| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 CrAccepted-AOC GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 1 | Accepted-AOC 1 | |
| 2 | 2₹13.9 Cr+₹1.2 Cr (9.53%)Rejected-Finance NAGAR NIGAM GORAKHPUR UTTAR PRADESH | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹15.1 Cr+₹2.4 Cr (18.8%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹17.6 Cr+₹4.9 Cr (38.4%)Rejected-Finance | 4 | Rejected-Finance 4 | |
| 5 | 5₹18.3 Cr+₹5.6 Cr (44.3%)Rejected-Finance | 5 | Rejected-Finance 5 |
Tender Value
₹18.8 Cr
EMD Value
₹30 L
Closing Date
5 Apr 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of 4 Lane Pakadi-Khutaha-Paniyara on Road KMC Medical Collage Maharajganj (ODR) under Rajya Yojna Year 2024-25 in District Mahrajganj (Km 0-000 to 1-900) (With 5 Year Maintenance) Lot No 4/4
2025_CEGKP_990619_4
8230/33Com-Gkp Circle/2024 Dated 09-12-2024
Open Tender
Civil Works
Item Rate
365 days
Mahrajganj
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹30 L
24 Jun 2025
10 Jan 2025
5 Apr 2025
10 Jan 2025
5 Apr 2025
10 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs, saplings and trees. girth upto 300mm removal of stumps of trees cut earlier and disposal of unseviceble materials and stacking of serviceable material to be used of auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm in thickness. As per MoRT&H Specification & Clause No. 201, 2.03 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) | 21,375 | Sqm | - | - |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment section within all lifts and lead upto 1000m. As per MoRT&H Specification & Clause No. 301, 3.06 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) | 8,531 | Cum | - | - |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. As per MoRT&H Specification & Clause No. 305, 3.17 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) | 8,531 | Cum | - | - |
| 4 | Construction of embankment and median with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MoRT&H Specification & Clause No. 305, 3.16 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) (cartage earth) | 13,071 | Cum | - | - |
| 5 | Construction of granular sub-base by providing Close graded material, sperding in uniform layer with motor grader on prepared surface mixing by mix in place mathod with rotavator at OMC and compacting with vibratory power roller to achieve the desired density, As per MoRT&H Specification & Clause No. 401(B), 4.01 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) | 5,906 | Cum | - | - |
| 6 | Providing, laying, spreading and compacting stone aggregates from approved quarry to Wet Mix macadam specification including premixing the material with water at OMC in machanical mix plant,, carriage of mixed material by tipper to site laying in uniform layer with paver in sub basae/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, As per MoRT&H Specification & Clause No. 406, 4.14 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) | 2,570 | Cum | - | - |
| 7 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site. Laying with 1% OPC cement and 3.5% Hincole Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. As per MoRT&H Specification & Clause No. 406(A), 4.14 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) | 3,762 | Cum | - | - |
| 8 | Providing and applying tack coat with bitumen (VG-10) grade using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. (As per MORTH Specification.) As per MoRT&H Specification & Clause No. 503(i), 5.02 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & bitumen VG-10) (GST will be paid extra as applicable) | 34,200 | Sqm | - | - |
| 9 | Providing and laying bituminous concrete with higher capacity batch type 120 TPH hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.40 percent (VG-30) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction. As per MoRT&H Specification & Clause No. 507B & 5.05, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & bitumen VG-30) (GST will be paid extra as applicable) | 1,368 | Cum | - | - |
| 10 | Construction of sub-grade and erthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MoRT&H Specification & Clause No. 305, 3.18 complete in all respect as per directions of Engineer in charge. (Including Labour Cess) (GST will be paid extra as applicable) For Patri work (Cartage Earth) | 4,079 | Cum | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1749211.xls
BOQ • 0.37 MB
160511659.pdf
Tender Documents • 2.00 MB
160511660.pdf
Tender Documents • 0.81 MB
160511661.pdf
Tender Documents • 0.49 MB
160511662.pdf
Tender Documents • 0.12 MB
160511664.html
Tender Documents • 0.06 MB
160800551.htm
Tender Documents • 0.00 MB
161253831.pdf
Tender Documents • 0.18 MB
162404403.pdf
Tender Documents • 0.34 MB
163242368.pdf
Tender Documents • 0.49 MB
164076237.pdf
Tender Documents • 0.49 MB
164843309.pdf
Tender Documents • 0.51 MB
166161183.pdf
Tender Documents • 0.48 MB
166498304.pdf
Tender Documents • 0.48 MB
166929662.pdf
Tender Documents • 0.48 MB
Addendum_SBD_Lot_4.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .