Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.2 L+₹912.59 (0.79%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.2 L+₹9,865.72 (8.59%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
2 Mar 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Construction of culvert near the house of Satpal Sharma, Garar Colony Pyt. Sainth Block Khour District Jammu under CDF for the year of 2025-26
2026_RDPR_304202_2
e-NIT No. 860- REWJ of 2025-26 dated 21-02-2026
Open Tender
Civil Works
Percentage
Executive Engineer REW Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH 0515
₹3,880
7 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc. getting out excavated earth and disposal of surplus excavated earth as directed:in all kinds of soil
P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level.
P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level.
Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size)
Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars
Centring & shuttering including strutting, propping etc. and removal of the formwork.
Centring & shuttering including strutting, propping etc. and removal of the formwork FOR Suspended floor
Centring & shuttering including strutting, propping etc. and removal of the formwork FOR Edges of slab Above 20 cm wide
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Carriage of constructed material FOR SAND 06 KM by MT
Carriage of constructed material FOR Aggregate 07 KM by MT
ADD COST OF SIGN BOARD=
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_988162.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .