Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.0 LAccepted-AOC PALLAM SEYNAMVILAI BETHELPURAM POST KANYAKUMARI DIST PIN 629 803 | BETHELPURAM | KANYAKUMARI | TAMIL NADU | 629803 | ₹3.0 L | l1 | Accepted-AOC lowest value |
| Sl No | Description | Qty | Unit | SELVIN GNANA ROSE L1 |
|---|---|---|---|---|
| 1.01 | Loading & Unloading of PSC pole above 8.00 m length &(iii) Metal poles all sizes | 4 | Per pole | 1,600 ₹1,888 |
| 2.01 | Excavation of pole pit For pole above 8.00 m length by using JCB | 4 | Per pole | 2,000 ₹2,360 |
| 3.01 | Erection of PSC poles above 8.00m length by using crane | 4 | Per pole | 2,400 ₹2,832 |
| 4.01 | Loading & Unloading of PSC pole upto 8.00 m length JCB | 94 | Per pole | 28,200 ₹33,276 |
| 5.01 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM(500 upto 2KM) (9,8 mtr psc poles ) | 98 | Per pole | 49,000 ₹57,820 |
| 6.01 | Excavation of pole pit For pole upto 8.00 m length by using JCB | 94 | Per pit | 37,600 ₹44,368 |
| 7.01 | Erection of PSC poles upto 8.00m length by using crane | 94 | Per pole | 42,300 ₹49,914 |
| 8.01 | Fixing of LT shackle | 97 | each | 4,850 ₹5,723 |
| 9.01 | Dismantling &Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 1 | set | 675 ₹796.5 |
| 10.01 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 28 | set | 12,600 ₹14,868 |
Tender Value
Refer Docs
EMD Value
₹2,995
Closing Date
8 Dec 2025, 2:00 pmClosed
EE/D/NGl
Executive Engineer/Distn/ Nagercoil
Eos to 1no TYSY SC Thiru.Sundar raj ,Ulavatkonam under Parvathipuram section DCW estimate for Shifting 8Mtr psc pole in Commissioner at Christu nager .DCW estimate for Shifting 1 no 9 Mtr psc pole of Ht in water Tank Feeder as per the Request of
2025_EB_626007_1
EE/D/NGL/ETW- 22 /2025-26/ /25 dt 24.11.2025
Open Tender
Electrical Works
90 days
Office of the Executive Engineer TNPDCL / Distri
As specified in tender
3 documents required · 3 mandatory
₹0
₹2,995
Yes
20 Mar 2026
24 Nov 2025
9 Dec 2025
24 Nov 2025
8 Dec 2025
25 Nov 2025
24 Nov 2025 - 8 Dec 2025
Loading & Unloading of PSC pole above 8.00 m length &(iii) Metal poles all sizes
Excavation of pole pit For pole above 8.00 m length by using JCB
Erection of PSC poles above 8.00m length by using crane
Loading & Unloading of PSC pole upto 8.00 m length JCB
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM(500 upto 2KM) (9,8 mtr psc poles )
Excavation of pole pit For pole upto 8.00 m length by using JCB
Erection of PSC poles upto 8.00m length by using crane
Fixing of LT shackle
Dismantling &Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
For ordinary tree clearance and Throng bushes & trees.
Loading / Unloading of line materials
Fixing of LT PIN insulator
Drilling of Slotted Holes
Fixing of LT V,3.5 X arm
Fixing of LT single phase X arm
Fixing of LT Three phase X arm
Fixing of Aluminium knob
Erection of conductors of sizes upto 7/2.50 mm ACSR or other equivalent conductor(LT)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_748569.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid