Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.2 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹103.4 Cr+₹4.2 Cr (4.19%)Admitted-Finance PREMISES NO B 38 GROUND FLOOR VINYAK RESIDENCY HARDA BYPASS ROAD NARMADAPURAM MADHYA PRADESH 461001 | NARMADAPURAM | NARMADAPURAM | MADHYA PRADESH | 461001 | L2 | Admitted-Finance | |
| 3 | L3₹104 Cr+₹4.8 Cr (4.80%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹105.9 Cr+₹6.6 Cr (6.68%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹106.1 Cr+₹6.8 Cr (6.88%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HVS Construction Materials Pvt. Ltd. L15 | Bhavya Construction L5 | M/s.Naagaamii Infratech Private Limited L8 | M/s Heera Ram Godara L14 | Sudhakara Infratech Private Limited L10 | LLC Multi Interregional Company MMK L7 | A S CONSTRUCTION COMPANY L12 | J INFRATECH LIMITED L16 | Narendra Sharma Construction Private Limited L9 | Hardayal Constructions and Projects LLP L3 | S.S. Infrazone Private Limited L4 | Shivalik Buildtech Private Limited L1 | M/s Z. RULHO L6 | BCC Buildtech Limited L2 | Simplex Infrastructures Limited L11 | JAYSHREE INTERNATIONAL L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of
Nagaland on EPC mode (Package-V) under NH (O)-TSP | 1 | Lumpsum | 1,21,48,54,600 ₹1,21,48,54,600 | 1,06,06,76,750 ₹1,06,06,76,750 | 1,09,98,48,000 ₹1,09,98,48,000 | 1,21,00,00,000 ₹1,21,00,00,000 | 1,11,35,25,000 ₹1,11,35,25,000 | 1,08,99,99,999 ₹1,08,99,99,999 | 1,17,21,00,000 ₹1,17,21,00,000 | 1,21,50,00,000 ₹1,21,50,00,000 | 1,11,15,80,000 ₹1,11,15,80,000 | 1,04,00,00,000 ₹1,04,00,00,000 | 1,05,87,32,500 ₹1,05,87,32,500 | 99,24,00,000 ₹99,24,00,000 Lowest | 1,07,80,00,000 ₹1,07,80,00,000 | 1,03,39,87,500 ₹1,03,39,87,500 | 1,14,85,21,000 ₹1,14,85,21,000 | 1,20,00,00,000 ₹1,20,00,00,000 |
Tender Value
₹176.8 Cr
EMD Value
₹1.8 Cr
Closing Date
19 Aug 2025, 3:00 pmClosed
AK Jha
NHIDCL HQ New Delhi
Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length - 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP
2025_NHIDC_864082_1
NHIDCL/CivilWork /Nagaland/P-D/Pkg5/2020
Open Tender
Civil Works
EPC Contract
730 days
Nagaland
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,600
MD NHIDCL
₹1.8 Cr
NHIDCL HQ New Delhi
2 Mar 2026
10 Jun 2025
20 Aug 2025
10 Jun 2025
19 Aug 2025
18 Jul 2025
10 Jun 2025 - 5 Jul 2025
7 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of
Nagaland on EPC mode (Package-V) under NH (O)-TSP | - | Lumpsum | - | - |
stage.html
html • 0.06 MB
technical_908427.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
RFP.pdf
Tender Documents • 2.06 MB
BOQ_908427.xls
BOQ • 0.27 MB
DCA.pdf
Tender Documents • 1.87 MB
Schedules.pdf
Tender Documents • 3.77 MB
BOQ.xls
BOQ • 0.27 MB
Tenderdocument.pdf
Tender Documents • 2.06 MB
Tenderdocument_2.pdf
Tender Documents • 1.87 MB
Tenderdocument_3.pdf
Tender Documents • 3.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .