| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC | ₹4.7 Cr | L1 | Accepted-AOC Being lowest and reasonable |
| 2 | L2₹5.0 Cr+₹27.2 L (5.78%)Rejected-Finance 501 503 PLOT NO 2 BEST BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | ₹5.0 Cr+₹27.2 L (5.78%) | L2 | Rejected-Finance Not being lowest |
| 3 | L3₹5.4 Cr+₹71.5 L (15.2%)Rejected-Finance | ₹5.4 Cr+₹71.5 L (15.2%) | L3 | Rejected-Finance Not being lowest |
| 4 | L4₹5.9 Cr+₹1.2 Cr (24.7%)Rejected-Finance B 6 8 FIRST FLOOR LSC SAFDARJUNG ENCLAVE SOUTH WEST DELHI DELHI 110029 | SOUTH DELHI | DELHI | 110029 | ₹5.9 Cr+₹1.2 Cr (24.7%) | L4 | Rejected-Finance Not being lowest |
| 5 | L5₹9.0 Cr+₹4.3 Cr (91.1%)Rejected-Finance | ₹9.0 Cr+₹4.3 Cr (91.1%) | L5 | Rejected-Finance Not being lowest |
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
4 Apr 2022, 6:00 pmClosed
Chief Engineer
HQ Chief Engineer Delhi Zone, Delhi Cantt-10
PROVISION OF NEW MEDICAL GAS PIPELINE SYSTEM AT ARMY HOSPITAL (RR) UNDER GE (E/M) RR HOSPITAL, DELHI CANTT-10
2021_MES_487691_3
CA NO CEDZ- 33 of 2021-22
Open Tender
Civil Works
Item Rate
270 days
Delhi Cantt
MES contractor enlisted in MES under class A any cat having deposited Standing Security of Rs 7.00 lakh with department. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category
9 documents required · 9 mandatory
₹3,000
GE (E/M) RR Hospital
₹6.3 L
Yes
4 May 2022
7 Mar 2022
6 Apr 2022
7 Mar 2022
4 Apr 2022
21 Mar 2022
Amount
Supply, Installation, Testing & Commissioning (SITC) of BSI Kite Mark Certified Copper Pipes : It should be confirm and meets with BS:EN:13348:2016 copper pipes: All medical grade degreased copper pipes. Medical Grade Copper pipes manufactured from Phosphorous de-oxidized non-arsenical copper to BS:EN: 1412:1996 grade CW 024A ( Cu-DHP) manufactured to metric outside diameters and having mechanical properties in accordance with BS:EN: 13348:2016, Degreasing of pipe shall be such that there is less than 20 mg / m2 (0.002 mg / cm2) of hydrocarbons on the degreased surface when tested by the method specified BS: EN: 13348:2016 complete all as specified and directed.
(a) SITC of BSI Kite Mark Certified Copper Pipes of 108mm OD x 1.5mm thk:
(b) SITC of BSI Kite Mark Certified Copper Pipes of 76mm OD x 1.5mm thk:
(c) SITC of BSI Kite Mark Certified Copper Pipes of 54mm OD x 1.5mm thk:
(d) SITC of BSI Kite Mark Certified Copper Pipes of 42mm OD x 1.2mm thk:
(e) SITC of BSI Kite Mark Certified Copper Pipes of 28mm OD x 1 mm thk:
(f) SITC of BSI Kite Mark Certified Copper Pipes of 22mm OD x1 mm thk:
(g) SITC of BSI Kite Mark Certified Copper Pipes of 15mm OD x 1 mm thk :
SITC of Line Ball Valves: It should fully complies and meets with the requirements of the HTM 02-01 / NFPA -99 Recomendations and standards mentioned under these recomendation or applicable. It shall be provided with a copy of the certificate of origin. It should comprise full-bore ball valve complete with copper stub pipes for ease of installation. Valve - connected to the copper stub pipes. Valve - Brass body, end cap and stem, with a full – bore chrome plated brass ball. Valve - Operate from fully closed to fully open with a quarter turn of the handle. It should be duly CE markd with 4 digit notified body number or UL /ETL listed whereever applicable. All line valves - Supplied with a mechanism to enable the unit to be locked in the fully closed or fully open position complete all as specified and directed
(a) SITC of Line Ball Valves of 108mm or euivalent to 4 inch approx size with pipe stub on both sides
(b) SITC of Line Ball Valves of 76 mm or euivalent to 3 inch approx size with pipe stub on both sides
(c) SITC of Line Ball Valves of 54 mm or euivalent to 2 inch approx size with pipe stub on both sides
(d) SITC of Line Ball Valves of 42 mm or euivalent to 1-1/2 approx inch size with pipe stub on both sides
(e) SITC of Line Ball Valves of 28 mm or euivalent to 1 inch approx size with pipe stub on both sides
(f) SITC of Line Ball Valves of 22 mm or euivalent to 3/4 inch approx size with pipe stub on both sides
(g) SITC of Line Ball Valves of 15 mm or euivalent to 1/2 inch approx size with pipe stub on both sides
SITC of Area Valve Service Units for 6 Service : It should fully complies and meets with the requirements of the HTM 02-01 or NFPA 99 Recomendations and standards mentioned under these recomendations or applicable. The valve should be complete with copper stub pipes that extend to the outside of the box to enable easy connections to the Medical Gas Pipeline System (MGPS). The valve should operate from fully closed to fully open with a quarter turn of the handle. The valves shall be connected to the copper stub pipes by means of flat faced unions fitted, allowing removal of the valve without the need to distort the pipe work. The valve should have a brass body, end cap and stem, with a full –bore chrome plated brass ball. The valve shall operate from fully closed to fully open with a quarter turn of the handle. The door should incorporate a ‘Break Glass’ window or an optional quick release mechanism for emergency access to the valve. Should have optional quick release emergency access system complete all as specified and directed It should be duly CE markd with 4 digit notified body number or UL /ETL listed whereever applicable
(a) 6 services (oxygen, N2O, Med Air, Sug. Air, Vacuum, AGSS) with valve box with inbuilt ball valves
(b) 4 services (oxygen, N2O, Med Air, Vacuum,) with valve box with inbuilt ball valves
(c) 3 services (oxygen, Med Air, Vacuum,) with valve box with inbuilt ball valves
SITC of Area Alarm : It should fully complies and meets with the requirements of the HTM 02-01 standards or NFPA-99 Standards recomendations and standards mentioned under these recomendations or applicable. . It shall be provided with a copy of the certificate of origin. Each gas service shall be on the LED/LCD high resolution touchscreen display to show ‘the actual pressure readings in digital form only. Failure indicators should be gas specific coloured displayed by lights and normal indications shall be steady. In the event of any fault the line continuity monitoring circuits shall initiate the specific gas service failure indication, a ‘System Alarm’ indication and an audible warning. Pressure and Vacuum Transducers : . Electrical connectors shall be designed for frequent disassembly. Pressure transducers shall connect directly to the area alarm panel. Condition Alarm Panel Display:NORMAL ‘NORMAL’ indicator (steady) Alarm Condition Alarm condition either: ‘HIGH PRESSURE’ indicator, ‘LOW PRESSURE’ indicator. All accompanied by audible alarmLine Continuity Fault ‘NORMAL’ indicator (steady), Respective alarm indicator, ‘SYSTEM ALARM’. Audible alarm. Note: Press ‘TEST’ switch.Power Failure Power failure to panel SYSTEM . ALARM. Audible, ‘POWER ON’ indicator. Alarm should have Ethernet connectivity using BACnet over IP protocol to building management system - standard Alarm should have Event history log accessible at the screen.Alarm signal status should also be viewed on a standard computer connected to the facility’s local network via Ethernet. The alarm systems should be either ETL listed or UL or four digit CE by notified body.Area alarm automatically sets NFPA 99 +/-20% limits based on current pressure. Transducers are gas-specific, and cross- connecting a transducer with an assigned gas input complete all as specified and directed
(a) 6 services (oxygen, N2O, Med Air, Sug. Air, Vacuum, AGSS)
(b) 4 services (oxygen, N2O, Med Air, Vacuum,)
(c) 3 services (oxygen, Med Air, Vacuum,)
(d) 2 services (oxygen, Vacuum )
SITC of Manifold Header, tail pipes for Oxygen: (Cylinder Manifold Unit of size 10+10 size) : It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable. It shall be provided with a copy of the certificate of origin.It should be duly CE markd with 4 digit notified body number or UL /ETL listed whereever applicable. 10 cylinder manifold bank as left side and 10cylinder manifold bank as right side complete with 20 nos.pig tail pipes and 20nos. non- return valves, all header racks and cylinder tailpipes should be 230 bar rated, with high pressure copper link pipes. Cylinder racks should be designed to securely support cylinders of varying diameters complete all as specified and directed
SITC of Fully Automatic control panel for oxygen gas cylinder manifold with Digital Pressure display High Resolution Touch Screen Fully Automatic Changeover Control Panel should have minimum 1700 lpm flowrate at 55 to 60 psi pressure : It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable.. It shall be provided with a copy of the certificate of origin. It should be duly CE markd with 4 digit notified body number or or UL /ETL listed whereever applicable complete all as specified and directed
SITC of Fully Automatic control panel for liquid oxygen system with Digital Pressure display High Resolution Touch Screen Fully Automatic Changeover Control Panel.It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable.. It shall be provided with a copy of the certificate of origin. It should be duly CE markd with 4 digit notified body number or or UL /ETL listed whereever applicable complete all as specified and directed.
SITC of Manifold Header, tail pipes for N2O: (Cylinder Manifold Unit of size 10+10 size) : It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable. It shall be provided with a copy of the certificate of origin.It should be duly CE markd with 4 digit notified body number or UL /ETL listed whereever applicable. 10 cylinder manifold bank as left side and 10cylinder manifold bank as right side complete with 20 nos.pig tail pipes and 20nos. non- return valves, all header racks and cylinder tailpipes should be 230 bar rated, with high pressure copper link pipes. Cylinder racks should be designed to securely support cylinders of varying diameters. complete all as specified and directed
SITC of Fully Automatic control panel for oxygen gas cylinder manifold with Digital Pressure display High Resolution Touch Screen Fully Automatic Changeover Control Panel should have minimum 500 lpm flowrate at 55 to 60 psi pressure : It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable.. It shall be provided with a copy of the certificate of origin. It should be duly CE markd with 4 digit notified body number or or UL /ETL listed whereever applicable complete all as specified and directed
SITC of Vacuum Plant with oil flooded rotary vane vaccum pumps with 14000 lpm flowrate at 450 mm Hg pressure along with stand by as per the recomendations of HTM-02-01 or NFPA 99. It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable.. It shall be provided with a copy of the certificate of origin. It should be duly CE markd with 4 digit notified body number or or UL /ETL/EMC listed whereever applicable complete all as specified and directed
SITC of Medical Air Plant with recomended air compressors oil-less scroll or screw air compressors with 7000 lpm flowrate at 55 to 60 psi pressure along with stand by as per the recomendations of HTM-02-01 or NFPA 99. It should fully complies and meets with the requirements of the HTM 02-01 or NFPA-99 recomendations and standards mentioned under these recomendations or applicable.. It shall be provided with a copy of the certificate of origin. It should be duly CE markd with 4 digit notified body number or or UL /ETL/EMC listed whereever applicable complete all as specified and directed
SITC of AGSS Plant with oil less blowers with 4000 lpm flowrate along with stand by as per the recomendations of HTM-02-01 or NFPA 99 . It should fully complies and meets with the requirements of the HTM 02-01 OR NFPA 99 recomendations and standards mentioned under these recomendations or applicable complete all as specified and directed It should be duly CE markd with 4 digit notified body number or UL /ETL listed whereever applicable
SITC of AGSS indicators to be supplied by the bidder only in case bidder is offering system as per HTM-02-01 recommendations if bidder is offering NFPA 99 system where in this indicator is not applcable then bidder can quote price as zero complete all as specified and directed It should be duly CE markd with 4 digit notified body number or UL /ETL listed whereever applicable
SITC of Medical Gas Terminal Units (Gas Outlet Points) Oxygen/N2O/MA4 Air/Vacuum : It should fully complies and meets with the requirements of the HTM 02-01 standards or NFPA-99 Standards recomendations and standards mentioned under these recomendations or applicable.. It shall be provided with a copy of the certificate of origin. It should be duly CE markd with 4 digit notified body number or UL /ETL/EMC wherever applicable complete all as specified and directed
SITC of Electrical Wiring inside the gas manifold and plant room Hospital will supply 3 phase cable with distribution board and at one point inside the plant room. Electric cable with fixtures and fittings for manifold room will be done by the hospital. All switch-gear and motor control centre e.g. switches statement etc. volt and ampere meters. All switch gear motor etc. shall be of the same make for interchangeability. All electrical equipment shall be earthed in an approved manner as per I.E.E. rules and acceptable to the local authority. Earthing station shall be provided by the contractor. Two main supply of the required KW shall be provided up to the electrical control panel. The wiring after the control panel has to be provided by the supplier as per IEE regulations. Following material must be inside the plant room. 1.Cables , 2.G.I Earth Wire, 3.Saddling, 3a.Thumbling,4.Gland, 5.Control Cable. complete all as specified and directed
Description of Work / Item(s)
Amount
Excavation in trenches in soft and loose soil n.exc 1.5 mtr wide and n.exc. 1.5 mtr depth and getting out complete all as specified and directed
M&L for returing filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed
M&L for removal of excavated material n exc. 50m and depostiting where directed at a level n exc. 1.5m above the starting point complete all as specified and directed
M & L for sand as in sand cushioning with layer of sand 8cm thick before laying the cable and 15cm after laying of cable in trenches adn sand cover to under gound cable complete all as specified and directed
Supply and laying reinforced precast concrete cable covers class IV Type -1 of size 250 x 150 x 40 mm for protection to underground cable compete all as specified and directed
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100volts grade with stranded aluminium conductor of size 300 Sqmm 3.5 core complete all as specified and directed
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100volts grade with stranded aluminium conductor of size 16 Sqmm 4 core complete all as specified and directed
Description of Work / Item(s)
Amount
Provisional sum for Construction of Plant room bldg (manifold bldg) for medical gas with permanent specification of RCC framed construction single storey in M-30 desing mix earth quake resistant rolling shutter steel windows with gril guard bars, external weather coat, plinth protection of PCC 1:3:6 including internal water supply services (having approx plinth area approx 273 Sqm) and the height of the bldg shall be of ceiling height 4.50m from floor level to celing of RCC slab and plinth height shall be 45cm above the top level of existing road level complete all as specified and directed by Engineer -in-Charge Note :- (i) Provisional items shall be measured and paid as per Condition 6 of IAFW-2249. (ii) Regarding specification of Bldg, Please refer Sch 'A' Note No 36.
Description of Work / Item(s)
Amount
M & L for Point wiring complete with 1.5 sqmm single core PVC insulated FRLS cable 1100 volts grade with multi stranded copper conductor drawn through new PVC conduit 20 mm dia medium grade ISI marked and all conduit accessories concealed in walls/ceiling/fixed to roof/truss/columns etc and including provision of 1.5 sqmm PVC insulated copper cable FRLS as earth continuty, fabricated branded modular metal flush box duly make embossed, concealed in walls with suitable modular inner and outer plate for housing switches , socket out let and fan regulators etc, complete all as specified and as directed for one light /Ceiling fan/exhaust fan point, bell buzzer controlled by one, one way switch/bell puch . (Note :- The cost of any type metal boxes and any accessories like cover plates etc shall be included in the quoted rates)
All as per Srl Item No 1 here-in-before but one 5 Amps socket outlet point on same board
All as per Srl Item No 1 here-in-before but one 5 Amps socket outlet point on independent board
All as per Srl Item No 1 here-in-before but with 2.5 sqmm FRLS copper wire with 1.5sqmm FRLS copper eath with for 15 Amp power point
S&F switch piano flush type 5/6 amps single pole one way complete all as specified and directed.
S&F switch piano flush type 6 amps single pole 230 volts, two way AC complete all as specified and directed.
S&F switch piano flush type 16 amps single pole 230 volts, one way AC complete all as specified and directed.
S&F socket outlet 2 in 1, 3 pin, 6 / 16 Amps flush type combined 230 volts ACcomplete all as specified and directed.
S&F electronic fan regulator step type socket size and making all necessary connections complete all as specified and directed.
S & F ceiling rose insulated body, 3 terminals 240 volts 5amps with and making good surface as orginal by plastering and white wash/colour/ distemper etc complete all as specified and directed
S&F LED tube lights fitting 20W (CW), 4 feet long in extruded aluminium batten with high efficient LEDs available in milky diffuser and colour rendering Index (CRI>70), IP20, correlated colour temparature (CCT-5700K to 6500K), PF>0.9 and voltage rated 220V to 240V complete all as specified and directed.
S&F LED tube lights fitting 10W (CW), 2 feet long in extruded aluminium batten with high efficient LEDs available in milky diffuser and colour rendering Index (CRI>70), IP20, correlated colour temparature (CCT-5700K to 6500K), PF>0.9 and voltage rated 220V to 240V complete all as specified and directed.
S&F LED lights fitting 1x9W/1x10W bulkhead luminaries including LED light driver holder connecting up wiht three core flexible copper conductor cable of suitable size complete all as specified and directed.
S&F ceiling fan with three blade down rod accessories 230V 1200mm sweep wiht squirrel cage induction motor complete all as specified and directed.
S&F distribution board double door made out of CRCA mild steel sheet surface with insulated material like polyster or with epoxy powder coating and IP 43 & IK 09 protection surface mouting TPN 04 way, 415 volts with bus bar rating 200 amps dust and vermin poof sutiable for incorporation of MCBs and isolators etc and making necessary connections complete all as specified and directed.
S&F single pole MCB 6 to 32 Amps, 10KA, ‘B’ curve type, with overload and short circuit protection complete all as specified and directed.
All as per Srl item No 16 here-in-before but 40 to 63 amps capacity and SPN type
S&F MCB TPN 63 Amps, 10KA with overload and short circuit protection complete all as specified and directed.
S & F exhaust fan AC single phases 220-240V of size 380mm sweep PVC body heavy duty including self closing louver and fixing accessories complete all as specified and directed (Note :- PCC work, making round hole in wall suitable for 300mm size exhaust fan shall be deemed to be included in the quoted rates)
M&L Earthing complete with galvanised steel earth plate electrode 600×600× 6mm thick, buried directly in ground (earth pit not lessthan 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised earth lead wire 4.0 mm dia by means of bolts, nuts, check nuts to earth test point including ncessary PCC 1:2:4, type B-1 pit, cover frame GI pipe 15mm dia light grade for protection of earthing lead and GI pipe 20mm dia for watering pipe with funnel wire mesh, salt, charcoal, dust and excavation as given in SSR-I complete all as specified and directed.
PES Installations Pvt Limited
MDD Medical Systems (India) Pvt. Ltd.
Prenit World LLP
Benson Medical Equipments (India) Pvt Ltd
Benson Medical Equipments (India) Pvt Ltd
Medical Product Service
PES Installations Pvt Limited
Prenit World LLP
PES Installations Pvt Limited
MDD Medical Systems (India) Pvt. Ltd.
Benson Medical Equipments (India) Pvt Ltd
Prenit World LLP
MDD Medical Systems (India) Pvt. Ltd.
Medical Product Service
PES Installations Pvt Limited
Prenit World LLP
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .