| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate. | |
| 2 | L2₹4.9 L+₹4,293.53 (0.88%)Rejected-Finance | L2 | Rejected-Finance Higher Rate. | |
| 3 | L3₹5.0 L+₹8,037.88 (1.64%)Rejected-Finance | L3 | Rejected-Finance Higher Rate. | |
| 4 | L4₹5.0 L+₹11,582.53 (2.36%)Rejected-Finance 2 102A SREE COLONY KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | L4 | Rejected-Finance Higher Rate. | |
| 5 | L5₹5.0 L+₹13,779.22 (2.81%)Rejected-Finance | L5 | Rejected-Finance Higher Rate. |
Tender Value
₹5.0 L
EMD Value
₹9,985
Closing Date
1 Jul 2026, 2:00 pmClosed
Assistant Engineer,PWD,SSKM(H)Sub- Division.
244 AJC Bose Road, Kolkata-700020
IPGMER-SSKM Hospital-Emergent repair of balcony shed at Main block open corridor during the year 2026-27.
2026_WBPWD_5015801_15
WBPWD/AE/SSKMHSD/NIT-04e/26-27
Open Tender
CIVIL WORKS
Percentage
21 days
Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,985
Yes
7 Oct 2026
19 Jun 2026
3 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting holes and subsequent mending good damages.
(a) Diameter upto 150 mm.
In brick work [Cement-4.0 Kg/Mtr] | - | Mtr | 111 | - |
| 2 | M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.
For trusses spanning up to 12.00 m | - | MT | 72,951 | - |
| 3 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
Pakur Variety
Ground Floor | - | Cum | 5,772.3 | - |
| 4 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work).
In Roof:-
With 0.5 mm thick sheet | 1 | Sqm | 787 | ₹786.21 |
| 5 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. | - | Sqm | 29 | - |
| 6 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
With super gloss (higloss)
On steel or other metal surface :
Two coats (white any shade except White) | - | Sqm | 79 | - |
| 7 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | 2.4 | Cum | 166 | ₹398.4 |
| 8 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992
Single Socketed 3 Meter Length.
160 mm | 67.2 | mtr | 546 | ₹36,691.2 |
| 8.01 | Bend 87.5º
160 mm | 10 | Each | 338 | ₹3,380 |
| 9 | Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials, cutting pipes, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps (any floor) or for underground work including cutting trenches upto
1.5 metre and refilling the same complete as per direction of the Engineer- in-charge. (Payment will be made on centre line measurement of the total pipeline including specials.
Above ground
160 mm dia. | 67.2 | mtr | 66 | ₹4,435.2 |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 1.88 MB
BOQ_5084798.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .