Loading…
Loading…
Tender Value
Refer Docs
Closing Date
28 Feb 2024, 5:30 pmClosed
Prem Kumar
Jammu Depot, Bharat Petroleum Corporation Limited
15531
1000415597
Limited Tender
Works
Jammu Depot
29 Feb 2024
23 Feb 2024
28 Feb 2024
23 Feb 2024
28 Feb 2024
23 Feb 2024
23 Feb 2024 - 28 Feb 2024
Item Item Unit of Delivery Period (In
Number Item Title Item Description Quantity Measure number of days)
Heavy Scrapping and surface preparation upto SSPC
SP2 or St.3.(External surface of Pipe Line as specified).
Mechanical Cleaning manually shall be done by brass
PL MAN SCRAP B-BRSH (surface preparation wire brush, emery/sand papers etc as instructed by
including roof, shell, structures and Engineer-in-charge. Removing oil, dust, grease,mill
foam/sprinkler line) scale and moisture and making the surface dry including
all materials,consumables,labour; scaffolding;
equipments etc. complete.
Rate shall be paid in M2 basis of the scrapped surface
BPCL standards including all labour; double scaffolding;
equipments etc. complete.
DOUBLE SCAFFOLDING
2 Unit to be read as M2. 2500 SQM
One coat of inorganic zinc silicate at 65 micron and one
tie coat epoxy coating of 30 micron on existing
SILICATE+TIE WO SCAF . HB MIO WO SCAF
scaffolding. Followed by One coat of epoxy high build
and ACRYLIC PU WO SCAF ( roof and shell
micaceous iron oxide at 125 microns on existing
scaffolding. Finish paint -Two coats of acrylic aliphatic
polyurethane at 30 microns/coat on existing scaffolding.
Supplying and applying primer on the prepared surface
including all labour; scaffolding; consumables;
equipments; primer etc. complete as per specifications
(primer shall be applied within 8 hours of surface
PL WASH RPIMER. ZN PHOSPHATE WO
preparation). Paint shall be as per attached list of BPCL
SCAF. PL FINISH PU 2C (( fire water line and
recommended manufacturers. One coat of wash primer
foam line painting))
at 10 microns. Followed by Two coats of Epoxy Zinc
Phosphate Primer at 35 microns/coat. Finish Coat : Two
coats of acrylic aliphatic polyurethane at
4 microns/coat in SQM
One Coat of Epoxy Zinc Phosphate primer min
microns. Two coats of Glass Flake Epoxy with Phenalka
structures painting railings, walkway staircase
mine Hardener- min DFT 200 microns per coat (Total
min DFT 400 microns). Final coat-One Coat of Aliphatic
Acrylic Polyurethane . Min DFT 65 micron
Supply and painting the following details on the tanks in
black enamel paint : tank number,name of the
product,Tank capacity,size of the tank,safe filling
height,date of painting,date of commisioning,date of
calibration,date of hydrotesting,due date of cleaning etc
Painting as per standard colour scheme in letters of
following height and as per the instructions of site
engineer.Payment shall be made on each letter for the
following size given below
TANK LETTERING 50MM 200 EA
TANK LETTERING 80MM 400 EA
TANK LETTERING 100MM 400 EA
TANK LETTERING 150MM 120 EA
Logo painting 4 EA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
15531.pdf
pdf • 0.16 MB
BUDGETDOC_15531.pdf
pdf • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .