Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -30.00% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 LAdmitted-Finance | -18.96% | ₹2.2 L | L2 | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹5,520
Closing Date
27 Feb 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Construction of Waiting shed at shamshanghat at Ratnal Pyt.Ratnal Block Bishnah under PRI for the FY 2025-26. (Block level)
2026_RDPR_304049_3
e-NIT No. 851- REWJ of 2025-26 dated 20-02-2026
Open Tender
Civil Works
45 days
Executive engineer REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,520
28 Feb 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Excavation in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying RCC work with: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)including curing but excluding the cost of centring and shuttering.
Brickwork with common burnt clay bricks of class designation 7.5 in foundation and plinth incl.curing in cement mortar 1:6.
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for(a) :Foundations, footings, bases of columns etc. for mass concrete.
(b) Column
(c) Suspended floors
( d) Lintel and beams
Reinfrocement for RCC work incld. Cutting , bending, placing etc
12 mm thick cement plaster in 1:6 mix
6 mm thick cement plaster in 1:3 mix ceiling
Cement concrete flooring 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete 40mm thick with 20 mm nominal size stone aggregate
Sand + Bajri for (25km)
Add cost of sign board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_987593.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid