| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
1 Jun 2023, 1:00 pmClosed
SE ETC I MORADABAD
220 KV S/S CAMPUS, MAJHOLA, MORADABAD
THE WORK FOR SHIFTING, ERECTION AND COMMISSIONING OF 40 MVA, 132/33 KV TRANSFORMER AT 132 LV SUB-STATION BABRALA AGAINST INCREASING CAPACITY UNDER ETD, SAMBHAL
2023_UPTCL_798074_1
E-T-02/ETCM/2023-2024
Open Tender
Electrical Works
Fixed-rate
30 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC 1 MORADABAD
₹1,500
8 Jun 2023
20 Apr 2023
1 Jun 2023
20 Apr 2023
1 Jun 2023
20 Apr 2023
Amount
The following work to be done at 132 KV S/S Babrala
Shifting of 40 MVA 132/33 KV T/F from existing place to plinth up to 20 Mtr. distance including turning to tank if required, including all T&P and work required to complete the job satisfactorily.
Complete erection of 40 MVA T/F by erection of radiators, conservator tank, all bushing, their turrets connecting all pipe line, cooling fans, motor driver mechanism of tap changer, RTCC panels, oil pumps and associated oil pipe lines etc. to complete the job satisfactory including first filing of oil the topping of transformer oil (Not circulation) in tank, radiators, oil pipe lines, conservator tank etc. and other associated works for satisfactorily completion of work. No department crane/T&P shall be provided.
Cable termination/connecting in 40 MVA Transformer Marshalling box, RTCC panel, DM panel, after ferruling and dressing and erection of new RTCC panel.
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through centrifuging machine to be provided by the contractor and taking the BDV and PPM value of the oil periodically till the required value is achieved as per direction of supervising engineer. The work includes all the work related to centrifuging the oil and filling the oil in T/F and tank (Approx. 18 KL).
Earthing of T/F body, MB DM box, OLTC, RTCC at two points using 75x10/50x6mm MS flat including painting work of M.S Flate.
Jumpering of T/F from HV with single Panther and LV side with Single zebra/Moose complete up to 33 KV main bus.
Safely carriage of 20/25 KL T/F Oil Tank to and fro form any substation under ETD Sambhal (An approx. Distance- 90 Km.) to 220 KV S/S Sambhal work including loading and unloading of same tank. (Private Vehicle, Hydra and Men & material is provided by Contactor own his cost).
DGA Testing of new instold 40 MVA T/F after 72 hrs. from energization of T/F at 132 KV S/S Babrala
R.K.ENGINEERING SERVICES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .