| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC | ₹39.8 L | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹40.7 L+₹89,811.24 (2.26%)Rejected-Finance | ₹40.7 L+₹89,811.24 (2.26%) | L2 | Rejected-Finance REJECT |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹39.9 L
EMD Value
₹39,916
Closing Date
21 Apr 2026, 5:00 pmClosed
Additional Cheif Executive Officer
Z.P.Satara
Construction of K.T. Weir at (Nearest Borgewadi Dam) Manyachiwadi Kumbhargav Tal Patan Dist Satara
2026_SATAR_1294855_14
E-Tender Notice No.01/02 2025-26 2nd Call
Open Tender
Civil Works - Water Works
Percentage
365 days
Manyachiwadi Kumbhargav
As Per B-1 Tender
7 documents required · 7 mandatory
₹1,000
₹39,916
10 Aug 2026
14 Apr 2026
23 Apr 2026
14 Apr 2026
21 Apr 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning,cutting thorny shurbs bushes grass as directed with 15 m lead and lift up to 1.50 m | - | Sqm | - | - |
| 2 | Dismantling R.C.C.works and removing the stuff to a distance of 15 m lead and all lifts including stacking etc.complete as directed. | - | One Cubic Meter | - | - |
| 3 | Exvavation in all kinds of Soils & Soft murum including boulders up to 0.6 m dia.(0.113 cum) for canal,seating of embankment,filter drains / catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment as directed including cost of all materials,machinery,labour,dressing bed & sides to required level and profile etc.complete with lead up to 15 m and 6 m lift. | - | One Cubic Meter | - | - |
| 4 | Exvavation in Hard Murum including boulders up to 0.6 m dia.(0.113 cum) for canal,seating of embankment,filter drains / catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road as directed including cost of all materials,machinery,labour,dressing bed & sides to required level and profile etc.complete with lead up to 15 m and 6 m lift. | - | One Cubic Meter | - | - |
| 5 | Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and 6m lift. | - | One Cubic Meter | - | - |
| 6 | Excavation in Hard Rock all toughness including by breaker including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and 6m lift. | - | One Cubic Meter | - | - |
| 7 | Excavation in Hard Rock oh all toughness including boulders up to 0.6 m diameter (0.113 cum) for canal, cut off trench of embankment, filter drain / catch water drains and other appurtnant structures by control blasting method including control of vibration by use of delay detonators and control of fly rocks by muffling arrangements and adopting only jack hummer for drilling holes | - | One Cubic Meter | - | - |
| 8 | Dewatering by pumping out water collected with 10 to 19 H.P.Diesel & Electrical pumps incl. cost of material machniery ,labour,providing sump and all other ancillary operations whenever necessaryetc completeas directed | - | Bhp Hrs | - | - |
| 9 | Providing and laying rubble soling below foundation in layers including filling with rubble chips,murum etc.complete as directed. | - | Cum | - | - |
| 10 | Drilling 35 mm. dia. for anchoring in rock and fixing 25 mm. dia. steel anchor exclud.cost of grouting & anchor bar including flushing the hole,conveying all machinary,eqipment & necessary watering complete.. | - | Rmt | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
BOQ_2224863.xls
BOQ • 0.35 MB
B1.pdf
Tender Documents • 3.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .