Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.5 LAdmitted-Finance | -37.50% | ₹45.5 L | L1 | Admitted-Finance |
| 2 | L2₹47.3 LAdmitted-Finance | -35.10% | ₹47.3 L | L2 | Admitted-Finance |
| 3 | L3₹48.4 LAdmitted-Finance | -33.50% | ₹48.4 L | L3 | Admitted-Finance |
| 4 | L4₹50.6 LAdmitted-Finance 37 12 NEAR PNB AKHNOOR JAMMU PIN 181201 | JAMMU | JAMMU AND KASHMIR | 181201 | -30.55% | ₹50.6 L | L4 | Admitted-Finance |
| 5 | L5₹50.7 LAdmitted-Finance | -30.37% | ₹50.7 L | L5 | Admitted-Finance |
Tender Value
₹72.8 L
EMD Value
₹1.5 L
Closing Date
8 May 2026, 4:00 pmClosed
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
BOQ
2026_PWDJK_308230_1
Short e-NIT No. DRSP/07 of 2026-27 Dated 20-04-2026
Open Tender
Civil Works
270 days
R S Pura
eNIT/SBD
3 documents required · 3 mandatory
₹1,500
Executive Engineer PWD RandB Division R S Pura
₹1.5 L
R S Pura
15 May 2026
20 Apr 2026
9 May 2026
20 Apr 2026
8 May 2026
20 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil | |||||
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40mm nominal size crushed. | |||||
| 3Providing and laying in position cement concrete of 1:3:6 grade (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size) excluding the cost of centering and shuttering. All work upto plinth level. | |||||
| 4Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 5Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 6Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | |||||
| 7Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | |||||
| 8Reinforced cement concrete work in beams, suspended floors, roofs having slope upto15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 10Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_999121.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid