Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.1 LAccepted-AOC | ₹45.1 L Quoted ₹38.2 L | L1 | Accepted-AOC L1 Contractor Tender successfully awarded. |
| 2 | Rejected-Technical OPPOSITE TO TNEB MOOLACHEL THUCKALAY POST THUCKALAY 629175 | THUCKALAY | KANYAKUMARI | TAMIL NADU | 629175 | - | - | Rejected-Technical Techno commercial bid is not in order |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techno commercial bid is not in order |
| Sl No | Description | Qty | Unit | Reginald Michael Dhas L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavating and depositing on bank with initial lead of 10m & lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales murram gravel stoney earth and earth mixed with small size boulders for foundation. | 122 | cu.m | 23,180 ₹27,352.4 |
| 2.00 | Providing anti termite treatement in 4 stages (i) immediately after earthwork excavation and before laying foundation concrete (ii) after refilling for sides of foundation (iii) Before laying of flooring concrete and outside of basement upto 1m alround the building using termite 250ml for 5 litres of water. | 115.5 | sq.m | 4,620 ₹5,451.6 |
| 3.00 | Providing PCC 1:4:8 using 40mm HBG metal including cost of all materials, lead, lift, labour, curing etc., complete. | 8.5 | cu.m | 42,925 ₹50,651.5 |
| 4.00 | R.R.Masonry in CM 1:6 using rough stone including cost of all materials, labour, lead, lift, curing etc., complete. | 81 | cu.m | 4,05,000 ₹4,77,900 |
| 5.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for with centering, shuttering, strutting, formwork, lead, lift, labour, curing, etc., complete. But excluding cost of steel - Plinth Beam. | 5.5 | cu.m | 72,050 ₹85,019 |
| 6.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for with centering, shuttering, strutting, formwork, lead, lift, labour, curing, etc., complete. But excluding cost of steel - for Lintel. | 3 | cu.m | 54,000 ₹63,720 |
| 7.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for with centering, shuttering, strutting, formwork, lead, lift, labour, curing, etc., complete. But excluding cost of steel - for Sunshade in ground floor. | 3 | cu.m | 66,000 ₹77,880 |
| 8.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for with centering, shuttering, strutting, formwork, lead, lift, labour, curing, etc., complete. But excluding cost of steel - for Roof slab in ground floor. | 15.5 | cu.m | 2,63,500 ₹3,10,930 |
| 9.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for with centering, shuttering, strutting, formwork, lead, lift, labour, curing, etc., complete. But excluding cost of steel - for Pre-Cast Slab. | 1.9 | cu.m | 19,000 ₹22,420 |
| 10.00 | Refilling with excavated soil complying with standard specification for filling in foundation and basement, including cost of labour and tools, lead, lift, etc., complete. | 57 | cu.m | 1,995 ₹2,354.1 |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
29 Oct 2025, 3:00 pmClosed
SE/KKEDC/Nagercoil
SE/KKEDC/Nagercoil
C/o of new building of boothapandy distribution section and sub division office at boothapandy in KK district
2025_EB_614157_1
KKEDC/05/2025-26
Open Tender
Civil Works - Buildings
270 days
Office of SE/KKEDC/NGL
as per specification
4 documents required · 4 mandatory
₹0
₹53,000
Yes
17 Feb 2026
15 Oct 2025
30 Oct 2025
15 Oct 2025
29 Oct 2025
15 Oct 2025
15 Oct 2025 - 29 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
spec.pdf
Tender Documents • 1.04 MB
BOQ_733823.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid