Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAccepted-AOC | ₹25.6 L Quoted ₹24.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹27.5 L+₹3.4 L (14.1%)Rejected-AOC 268 POIP AT POST POIP POIP BAZAR VARDHAM MALVAN 416606 | MALVAN | SINDHUDURG | MAHARASHTRA | 416606 | ₹27.5 L+₹3.4 L (14.1%) | L2 | Rejected-AOC L2 |
| 3 | L3₹27.9 L+₹3.8 L (15.7%)Rejected-AOC SINDHUDURG | SINDHUDURG | MAHARASHTRA | ₹27.9 L+₹3.8 L (15.7%) | L3 | Rejected-AOC L3 |
| 4 | L4₹28.5 L+₹4.4 L (18.4%)Rejected-AOC | ₹28.5 L+₹4.4 L (18.4%) | L4 | Rejected-AOC L4 |
| 5 | L5₹29.1 L+₹5.0 L (20.8%)Rejected-AOC | ₹29.1 L+₹5.0 L (20.8%) | L5 | Rejected-AOC L5 |
Tender Value
₹29.1 L
EMD Value
₹29,500
Closing Date
31 Mar 2026, 6:00 pmClosed
EE KHARLAND DEVELOPMENT DIVISION SINDHUDURG
EE KHARLAND DEVELOPMENT DIVISION SINDHUDURG SINDHUDURGNAGARI TAL KUDAL DIST SINDHUDURG
Emergency repair works of Kharland Scheme in Malvan Taluka. Masure New kharland scheme Tal. Malvan, Dist. Sindhudurg, Restoration of Bund from ch. 0 m. to 240 m. and ch.1650 m to ch.1710 m.
2026_CWRDK_1289926_1
KDDS/N8/SUBE/ MASURE NEW/2025-26
Open Tender
Civil Works
Percentage
365 days
MASURE TAL MALVAN
ONLY FOR UNEMPLOYED ENGINEER SUBE
3 documents required · 3 mandatory
₹2,360
₹29,500
11 Jul 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0PART A | |||||
| 1Cleaning cutting thorny shrubs, bushes, grass with 15m leads and all lifts etc. completed as directed. | |||||
| 2Excavation in all kinds of soil including boulders upto 0.6 m diameter (0.113cum)for canal,seating of embankment, filter drains /catch water drains etc.,and placing the excavated stuff neatly in dump area or for formation of service road /embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc.Complete with all lead and all lifts as directed. | |||||
| 3Providing casing embankment using selected pervious material from approved borrow areas (Private land- contractor's own material ) in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges/sides, watering, compacting each layer to density control of not less than 95% of Proctor density using vibratory compactor including cost of water etc., complete with lead upto 1km for water and all lifts as directed. | |||||
| 4Providing and constructing 200 mm thick dry laterite stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labours,hand packing/ wedging stone chips ,finishing etc complete with leads upto 1 km and lifts as directed. ( Rate for material brought from borrow area ) | |||||
| 20PART B | |||||
| 21Insurance Of the Work | |||||
| 22Royalty Charges | |||||
| 23i) Murrum (Earthwork) | |||||
| 24ii) Laterite Stone (Pitching) | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_2217641.xls
BOQ • 0.38 MB
tenderform8.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .