Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.1 LAdmitted-Finance | -0.01% | ₹33.1 L | L1 | Admitted-Finance |
| 2 | L2₹33.1 LAdmitted-Finance | +0.00% | ₹33.1 L | L2 | Admitted-Finance |
| 3 | L3₹33.1 LAdmitted-Finance | +0.01% | ₹33.1 L | L3 | Admitted-Finance |
Tender Value
₹33.1 L
EMD Value
₹3.3 L
Closing Date
5 May 2026, 5:00 pmClosed
EO Tikri Baghpat
N.P.Tikri Baghpat
01 - Nagar mai Kuda Prabandhan avm sansadhano ke rakh rakhav avm prabandhan hetu MRF Center pr Gearage nirman karya.
2026_DOLBU_1139582_1
216/N.P.Tikri/2026-27 Dt. 10-04-2026
Open Tender
Miscellaneous Works
180 days
Tikri
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹3,894
EO Nagar Panchayat Tikri
₹3.3 L
25 May 2026
21 Apr 2026
6 May 2026
21 Apr 2026
5 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Earth work in excavation by mechanical means (hydraullic excavator ) / manual over area (exceeding 30cm in depth 1.5 m in width as well as 10 sqm on plan ) including getting out and disposal excavated earth lead upto 50m and lift up to 1.5m in comp position D.S.R 2023 SI NO 2.6.1 | - | cum | - | - | BI01010001010000000000000515BI0100001114 | |
provinding and laying in position cement concrete of specifed grade excluding the cost of centering and shuttering 1;4;8 (1 cement 4 coarse sand zone 111)derived from natural sources 8 grade stone aggregates 40mm nominal size derived from natural source ) DSR 2023SI.NO. 4.1.8 | - | cum | - | - | BI01010001010000000000000515BI0100001115 | |
M-150 brick work in (1:4)mortar with cement and f/sand in Sub structure in comp.position in sub -structure D.S.R 2023 SI NO 6.1.1 | - | cum | - | - | BI01010001010000000000000515BI0100001116 | |
M-150 brick work in (1:4)mortar with cement and f/sand in Super structure in comp.position in sub -structure DSR 2023 6.4.1 | - | cum | - | - | BI01010001010000000000000515BI0100001117 | |
12 mm thick plaster in (1:4) mortar with cement and f/sand on brick work in comp position DSR 2023 SI NO 13.4.1 | - | sqm | - | - | BI01010001010000000000000515BI0100001118 | |
Rcc work in (1:1;5;3) mortar in plinth beam with 2cm gauge stone grit cement c/sand including all material labour tools etc in comp.position DSR 2023 SI NO 5.2.2 | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
mild steel in rcc work in comp.position (s.i-504) | - | qtl | - | - | BI01010001010000000000000515BI0100001120 | |
providing wall putty on new surface with approvel quality material of berger /j.k./birla/or similar make 2 coats, DSR SI NO 13.8 | - | sqm | - | - | BI01010001010000000000000515BI0100001121 | |
finishing wall with Acrylic smooth exterior paint of required shade new work (two or more coat applied). DSR 13.46.1 | - | sqm | - | - | BI01010001010000000000000515BI0100001122 | |
STEEL WORK WELDED IN BUILT UP SECTIONS / FRAMED WORK INCLUDING CUTTING HOISTING FIXING IN POSITION AND APPLYING A PRIMING COAT OF APPROVED STEEL PRIMER USING STRUCTURAL STEEL ETC AS REQUIRED . IN GRADING FRAMES GUARD BAR LADDER RALLING BRACKETS GATES AND SIMILAR WORKS INcluding leaser cutting in complete/ possition in DSR 10.25 .2 | - | kg | - | - | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 0.89 MB
BOQ_2127765.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid