Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | -35.00% | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.9 L+₹106 (0.02%)Admitted-Finance | -34.99% | ₹6.9 L+₹106 (0.02%) | L2 | Admitted-Finance |
| 3 | L3₹7.1 L+₹25,440.26 (3.69%)Admitted-Finance | -32.60% | ₹7.1 L+₹25,440.26 (3.69%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹31,800.32 (4.62%)Admitted-Finance | -32.00% | ₹7.2 L+₹31,800.32 (4.62%) | L4 | Admitted-Finance |
| 5 | L5₹7.9 L+₹97,415 (14.1%)Admitted-Finance | -25.81% | ₹7.9 L+₹97,415 (14.1%) | L5 | Admitted-Finance |
Tender Value
₹10.6 L
EMD Value
₹21,200
Closing Date
17 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_317606_22
e-NIT No. 78 REW UDHAMPUR of 2026-27 Dated 23-07-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹21,200
31 Aug 2026
25 Jul 2026
18 Aug 2026
25 Jul 2026
17 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing ofsides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 80% ord. soil and 20% hard rock. | 20.65 | cum | 479.3 | ₹9,897.55 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.16 | cum | 4,826.5 | ₹24,904.74 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.52 | cum | 5,733.6 | ₹1,06,186.27 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) (Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level) | 10.44 | cum | 9,027.2 | ₹94,243.97 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.36 | cum | 9,821.85 | ₹72,288.82 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.85 | cum | 9,395.7 | ₹1,01,943.35 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 1,727.78 | kg | 123.2 | ₹2,12,862.5 |
| 8 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) | 42.45 | sqm | 241.25 | ₹10,241.06 |
| 9 | 15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 64.57 | sqm | 306.85 | ₹19,813.3 |
| 10 | 12 mm Cement plaster of mix: 1 : 6 ( 1 cement : 4 fine sand) | 90.22 | sqm | 266.2 | ₹24,016.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1041634.xls
BOQ • 0.28 MB
exttt.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .