Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.2 CrAdmitted-Finance | ₹99.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹103.4 CrAdmitted-Finance PREMISES NO B 38 GROUND FLOOR VINYAK RESIDENCY HARDA BYPASS ROAD NARMADAPURAM MADHYA PRADESH 461001 | NARMADAPURAM | NARMADAPURAM | MADHYA PRADESH | 461001 | ₹103.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹104 CrAdmitted-Finance | ₹104 Cr | L3 | Admitted-Finance |
| 4 | L4₹105.9 CrAdmitted-Finance | ₹105.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹106.1 CrAdmitted-Finance | ₹106.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HVS Construction Materials Pvt. Ltd. L15 | Bhavya Construction L5 | M/s.Naagaamii Infratech Private Limited L8 | M/s Heera Ram Godara L14 | Sudhakara Infratech Private Limited L10 | LLC Multi Interregional Company MMK L7 | A S CONSTRUCTION COMPANY L12 | J INFRATECH LIMITED L16 | Narendra Sharma Construction Private Limited L9 | Hardayal Constructions and Projects LLP L3 | S.S. Infrazone Private Limited L4 | Shivalik Buildtech Private Limited L1 | M/s Z. RULHO L6 | BCC Buildtech Limited L2 | Simplex Infrastructures Limited L11 | JAYSHREE INTERNATIONAL L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of
Nagaland on EPC mode (Package-V) under NH (O)-TSP | 1 | Lumpsum | 1,21,48,54,600 ₹121.5 Cr | 1,06,06,76,750 ₹106.1 Cr | 1,09,98,48,000 ₹110.0 Cr | 1,21,00,00,000 ₹121 Cr | 1,11,35,25,000 ₹111.4 Cr | 1,08,99,99,999 ₹109.0 Cr | 1,17,21,00,000 ₹117.2 Cr | 1,21,50,00,000 ₹121.5 Cr | 1,11,15,80,000 ₹111.2 Cr | 1,04,00,00,000 ₹104 Cr | 1,05,87,32,500 ₹105.9 Cr | 99,24,00,000 ₹99.2 Cr | 1,07,80,00,000 ₹107.8 Cr | 1,03,39,87,500 ₹103.4 Cr | 1,14,85,21,000 ₹114.9 Cr | 1,20,00,00,000 ₹120 Cr |
Tender Value
₹176.8 Cr
EMD Value
₹1.8 Cr
Closing Date
19 Aug 2025, 3:00 pmClosed
AK Jha
NHIDCL HQ New Delhi
Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length - 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP
2025_NHIDC_864082_1
NHIDCL/CivilWork /Nagaland/P-D/Pkg5/2020
Open Tender
Civil Works
730 days
Nagaland
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,600
MD NHIDCL
₹1.8 Cr
NHIDCL HQ New Delhi
2 Mar 2026
10 Jun 2025
20 Aug 2025
10 Jun 2025
19 Aug 2025
18 Jul 2025
10 Jun 2025 - 5 Jul 2025
7 Jul 2025
stage.html
html • 0.06 MB
technical_908427.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
RFP.pdf
Tender Documents • 2.06 MB
BOQ_908427.xls
BOQ • 0.27 MB
DCA.pdf
Tender Documents • 1.87 MB
Schedules.pdf
Tender Documents • 3.77 MB
BOQ.xls
BOQ • 0.27 MB
Tenderdocument.pdf
Tender Documents • 2.06 MB
Tenderdocument_2.pdf
Tender Documents • 1.87 MB
Tenderdocument_3.pdf
Tender Documents • 3.77 MB
Download all tender documents and submit your bid