| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-Finance | L1 | Accepted-Finance Less ER | |
| 2 | L2₹13.0 L+₹20,271.22 (1.59%)Rejected-Finance | L2 | Rejected-Finance Above ER |
Tender Value
₹13.3 L
EMD Value
₹14,000
Closing Date
8 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO,Ellapuram
BDO,Ellapuram
Construction of Compoundwall in Periya Sengathakulam ST Colony BG at Vadamadurai Panchayat
2025_RDTN_516845_1
Rc.No1075/2024/A6 Dt.02.01.2025
Open Tender
Civil Works
Item Rate
180 days
Ellapuram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹14,000
Yes
22 Jan 2025
6 Jan 2025
8 Jan 2025
6 Jan 2025
8 Jan 2025
6 Jan 2025
Amount
1.Construction of Compoundwall in Periya Sengatha kulam ST colony BG at Vadamadurai Panchayat in Ellapuram Panchayat Union in Tiruvallur District.Under MINES- 2024-25
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed..
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
BMG ENTERPRISES (BID ID -1228032)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_615039.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .