Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -18.21% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 L+₹11,268.96 (4.16%)Admitted-Finance 296 36 M S LAKSHYA CONSTRUCTION CO KADEPUR ROAD 094503 KANPUR NAGAR UTTAR PRADESH 208027 | KANPUR NAGAR | UTTAR PRADESH | 208027 | -14.81% | ₹2.8 L+₹11,268.96 (4.16%) | L2 | Admitted-Finance |
Tender Value
₹3.3 L
EMD Value
₹6,629
Closing Date
4 May 2026, 5:00 pmClosed
Sr.RM RIICO jhunjhunu
RIICO jhunjhunu
Maintenance of woodland boundary wall and supply and stacking of good earth at Woodland at Industrial area Jhunjhunu Ph-II
2026_RIICO_553539_1
01/2026-27/148/4
Open Tender
Civil Works
Percentage
60 days
I/A Jhunjhunu
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
RIICO Jhunjhunu
₹6,629
11 May 2026
22 Apr 2026
5 May 2026
22 Apr 2026
4 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Based on INTEGRATED BUILDING WORKS BSR 2022 | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | - | - |
| 1.02 | 2, Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc., Good soil of earth | - | Cum | - | - |
| 1.03 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:, Old work (One or more coats). | - | Sqm | - | - |
| 1.04 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:, New work (Two or more coats applied @ 3.84 kg/10 sqm). | - | Sqm | - | - |
| 1.05 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :, 25 mm thick | - | Sqm | - | - |
| 1.06 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil | - | Sqm | - | - |
| 1.07 | Earth, Sand, Lime, Morrum manure or sludge For 1 Km. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
tdboundarywall.pdf
Tender Documents • 0.19 MB
BOQ_986029.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .