Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | -7.00% | ₹1.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.3 L+₹5,440 (4.30%)Admitted-Fee/PreQual/Technical/Finance | -3.00% | ₹1.3 L+₹5,440 (4.30%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹9,424.80 (7.45%)Admitted-Fee/PreQual/Technical/Finance | -0.07% | ₹1.4 L+₹9,424.80 (7.45%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹6,800
Closing Date
24 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF LATERINE/ BATHROOM NEAR JAMIA MASJID AT KANTHBAG
2026_RDPR_318826_19
NIT_27_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
S K Pora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹6,800
Yes
15 Sept 2026
31 Jul 2026
25 Aug 2026
31 Jul 2026
24 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trench foundation, drains etc over areas (Exceeding 30cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed -All kinds of soils | 14.25 | Cum | 252 | ₹3,591 |
| 2 | P/L of Stone soling tightly hand Picked using Soling Stone including carriage 10 km via M.T | 15.74 | Cum | 903.72 | ₹14,224.55 |
| 3 | Providing and laying Reinforcement cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level.1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) Crushed Aggregate in raft ,plinth band,suspended floor for beams, etc | 0.81 | Cum | 6,344.25 | ₹5,138.84 |
| 4 | Providing and laying Reinforcement cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level.1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) Crushed Aggregate in raft ,plinth band,suspended floor for beams, etc Above plinth level SLAB | 0.39 | Cum | 8,953.95 | ₹3,492.04 |
| 5 | Supplying /Fitting/Fixing reinforcment for R.C.C Work including straightening,bending to proper shapes and length as per details,supplying and bending with G20 annealed back wire and placing in position with proper blocks ,supports, chairs,spacers etc - complete upto ist floor level ISI approved super ductile TMT bar | 1.2 | QTL | 7,855 | ₹9,426 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.57 | Cum | 5,733.6 | ₹9,001.75 |
| 7 | Brick work with FPS bricks of class designation 75 in foundation and plinth in cement mortar in 1:6 mix incl carraige of bricks upto site of work complete including extra upto floor v level including carraige and head load | 5.45 | Cum | 6,183.75 | ₹33,701.44 |
| 8 | Centering and Shuttring including Strutting ,Propping removal of formwork- Complete Job | 14.27 | Sqm | 262.3 | ₹3,743.02 |
| 9 | P/L of 50mm thick cement concrete flooring 1:2:4 mix with appproved aggregate 20mm N/Size | 1.46 | Sqm | 562.15 | ₹820.74 |
| 10 | 12mm thick cement plaster on the rough side of single or half brick walls of mix 1:6 ( 1 cement :6 coarse sand) | 18.65 | Sqm | 283.5 | ₹5,287.28 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1052843.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .