Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹33.7 Laccepted-aoc | ₹33.7 L | accepted-aoc |
Tender Value
₹42.6 L
EMD Value
₹85,400
Closing Date
26 Dec 2025, 9:30 pmClosed
Directorate of Municipal Administration
VIJAYAKUMAR R
Construction of nala retaining wall and providing slab in sunagar oni at ward no 56.
DMA/2025-26/BR/WORK_INDENT46329/CALL-2
DMA/2025-26/BR/WORK_INDENT46329/CALL-2
Open
Bridges/Culverts
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
8 documents required · 8 mandatory
₹1,070
₹85,400
26 Dec 2025
12 Dec 2025
22 Dec 2025
Construction of nala retaining wall and providing slab in sunagar oni at ward no 56.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour wit...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Code...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Additionalities for Formwork, Centering & Scaffolding for earth retaining Structures finished rate of Concrete per m3 10% Earth Retaining Structures
Dewatering the sewage / storm water by using reqired HP submersible pump for the diversion of storm / sewage during the execution of work. Considering for one Pump. 20 hp pump
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar...
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kankar/Moorum. (Tipper 5.5 m3)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw2- 46329.doc
Tender Document • 1.01 MB
government notification.pdf
Instructions to Tenderers • 1.75 MB
format of bankers certifiate.pdf
Instructions to Tenderers • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .