Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-Finance | L1 | Accepted-Finance L1 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
3 Aug 2026, 6:00 pmClosed
Administrator
GRAM PANCHAYAT HANUMANNAGAR
Construction of Wall at Samshan bhumi38 DODD1 AD
2026_PRD_576269_1
811 DATE 19-07-2026 GP HANUMANNAGAR
Open Tender
Civil Works
Percentage
120 days
GP HANUMANNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MD RISL
₹30,000
Yes
5 Aug 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation including disposal of excavated carth up to 50 Mtr. and lift up to 1.5Mtr disposed soil to be levelled and neatly dressed All kinds of soil. #2® | 134.68 | Cum | 143.92 | ₹19,383.22 |
| 2 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of I cement: 4 sand: 8 ballast and cutting, including lowland. 9A | 32.85 | Cum | 3,416.34 | ₹1,12,226.77 |
| 3 | Foundation and chair first class brick masonry cement -gravel in 1:6 spices, including bunding and lowland. (1 cement 6 coarse sand): 20(a) | 84.95 | Cum | 4,686.84 | ₹3,98,130.65 |
| 4 | Super structure first class brick masonry cement - gravel in 1:6 spices, including bunding and lowland. (1 cement: 6 coarse sand): 20(a)&22 | 139.11 | Cum | 4,935.45 | ₹6,86,559.34 |
| 5 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finislı: 20 mm think. 778 | 1,259.7 | Sqm | 172.46 | ₹2,17,248.07 |
| 6 | The function of color whitening is done in 3 layers so that there is a similar aura (to give even shade) on the new work/old work. 81 A | 1,259.7 | Sqm | 29.81 | ₹37,551.69 |
| 7 | The function of iron in the grill/gate etc., including cutting, plating and applying flat corneas, I and chainls etc. 63 | 200 | Kg | 116.9 | ₹23,380 |
| 8 | Coating the prize panel into 3 layers so that there is a single aura (to give even shade) to create an even surface on the new task/ old work. 82 A | 19.16 | Sqm | 131.54 | ₹2,520.25 |
| 9 | Name of Board | 1 | No | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
NIT01DOC.pdf
Tender Documents • 1.86 MB
BOQ_1024559.xls
BOQ • 0.23 MB
CorrHanumannagar.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .