| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹19.1 LAccepted-AOC | ₹19.1 L | 1st | Accepted-AOC Win in Lottery |
| 2 | 2nd₹20.3 L+₹1.2 L (6.14%)Rejected-AOC | ₹20.3 L+₹1.2 L (6.14%) | 2nd | Rejected-AOC Reject due to 2nd lowest |
| 3 | 3rd₹20.8 L+₹1.7 L (8.77%)Rejected-AOC | ₹20.8 L+₹1.7 L (8.77%) | 3rd | Rejected-AOC Reject due to 3rd lowest |
| 4 | 3rd₹20.8 L+₹1.7 L (8.77%)Rejected-AOC KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | ₹20.8 L+₹1.7 L (8.77%) | 3rd | Rejected-AOC Reject in Lottery |
| 5 | 4th₹22.0 L+₹2.9 L (14.9%)Rejected-AOC | ₹22.0 L+₹2.9 L (14.9%) | 4th | Rejected-AOC Reject due to 4th lowest |
Tender Value
₹33.6 L
EMD Value
₹33,600
Closing Date
30 Mar 2026, 4:00 pmClosed
SE R and B Division No I Berhampur
SE R and B Division No I Berhampur
Annual repair of Poly-technic Engineering School Ladies Hostel such as providing Grading,Tarfelt,Floor tile,Gypsum board ceiling,painting other work etc.at Govt.Polytechnic Berhampur
2026_EICCL_127567_5
SE R and B Divn NoI Bam 69 /2025-26
Open Tender
Civil Works - Buildings
Percentage
365 days
Berhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹33,600
Yes
29 Aug 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
24 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. | - | Square Meters | - | - |
| 2Removing old tarfelt from roof slab, cleaning the surface, lowering and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. | |||||
| 3Dismentalling A.C.C/ G.C.I sheet roofing after carefully removing the nuts including stacking the materials for re-use and removing the debris with in 50m lead, including cost of all labour with T&P etc. complete. | |||||
| 4R.C.C. work of proportion M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position etc complete as per direction of Engineer-in-Charge COVER SLAB | |||||
| 5Cement concrete of proportion (1:2:4) in F&F using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect | |||||
| 6Providing 6 mm thick cement plaster with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to R.C.C. work after closed deep chipping & slurry treatment including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. | |||||
| 7Providing, fitting, fixing up partition walling OEL aluminium anodized section No. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip for fixing up ACP Board and Glass and jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. | |||||
| 8Providing, fitting, fixing of Aluminium. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member & 6mm plain glass in top portion with 12mm thick pre laminated board in bottom portion fixed on door frame by means of apered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. | |||||
| 9Suplying fitting, fixing up window ( Sliding type ) made up aluminium section 9778 as windows frame section No. 4096, 9777 and 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. G.F | |||||
| 10Suplying fitting, fixing up window ( Sliding type ) made up aluminium section 9778 as windows frame section No. 4096, 9777 and 3994 as shutter frame with 6mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. F.F | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586218.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
5.pdf
Tender Documents • 1.21 MB
BOQ_586218.xls
BOQ • 3.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .