| 1 | L1₹81.8 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹89.0 L+₹7.2 L (8.75%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer | |
| 3 | L3₹90.0 L+₹8.2 L (9.96%)Rejected-Finance | L3 | Rejected-Finance L3 Tenderer |
Tender Value
₹91.4 L
EMD Value
₹92,000
Closing Date
12 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Creation and Upgradation of Streets and Lanes 17 Nos in Lathur Block of Chengalpattu District Having Package No.14
2022_RDTN_238280_1
RC No 4683.2022.A10 Dt.24.06.2022
Open Tender
Civil Works - Roads
Item Rate
90 days
Lathur Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹92,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
5 Jul 2022
Amount
PART I: Providing Paver Block Road @ RC Vellimedu in Cheyyur Village Panchayat Estimate Amount : Rs.4.77 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART II: Providing Paver Block Road in Velaramman Koil Street @ North Cheyyur in Cheyyur Village Panchayat Estimate Amount : Rs.2.38 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART III: Providing Paver Block Road in Mariyamman Koil Street @ North Cheyyur in Cheyyur Village Panchayat Estimate Amount : Rs.4.24 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART IV: Providing Paver Block Road in West Cheyyur Bus Stop Street in Cheyyur Village Panchayat Estimate Amount : Rs.5.03 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART V: Providing Paver Block Road in Vengattu Street in Kadalur Village Panchayat Estimate Amount : Rs.15.58 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART VI: Providing Paver Block Road in Mugaiyur Iyyar Street in Mugaiyur Village Panchayat Estimate Amount : Rs.3.18 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART VII: Providing Paver Block Road in Kolavanchi 1st Street in Mugaiyur Village Panchayat Estimate Amount : Rs.2.53 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART VIII: Providing Paver Block Road in Perundhuravu Village Street in Mugaiyur Village Panchayat Estimate Amount : Rs.3.18 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART IX: Providing Paver Block Road in Mugaiyur Colony Street in Mugaiyur Village Panchayat Estimate Amount : Rs.6.74 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART X: Providing Paver Block Road in Udalkarakuppam in Nedumaram Village Panchayat Estimate Amount : Rs.5.83 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XI: Providing Paver Block Road in Otter Maistry Street in Nedumaram Village Panchayat Estimate Amount : Rs.6.63 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XII: Providing Paver Block Road in Kolathur Colony in Kodur Village Panchayat Estimate Amount : Rs.6.36 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XIII: Providing Paver Block Road in Kolathur Colony in Kodur Village Panchayat Estimate Amount : Rs.5.30 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XIV: Providing Paver Block Road in Manikuppam Colony in Nelvoypalayam Village Panchayat Estimate Amount : Rs.5.19 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XV: Providing Paver Block Road in Kumarakuppam Colony 3rd Street in Nelvoypalayam Village Panchayat Estimate Amount : Rs.5.09 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XVI: Providing Paver Block Road in Kumarakuppam Village Cross Street in Nelvoypalayam Village Panchayat Estimate Amount : Rs.3.16 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
PART XVI: Providing Paver Block Road in Navakkal Kuttai Colony Street in Thattambattu Village Panchayat Estimate Amount : Rs.6.25 Lakhs
Dismantling of existing Cement Concrete 20mm and 40mm metal all labour charges for filling etc.,complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of Interlocking , including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M/s.SHANMUGAVEL CONSTRUCTION
S.RADHAKRISHNAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .