Loading…
Loading…
Tender ID
Tender Value
Refer Docs
Closing Date
25 Feb 2026, 10:00 amClosed
Dy Director NITK
NITK, SRINIVASNAGAR, SURATHKAL
Providing polycarbonate sheet roofing in open to sky area on the terrace floor and resetting of aluminium windows at Girls Hostel Block 4 SHARAVATI in NITK
2026_NITK_898154_1
Tender No.30/2025-26/HD
Open Tender
Civil Works
Works
60 days
NITK, SRINIVASNAGAR, SURATHKAL
As per Tender Doc
9 documents required · 9 mandatory
₹0
Exempted
11 Feb 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
25 Feb 2026
12 Feb 2026
Dismantling Work: Dismantling weather proof course and removing and conveying the debris to a distance to the appropriate disposal area as per direction of Engineer-in-charge.
Fixing works: Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.
Fixing works: Providing and fixing, erection of G I pipe conforming to IS 1239:1990 with latest amendments complete including cutting, welding, fixing in position with necessary bold and nuts with all lead and commissioning etc complete as per specification and directions of the Engineer-in-charge. a)Heavy Duty – GI Pipe 80mm dia for columns
Fixing works: Providing and fixing, erection of G I pipe conforming to IS 1239:1990 with latest amendments complete including cutting, welding, fixing in position with necessary bold and nuts with all lead and commissioning etc complete as per specification and directions of the Engineer-in-charge. b)Heavy Duty – GI Pipe 65mm dia for rafters
Laying works: Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (including cost of formwok M30 Design Using 20mm nominal size graded crushed coarse agreagates)
Plaster works: Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
Fixing works: Providing and fixing 4mm thick polycarbonate sheet curved roofing ( 1.22 M wide) of approved make free from scratches and fixed to the M S frame of required profile using self drilling/self tapping screws of size 10mm-5mmx50mm with necessary aluminium profile sections for edges and to join the adjacent sheets water tight (with EPDM rubber gaskets) in slope/curved surfaces including cutting the sheets to required size and shape ( excluding cost of Aluminium profile sections, MS purlins, rafters and trusses ) as per the detailed drawing and direction of the engineer in charge .
Fixing works: Providing and fixing aluminium profile sections for polycarbonate sheet joints (a set of top & bottom sections) & U sections for sheet edges. The aluminium profile sections should be of approved make, rust-free and shall be designed to fit over sheet edges or join adjacent sheets water-tight using EPDM rubber gaskets with necessary screws including cost of all materials, cutting, joining with all lead and lift, etc., completed as per the direction of the engineer in charge.
Fixing works: Providing and applying painting with External emulsion paint 2 coats over one coat primer of approved brand (Asian - Apex / Berger ,Dulex , Nippon – equivalent make ) to give an even approved shade after thoroughly brushing the surface, free from mortar drops and other foreign matter Including cost of preparing the surface even and sand paper smooth with necessary repairs to scratches in wall /sloping roof surface with putty etc at all levels and heights including cost of all materials, labour, complete as per specifications & Direction of Engineer incharge.
Painting works: Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. Two coats with one coat of primer
Painting works: Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. Two coats without primer
Resetting works: Resetting of non functioning aluminium window shutters by removing the shutters from the sliding track and resetting the shutters by replacing the damaged/non functioning fixtures like handles, locks, nylon rollers and EPDM rubber / neoprene gasket and re-fixing the shutters to the sliding tack carefuly after due repairs checking the smooth sliding of shutters including the cost of cleaning the sliding track, glass panes and fixing the frame sections firmly to the wall , lintels, beams by replacing the damaged screws and filling the gaps between the frame and wall with necessary waterproof sealent; and finishing the window side walls with necessary emulsion paintings . The work includes cost of all material, labour, necessary scaffolding, removing and refixing of existing Mosquito net etc complete as per specifications and directions of engineer a) Lower basement floor
Resetting works: Resetting of non functioning aluminium window shutters by removing the shutters from the sliding track and resetting the shutters by replacing the damaged/non functioning fixtures like handles, locks, nylon rollers and EPDM rubber / neoprene gasket and re-fixing the shutters to the sliding tack carefuly after due repairs checking the smooth sliding of shutters including the cost of cleaning the sliding track, glass panes and fixing the frame sections firmly to the wall , lintels, beams by replacing the damaged screws and filling the gaps between the frame and wall with necessary waterproof sealent; and finishing the window side walls with necessary emulsion paintings . The work includes cost of all material, labour, necessary scaffolding, removing and refixing of existing Mosquito net etc complete as per specifications and directions of engineer b) Basement floor
Resetting works: Resetting of non functioning aluminium window shutters by removing the shutters from the sliding track and resetting the shutters by replacing the damaged/non functioning fixtures like handles, locks, nylon rollers and EPDM rubber / neoprene gasket and re-fixing the shutters to the sliding tack carefuly after due repairs checking the smooth sliding of shutters including the cost of cleaning the sliding track, glass panes and fixing the frame sections firmly to the wall , lintels, beams by replacing the damaged screws and filling the gaps between the frame and wall with necessary waterproof sealent; and finishing the window side walls with necessary emulsion paintings . The work includes cost of all material, labour, necessary scaffolding, removing and refixing of existing Mosquito net etc complete as per specifications and directions of engineer c) Ground floor
Resetting works: Resetting of non functioning aluminium window shutters by removing the shutters from the sliding track and resetting the shutters by replacing the damaged/non functioning fixtures like handles, locks, nylon rollers and EPDM rubber / neoprene gasket and re-fixing the shutters to the sliding tack carefuly after due repairs checking the smooth sliding of shutters including the cost of cleaning the sliding track, glass panes and fixing the frame sections firmly to the wall , lintels, beams by replacing the damaged screws and filling the gaps between the frame and wall with necessary waterproof sealent; and finishing the window side walls with necessary emulsion paintings . The work includes cost of all material, labour, necessary scaffolding, removing and refixing of existing Mosquito net etc complete as per specifications and directions of engineer d) First floor
Resetting works: Resetting of non functioning aluminium window shutters by removing the shutters from the sliding track and resetting the shutters by replacing the damaged/non functioning fixtures like handles, locks, nylon rollers and EPDM rubber / neoprene gasket and re-fixing the shutters to the sliding tack carefuly after due repairs checking the smooth sliding of shutters including the cost of cleaning the sliding track, glass panes and fixing the frame sections firmly to the wall , lintels, beams by replacing the damaged screws and filling the gaps between the frame and wall with necessary waterproof sealent; and finishing the window side walls with necessary emulsion paintings . The work includes cost of all material, labour, necessary scaffolding, removing and refixing of existing Mosquito net etc complete as per specifications and directions of engineer e) Second floor
Resetting works: Resetting of non functioning aluminium window shutters by removing the shutters from the sliding track and resetting the shutters by replacing the damaged/non functioning fixtures like handles, locks, nylon rollers and EPDM rubber / neoprene gasket and re-fixing the shutters to the sliding tack carefuly after due repairs checking the smooth sliding of shutters including the cost of cleaning the sliding track, glass panes and fixing the frame sections firmly to the wall , lintels, beams by replacing the damaged screws and filling the gaps between the frame and wall with necessary waterproof sealent; and finishing the window side walls with necessary emulsion paintings . The work includes cost of all material, labour, necessary scaffolding, removing and refixing of existing Mosquito net etc complete as per specifications and directions of engineer f) Third floor
Providing works: Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials,labour,usage charges of machinery complete as per specifications. a) Lower basement floor
Providing works: Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials,labour,usage charges of machinery complete as per specifications b) Basement floor
Providing works: Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials,labour,usage charges of machinery complete as per specifications c) Ground floor
Providing works: Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials,labour,usage charges of machinery complete as per specificationsd) First floor
Providing works: Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials,labour,usage charges of machinery complete as per specifications e) Second floor
Providing works: Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials,labour,usage charges of machinery complete as per specifications f) Third floor
Providing works: Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. a) Lower basement floor
Providing works: Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. b) Basement floor
Providing works: Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. c) Ground floor
Providing works: Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. d) First floor
Providing works: Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. e) Second floor
Providing works: Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. f) Third floor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
tendoc30sharavati.pdf
Tender Documents • 5.78 MB
BOQ_944050.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .