.80 MB
BOQ_801291.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid