Loading…
Loading…
Tender Value
₹14.1 L
EMD Value
₹28,200
Closing Date
29 Jun 2026, 9:00 amDue tomorrow
Similar tender results from the same govt authority in the past 3 years.
EE RED BAGHPAT
EE,DAO,AE RED BAGHPAT
Kasba Khekra Mai kashyap Mohalla Mai Samudaik Bhawan ka Nirman Karya.
2026_REDUP_1163095_1
288/RED/TNDR/26-27DT23-05-2026
Open Tender
Civil Works - Buildings
120 days
EE RED BAGHPAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹766
₹28,200
Yes
23 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.B. work manually by mechanical means inculding stacking of steel bars and disposal of unserviceable materials within 50 metre, lead as per direction of Engineer-in- charge. As per DSR 15.4 | 9.53 | Cum | 2,264.3 | ₹21,578.78 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.As per DSR15.7.1 In mud mortar | 59.9 | Cum | 502.35 | ₹30,090.77 |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.as per DSR 15.60 | 39.58 | Cum | 188.11 | ₹7,445.39 |
| 4 | Removing mortar from bricks in mud mortar and cleaning bricks inculding stacking within a lead of 50 m as per DSR 15.8.1. | 16,587 | nos | 3.32 | ₹55,068.84 |
| 5 | Deduction of coat of metal making by available balance SOB | 8,293 | nos | 5 | ₹41,465 |
| 6 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5m,as directed by Engineer Incharge in cartage DSR 2.8.1. | 27.74 | Cum | 185.51 | ₹5,146.05 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) Complete al as per DSR 4.1.10 | 12.36 | Cum | 4,645.54 | ₹57,418.87 |
| 8 | M-150 B/W in 1:6 Cement & C/Sand mix mortar in Plinth and Foundation including in all respect Complete all as per DSR 6.1.2 | 18.48 | Cum | 5,082.86 | ₹93,931.25 |
| 9 | M-150 B/W in 1:6 Cement & C/Sand mix mortar in Super Structure including in all respect Complete all as per DSR 6.42 | 38.08 | Cum | 6,659.34 | ₹2,53,587.67 |
| 10 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete all as per DSR 2.27 | 7.86 | Cum | 1,513.51 | ₹11,896.19 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 1.39 MB
BOQ_2180377.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid