Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.7 Cr
Closing Date
29 Nov 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Arshia Sharma
POWERGRID CORPORATION OF INDIA LTD, CF-17, ACTION AREA-1C, NEWTOWN, KOLKATA - 700156
Civil works for installation of 500MVA transformer and other equipment at 400/220kV Subhasgram Ss
ER2/NT/W-CIVIL/DOM/E00/23/10883/I-4100/RFX 5002003010
Open
Civil - All
Works
SUBHASGRAM
29 Nov 2023
7 Nov 2023
29 Nov 2023
7 Nov 2023
28 Nov 2023
7 Nov 2023
POWER GRID CORPORATION OF INDIA LTD.
BOQ for Civil works for installation of 500MVA transformer and other equipment at 400/220kV Subhasgram Ss
Sl. No. Rate Ref. Activity code SAC code Item Description Unit Qty. Unit Rate(in Rs) Amount(in Rs.) Price incl. GST Amount excl. GST Amount incl. GST
A B C D C D E F G=Fx0.893 H=Gx1.18 I=ExG J=ExH
1 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil Cum 100.00 RATE AND AMOUNT TO BE QUOTED ONLINE ON PRANIT PORTAL ONLY 0.00 0.00 0.00
2 2.26.1 Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.All kinds of soil Cum 50.00 0.00 0.00 0.00
3 2.25 Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Cum 50.00 0.00 0.00 0.00
4 15.3 Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Cum 10 0.00 0.00 0.00
5 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
i) 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Cum 1 0.00 0.00 0.00
ii) 15.2.2 Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) Cum 1 0.00 0.00 0.00
6 SOR June23 100001453 Demolishing PCC including disposal-1:5:10 (PCC) Cum 67.5 0.00 0.00 0.00
7 SOR June23 100002580 Construction of rail cum road as per drawing including all item such as excavation,compactions, rolling watering, WBM etc. butexcluding concrete reinforcement and structural steel-Section having four rails Sqm. 49.97 0.00 0.00 0.00
8 SOR June23 100001442 Dismantling of existing brick drain (300mm widex500mm deep) RM. 40 0.00 0.00 0.00
9 SOR June23 100001720 Supplying, filling and compacting CNS material as per specification under floors, foundations, roads, cable trenches, drains Cu.M 200 0.00 0.00 0.00
10 SOR June23 100001712 Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm. 100 0.00 0.00 0.00
11 SOR June23 100001331 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc.but excluding the reinforcement incl. priming coat. MT 25.31 0.00 0.00 0.00
12 DSR'2021 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Cum. 25 0.00 0.00 0.00
13 20.1.2 Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) :450 mm dia piles RM. 100 0.00 0.00 0.00
14 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) Cum. 84.492 0.00 0.00 0.00
15 5.9.1 Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete Sqm 87.47 0.00 0.00 0.00
16 5.9.2 Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. Sqm 242.32 0.00 0.00 0.00
17 5.9.5 Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. Sqm 12.84 0.00 0.00 0.00
18 5.9.6 Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts Sqm 89.78 0.00 0.00 0.00
19 5.22.6 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. Kg 59297.96 0.00 0.00 0.00
20 5.33.1.1 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum. Cum. 302.53 0.00 0.00 0.00
21 5.35 Add for using extra cement in the items of design mix over and above the specified cement content therein. Quintal 21.176971095 0.00 0.00 0.00
22 26.31.2 Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make Sqm 49.42 0.00 0.00 0.00
23 Derived from DSR item -7217 Providing and fixing of SS anchor Fasteners (RCC / Brick) – M-8x75mm/M-10x100mm Each 50 0.00 0.00 0.00
24 SOR June 23 100001443 Dismantling of existing -3.75m black top road RM. 40 0 0.00 0.00
25 20.9 Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Each 77 0.00 0.00 0.00
26 20.6.1.2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing.Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge.Single pile upto 50 tonne Safe capacity.Routine test (Test Load 1.5 times the Safe capacity) Each 2 0.00 0.00 0.00
27 SOR June23 Supplying, filling and compacting stone boulders mixed with sand under foundations, roads, cable trenches, drains etc in layers not exceeding 250mm thickness including ramming, watering, compacting etc.(DSR Item No.16.3,16.4,16.3.8) Cum 38.09 0.00 0.00 0.00
28 SOR June24 Providing & Laying of PVC pipes for external sewerage system as per technical specification 150mm dia pipe Mtr. 6 0.00 0.00 0.00
29 Derived from SOR June25 Cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm 310.5 0.00 0.00 0.00
30 13.65.1 Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :Two or more coats on new work Sqm 100 0.00 0.00 0.00
31 20.2.1 Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used. 450 mm dia piles RM. 1669.9 0.00 0.00 0.00
32 Derived from DSR item 10.1 Fixing of existing Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete(excluding supply of structural steel). Kg 5062.29 0.00 0.00 0.00
33 1.1.1 CARRIAGE OF MATERIALS:By Mechanical Transport including loading,unloading and stacking Lime, moorum, building rubbish- 1km Cum 10.00 0.00 0.00 0.00
34 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) Cum 10.00 0.00 0.00 0.00
35 SOR June23 Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 brick aggregate) Cum 23.29 0.00 0.00 0.00
36 SOR June23 Antiweed treatment Sqm 310.50 0.00 0.00 0.00
37 SOR June23 Stone spreading in switchyard excluding PCC but including supply of stone. Sqm 100.00 0.00 0.00 0.00
38 4.5.1 Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete.1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources) Cum 10.00 0.00 0.00 0.00
TOTAL 0.00 0.00
GRAND TOTAL AMOUNT ₹ 0.00 ₹ 0.00
Note - Looking at the stringent time schedule for complition of the ICT foundation, it is required to do 5 piles per day I,e, 2 rig at working condition at site.
Name of Work :- "Quantity Calculation for Development of store area for stacking of tower parts, Construction of CT foundation and associated works at Alipurduar ±800 KV HVDC Station.
Sl.No. Description of Item Unit No Length Breadth Height Qnty
1 Surface dressing Sqm
Behind CT portion 1 18 2.00 36.00 36
For storage of Tower parts 1 29 23.00 667.00 667
2 Excavation Cum
drain near oil drum area 1 118.00 0.90 0.675 71.69 71.685
3 Backfilling Cum
Excavation 171.27 210.88
CT foundation -5.85 -5.85
4 PCC - 1:4:8 Cum
drain near oil drum area 1 118.00 1.29 0.075 11.42 11.4165
Brick Pedestal 45 5.15 0.495 0.075 8.60
5 PCC- 1:2:4 Cum
Behind CT portion 1 18 2.00 0.075 2.70 2.70
For storage of Tower parts 1 29 23.00 0.075 50.03 50.03
Approach road 1 23 5.00 0.1 11.50 11.50
Store entrance left portion 1 25.10 12.30 0.075 23.15 23.15
Near oil drum shade 1 54 11.00 0.075 44.55 44.55
CT foundation 0 1.2 1.2 0.25 0.00 0.00
drain near oil drum area 1 118 0.45 0.025 1.33 1.33
Pedestal coping 45 5 0.23 0.05 2.59 2.59
Drain crossing slab 1 2 1.60 0.2 0.64 0.64
Storage of reconductring conductor 1 30 20.00 0.075 45.00 45.00
6 Centering and Shuttering Sqm
CT foundation 1 30.76 0.075 2.31 2.31
Fencing Drain 2 137.00 0.075 20.55 20.55
drain near oil drum area 2 118.00 0.075 17.70 17.70
Behind CT portion 2 18 0.1 3.60 3.60
For storage of Tower parts 2 29 0.1 5.80 5.80
Store entrance left portion 2 25.1 0.1 5.02 5.02
RC front side 2 4 0.075 0.60 0.60
Pedestal coping 90 5.00 0.05 22.50 22.50
Brick work base pcc 1 32.00 0.075 2.40 2.40
7 Reinforcement Kg
CT foundation- Raft-10Ф@200c/c 8 14.00 0.62 69.44 0.00
Drain crossing slab 1 9.00 1.90 0.395 6.75 6.75
8 Brick work Cum 1292.99
drain near oil drum area 2 118.00 0.35 0.3 24.43 24.43
Pedestal for storage of tower parts 45 5.00 0.23 0.375 19.41 19.41
9 Plaster work- 1:4 Sqm 80.60
Fencing drain 2 137.00 0.90 246.60 246.6
drain near oil drum area 2 118.00 0.90 212.40 212.4
Pedestal for storage of tower parts 45 5.00 0.60 135.00 135
10 Neat punning Sqm
Fencing drain 1 137.00 0.40 54.80 54.8
drain near oil drum area 1 118.00 0.40 47.20 47.2
Pedestal for storage of tower parts 45 5.00 0.60 135.00 135
11 RCC(1:1.5:3) Cum
CT spare foundation- Raft 1 13.5 1.58 0.25 5.33
12 Structural steel Kg 1 X X 100 100
13 Brick flat soling Sqm 1 29 23 X 667
Name of Work :- "Quantity Calculation for Development of store area for stacking of tower parts, Construction of CT foundation and associated works at Alipurduar ±800 KV HVDC Station.
Sl.No. Description of Item Unit No Length Breadth Height Qnty
1 Surface dressing Sqm
Behind CT portion 1 18 2.00 36.00 36
For storage of Tower parts 1 29 23.00 667.00 667
2 Excavation Cum
drain near oil drum area 1 118.00 0.90 0.675 71.69 71.685
3 Backfilling Cum
Excavation 171.27 169.82
CT foundation -5.85 -5.85
4 PCC - 1:4:8 Cum
CT foundation 5 1.2 1.2 0.075 0.54 0.54
drain near oil drum area 1 118.00 0.90 0.075 7.97 7.965
5 PCC- 1:2:4 Cum
Behind CT portion 1 18 2.00 0.1 3.60 3.60
For storage of Tower parts 1 29 23.00 0.1 66.70 66.70
Approach road 1 23 5.00 0.1 11.50 11.50
Store entrance left portion 1 25.10 12.30 0.1 30.87 30.87
Near oil drum shade 1 54 11.00 0.1 59.40 59.40
CT foundation 5 1.2 1.2 0.25 1.80 1.80
drain near oil drum area 1 118 0.40 0.075 3.54 3.54
Pedestal coping 45 5 0.23 0.05 2.59 2.59
Drain crossing slab 1 2 1.60 0.2 0.64 0.64
Storage of reconductring conductor 1 30 20.00 0.075 45.00 45.00
6 Centering and Shuttering Sqm
CT foundation 20 1.2 0.075 1.80 1.80
Fencing Drain 2 137.00 0.075 20.55 20.55
drain near oil drum area 2 118.00 0.075 17.70 17.70
Behind CT portion 2 18 0.1 3.60 3.60
For storage of Tower parts 2 29 0.1 5.80 5.80
Store entrance left portion 2 25.1 0.1 5.02 5.02
RC front side 2 4 0.075 0.60 0.60
Pedestal coping 90 5.00 0.05 22.50 22.50
Brick work base pcc 1 32.00 0.075 2.40 2.40
7 Reinforcement Kg
CT foundation 5 8 1.90 0.395 30.02 30.02
Drain crossing slab 1 9.0 1.90 0.395 6.75 6.75
8 Brick work Cum 1357.77
drain near oil drum area 2 118.00 0.23 0.9 48.85 48.85
Pedestal for storage of tower parts 45 5.00 0.23 0.3 15.53 15.53
9 Plaster work- 1:4 Sqm 129.50
Fencing drain 2 137.00 0.90 246.60 246.6
drain near oil drum area 2 118.00 0.90 212.40 212.4
Pedestal for storage of tower parts 45 5.00 0.60 135.00 135
10 Neat punning Sqm
Fencing drain 1 137.00 0.40 54.80 54.8
drain near oil drum area 1 118.00 0.40 47.20 47.2
Pedestal for storage of tower parts 45 5.00 0.60 135.00 135
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
8 Attachment and Bid Forms Vol-III.xls
xls • 2.33 MB
9 BOQ Item Details.xlsx
xlsx • 0.04 MB
7E SFQP CIVIL.pdf
pdf • 8.00 MB
7F SFQP PILE FOUNDATION.pdf
pdf • 1.65 MB
7A DRAWING.pdf
pdf • 6.43 MB
7B SCOPE OF WORK.pdf
pdf • 0.29 MB
7C TS FOR CIVIL WORKS.pdf
pdf • 0.13 MB
7D TS PILE FOUNDATION.pdf
pdf • 1.47 MB
02 Section - II ITB SSTE civil.pdf
pdf • 0.69 MB
1 IFB VOLI.doc
doc • 0.28 MB
3 BDS.doc
doc • 0.31 MB
3A Annexure-A (QR).doc
doc • 0.21 MB
3B Annexure-B (BDS).pdf
pdf • 0.07 MB
3C Annexure-C MII Purchase Preference Policy.docx
docx • 0.06 MB
4-GCC-Civil.pdf
pdf • 0.66 MB
5 -SCC.doc
doc • 0.31 MB
5A-Appendix-I to SCC.doc
doc • 0.33 MB
6-Section - VI Forms and Proceedures Vol-I.doc
doc • 0.56 MB
Annexure_Safety Requirement.pdf
pdf • 1.22 MB
Bid_sale_Extension_Letter.doc
doc • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .