| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.3 LAccepted-AOC NOCHIPALAYAM AUTHUR PO KARUR 2 | ₹87.3 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical technical bid ineligible |
| Sl No | Description | Qty | Unit | K.SELVARAJ L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavating and deposting on bank with initial lead of 10m& intial lift of 2m in hard stiff clay, stiff black cotton, hard red earth shales , murram, gravel, stoney earth mixed with small size boulders etc completed as per std specification. | 185 | M3 | 246.5 ₹45,602.50 |
| 2.00 | Plain Cement concrete of mix 1:4:8 (One part of cement, four part of sand and eight part of aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification | 40 | M3 | 5,269.2 ₹2.1 L |
| 3.00Steel centering for sides and soffits including supports and strutting upto 1m height for plain surface such as RCC slab with all cross bracings using mild steel sheet of size 90cmx60cmx10 gauge stiffened with welded miled steel angles of size 25x25x6mm for laid over silver oak for coundary wood joints of size 10x6.5 cm spaced at about 90cm centre to centre and supported by casurials props of 10cm to 13 cm dia spaced at about 75cm centre to centre and suppor etc completed as per std specification. Ground Floor & First Floor | ||||
| 3.01 | A) Column | 303 | M2 | 1,227.7 ₹3.7 L |
| 3.02 | B) Grade beam | 181 | M2 | 494 ₹89,414 |
| 3.03 | C) Lintel. Beam &slab | 722 | M2 | 1,023.1 ₹7.4 L |
| 4.00 | Supplying fabricating and placing in position of steel rods using TMT Steel ISI including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 13,620 | Kgs | 89.85 ₹12.2 L |
| 5.00Vibrated Reinforced Cement Concrete M20 Mix using 20mm size ISS HBG metal machine crushed from approved quarry for Reinforced Concrete Works including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete | ||||
| 5.10 | Upto Basement | 56 | M3 | 8,258.3 ₹4.6 L |
| 5.20 | Ground floor | 41 | M3 | 8,390 ₹3.4 L |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
9 Aug 2024, 3:00 pmClosed
Executive officer
Annur Town Panchayat
Construction of New office Building Mettupalayam Road at SF No.319, 320 in Annur Town Panchayat.
2024_DTP_467825_1
123/2024/A2
Open Tender
Civil Works - Buildings
180 days
Annur Town Panchayat
as per norms
2 documents required · 2 mandatory
₹0
₹2.1 L
16 Jun 2026
29 Jul 2024
9 Aug 2024
29 Jul 2024
9 Aug 2024
29 Jul 2024
29 Jul 2024 - 9 Aug 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid