Tender Value
₹1.4 Cr
EMD Value
₹4.2 L
Closing Date
31 Aug 2026, 6:00 pm7d left
SM (E-C), AAI
Gaya Ji Airport, Gaya
Refurbishment and Painting of Boundary Wall (Operational and Non-operational) at Gaya Ji Airport
2026_AAI_287065_1
AAI/GY/SM(C)/B-WALL/2026-27
Open Tender
Civil Works
Item Rate
120 days
Gaya Ji Airport
As per NIT
2 documents required · 2 mandatory
₹1,180
₹4.2 L
10 Aug 2026
10 Aug 2026
2 Sept 2026
10 Aug 2026
31 Aug 2026
10 Aug 2026
10 Aug 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 180 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 95 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 18 | Cum | - | - |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 56 | Sqm | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,600 | Kg | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,400 | Kg | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 56 | Sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 258 | Sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for
Columns, Pillars, Piers, Abutments, Posts and Struts | 296 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.78 MB
Binder1.pdf
Tender Documents • 6.77 MB
BOQ_334968.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].