| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance 44 HEM CHANDRA NASKA R ROAD CAL 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | +0.00% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 LAdmitted-Finance | +1.10% | ₹2.8 L | L2 | Admitted-Finance |
| 3 | L3₹2.8 LAdmitted-Finance 250 1 A P C ROAD KOLKATA 700006 | KOLKATA | KOLKATA | WEST BENGAL | 700006 | +1.30% | ₹2.8 L | L3 | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹5,530
Closing Date
16 Mar 2026, 1:00 pmClosed
EE-WS(W)
KMC, 212, Rashbehari Avenue, Kolkata -700019
M.S. JACKETING AT THE DAMAGED PORTION OF EXISTING 900 MM DIA C.I. FILTERED WATER DADICATED MAIN NEAR 16/1A K N SEN ROAD IN WD NO 67.
2026_KMC_1013542_1
KMC/WS/PG_67/T-54/25-26
Open Tender
CIVIL WORKS
12 days
MAIN NEAR 16/1A K N SEN ROAD IN WD NO 67.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,530
Yes
20 May 2026
24 Feb 2026
19 Mar 2026
24 Feb 2026
16 Mar 2026
25 Feb 2026
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.27Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For minimum engagement of 8 hrs. In a day
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.27Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For beyond 8hrs. of working
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto3,000 mm. but not requiring shoring
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m.
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(b) For additional depth beyond 1.5 m. and upto 3.00 m
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(c) For additional depth beyond 3.00 m.
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.8 Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptusor other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately. a) 75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart (ii) Railing with 3 rows.
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]
CHAPTER - VIII SUPPLYING OF MATERIALS sF. MS FLANGE 8.17 Supply of M.S. Flange (slipper type) as per IS-6392 TABLE 17 Thickness 12mm NB Diameter in mm 150
CHAPTER - VIII SUPPLYING OF MATERIALS E. E. R. W. MS BLACK PIPE 8.15 Sypply of E.R.W.M.S. (Electrical Resistant Welded M.S.) black pipe of ISI Mark as per relevent IS Specification ( heavy quality ) having wall thickness not less than 5 mm. [N.B.: The rates for supply of TATA Make pipe will be arrived at by adding 20% of the corresponding rates ] Diameter in mm (Internal)150
M.S. PLATE
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3.7Supplying and fabricating 20 mm to 32mm thick (finished thickness) M.S flange. properly ribbed, one face machined, including drilling holes as perstandard table, fitting and fixing the same with M.S. pipe by electric arc welding as per relevant I.S. specification using standard electrodes and direction of the Engineer-in-Charge. [ The Engineer-in-Charge shall approve the electrodes for arc welding before use] 900mm dia
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3 M.S. Pipes 2.3.1 Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. Thikness in mm 5mm to 8mm thick plate
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3.9 LowerIng M.S pipes & specials in trench up to a depth of 3.00 metre below G.L, laying and jointing the same inside the trench / over ground by means of electric arc welding using standard electrodes as per l.S. specification, all complete as per direction of the Engineer-in-Charge. [The Engineer-in-Charge shall approve the electrodes for arc welding before use. (For laying over ground. the rates shall be reduced by 10% and that is inclusive of holding arrangements) ] 900mm
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials.2.3.3 Field welding of M.S. plate by means of electric arc welding as per relevent IS specification using standard electrodes including edge preparation and charges of deployment of electric generator set with fuel, lubricant, and allother tools and plants all complete as per specification and direction of Engineer-in-Charge.[Engineer-in-Charge shall approve the electrodes for arc welding before use ]Throat thickness in mm 12mm
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 5. Controlled Cement concrete with well graded stone chips (20 mm graded nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 20 Grade (i) Pakur Variety
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.3 Filling in foundation or plinth by silver sand in layers not exceeding 150 mmas directed and consolidating the same by thorough saturation with water,ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) B) Do - by fine sand
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 3. Supplying and laying brick Khoa of ordinary bats of size (38 mmx 63 mm)of approved quality in 100 mm layer (loose) filling in gaps with small ones rammed and compact as directed true to level and grade.
CHAPTER - VII MISCELLANEOUS ITEMS Application of two coats of Epoxy primer as per BS 5493 by brush on the cleaned dry concrete surface with epoxy resin primer with reactive suitable hardener mixture as per specification and direction of EIC all complete. [This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.18 Removal of rubbish, earth etc. from the working site and disposal of thesame beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning thesite in all respect as per direction of Engineer in charge.
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2489446.xls
BOQ • 0.33 MB
tbid.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid