Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC C1871 SAMPLA ROHTAK ROHTAK JHAJJAR HARYANA 124501 | ROHTAK | HARYANA | 124501 | 1 | Accepted-AOC AOC | |
| 2 | 2₹1.6 Cr+₹14.4 L (9.58%)Rejected-Finance BALBEHRA VILLAGE BALBEHRA TEHSIL GUHLA KAITHAL 132027 | 132027 | 2 | Rejected-Finance 2 | |
| 3 | 3₹1.7 Cr+₹17.5 L (11.7%)Rejected-Finance PLOT NO 172 22 GALI NO 09 GANDHI NAGAR GURGAON 122001 | GURGAON | GURUGRAM | HARYANA | 122001 | 3 | Rejected-Finance 3 | |
| 4 | 4₹1.8 Cr+₹25.5 L (17.0%)Rejected-Finance H NO 341 21 MUNSHI SAINI WALI GALI SHASTRI NAGAR ROHTAK | ROHTAK | HARYANA | 124001 | 4 | Rejected-Finance 4 | |
| 5 | 5₹2.1 Cr+₹64.4 L (42.9%)Rejected-Finance HOUSE NO 1310 SECTOR 4 URBAN ESTATE GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | Bharat Pumps and Projects L5 | Mukesh Kumar Contractor L2 | Fortune Enterprises L3 | Chahal Enterprise Rohtak L4 | HARSHITA ENGINEERING PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|
| 2.00Supply and erection of 9 mtr long pole, erection , supply and erection of 120 watt LED street lights at Main roads 45-46 45-52 51-52-57 53-56 44-52 51-52 45-46 gurugram university road and 51-46 road under zone 1 and 4 under limit of MCG. | ||||||||
| 3.00 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 10,750 | Metre | 170 ₹18,27,500 | 92 ₹9,89,000 Lowest | 112 ₹12,04,000 | 109 ₹11,71,750 | 110 ₹11,82,500 |
| 4.00 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 1,100 | Metre | 400 ₹4,40,000 | 321 ₹3,53,100 | 30 ₹33,000 Lowest | 385 ₹4,23,500 | 250 ₹2,75,000 |
| 5.00 | (Operation and Maintenance of 1 and 2 year free of cost) and Operation and Maintenance of 3rd year @6% of capital cost. | 1 | Each | 3,50,000 ₹3,50,000 | 8,72,183 ₹8,72,183 | 30,000 ₹30,000 | 1 ₹1 Lowest | 50,000 ₹50,000 |
| 6.00 | Supply and erection of Sword type Double Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. | 116 | Each | 3,200 ₹3,71,200 Lowest | 4,198 ₹4,86,968 | 5,120 ₹5,93,920 | 5,000 ₹5,80,000 | 5,000 ₹5,80,000 |
| 7.00 | Supply and Installation of 4 pole connector for GI (Street light) Pole including all material complete in all respect upto the entire satisfaction of engineer-in-charge. | 430 | Each | 400 ₹1,72,000 | 164 ₹70,520 | 200 ₹86,000 | 195 ₹83,850 | 150 ₹64,500 Lowest |
| 8.00 | Instatllation of Dismantled old pole including the cost of labour and transportation (store to site) required to complete the job in all respect upto the entire satisfaction of engineer-in-charge of the work. | 314 | Each | 3,000 ₹9,42,000 | 1,189 ₹3,73,346 | 1,450 ₹4,55,300 | 1,370 ₹4,30,180 | 450 ₹1,41,300 Lowest |
| 9.00 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 11 | Each | 3,000 ₹33,000 | 1,640 ₹18,040 | 2,000 ₹22,000 | 1,870 ₹20,570 | 1,000 ₹11,000 Lowest |
| 10.00 | Providing and fixing of 4G/5G Sim Card and recharse fees per month for street lights CCMS panel Compelte in all respect required for proper operation of CCMS panel. | 528 | Each | 80 ₹42,240 | 63 ₹33,264 Lowest | 77 ₹40,656 | 75 ₹39,600 | 70 ₹36,960 |
| 11.00 | Operation and Maintenance of 4th Year @ 7% of Capital Cost... | 1 | NO. | 4,50,000 ₹4,50,000 | 10,17,548 ₹10,17,548 | 50,000 ₹50,000 Lowest | 11,74,000 ₹11,74,000 | 50,000 ₹50,000 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
18 Aug 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Supply and erection of 9 mtr long pole, erection , supply and erection of 120 watt LED street lights at Main roads 45-46 45-52 51-52-57 53-56 44-52 51-52 45-46 gurugram university road and 51-46 road under zone 1 and 4 under limit of MCG.
2026_HRY_539664_1
20268556F986 F710 4AE0 8142 CCF2478EC858285ULB
Open Tender
Civil Works
Works
120 days
Gurugram
Supply and erection of 9 mtr long pole, erection , supply and erection of 120 watt LED street lights at Main roads 45-46 45-52 51-52-57 53-56 44-52 51-52 45-46 gurugram university road and 51-46 road under zone 1 and 4 under limit of MCG.
2 documents required · 2 mandatory
₹15,180
₹4.0 L
Yes
19 Oct 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Supply and erection of 9 mtr long pole, erection , supply and erection of 120 watt LED street lights at Main roads 45-46 45-52 51-52-57 53-56 44-52 51-52 45-46 gurugram university road and 51-46 road under zone 1 and 4 under limit of MCG. | - | - | - | - |
| 3 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 10,750 | Metre | - | - |
| 4 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 1,100 | Metre | - | - |
| 5 | (Operation and Maintenance of 1 and 2 year free of cost) and Operation and Maintenance of 3rd year @6% of capital cost. | 1 | Each | - | - |
| 6 | Supply and erection of Sword type Double Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. | 116 | Each | - | - |
| 7 | Supply and Installation of 4 pole connector for GI (Street light) Pole including all material complete in all respect upto the entire satisfaction of engineer-in-charge. | 430 | Each | - | - |
| 8 | Instatllation of Dismantled old pole including the cost of labour and transportation (store to site) required to complete the job in all respect upto the entire satisfaction of engineer-in-charge of the work. | 314 | Each | - | - |
| 9 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 11 | Each | - | - |
| 10 | Providing and fixing of 4G/5G Sim Card and recharse fees per month for street lights CCMS panel Compelte in all respect required for proper operation of CCMS panel. | 528 | Each | - | - |
| 11 | Operation and Maintenance of 4th Year @ 7% of Capital Cost... | 1 | NO. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_618930.xls
BOQ • 0.28 MB
AD0173993.pdf
Additional Documents • 0.99 MB
OT0173993.pdf
Other Document • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .