| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.2 LAdmitted-Finance | -28.99% | ₹63.2 L | L1 | Admitted-Finance |
| 2 | L2₹63.3 LAdmitted-Finance | -28.88% | ₹63.3 L | L2 | Admitted-Finance |
| 3 | L3₹65.0 LAdmitted-Finance | -26.99% | ₹65.0 L | L3 | Admitted-Finance |
| 4 | L4₹65.1 LAdmitted-Finance | -26.91% | ₹65.1 L | L4 | Admitted-Finance |
| 5 | L5₹65.9 LAdmitted-Finance | -25.96% | ₹65.9 L | L5 | Admitted-Finance |
Tender Value
₹89.1 L
EMD Value
₹1.8 L
Closing Date
4 May 2026, 6:00 pmClosed
Commissioner
Municipal Council Sikar
Construction of Gate and approach road at Sundar nagar in Nani Beed Sikar.
2026_DLB_551755_6
2026-27ENIB04
Open Tender
Civil Works
120 days
Municipal Council Sikar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Commissioner, MDRISL
₹1.8 L
Yes
15 May 2026
14 Apr 2026
5 May 2026
14 Apr 2026
4 May 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Construction of Gate ad approch Road at Sundarnagar Dam in Nani Beed in Sikar | ||||||
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | - | p.cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size) | - | p.cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size) | - | p.cum | 5,510 | - | BI01010001010000000000000515BI0100001115 |
| 4.01 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | - | p.sqm | 236.5 | - | BI01010001010000000000000515BI0100001116 |
| 5.01 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 378 | p.cum | 6,340 | ₹23,96,520 | BI01010001010000000000000515BI0100001117 |
| 6.01 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding alcomplete.Hot rolled deformed bars. | 12,500 | p.kg | 83.3 | ₹10,41,250 | BI01010001010000000000000515BI0100001118 |
| 7.01 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 4,200 | p.kg | 144.5 | ₹6,06,900 | BI01010001010000000000000515BI0100001119 |
| 8.01 | Providing & Fixing in position, MS fabrication work using angles, sqr tubes, c channels etc for various partition frame as per Design & Instructions & Complete in all aspects . including all materials labour, finishing etc complete 265 No Kg 114.50 | 4,900 | p.kg | 114.5 | ₹5,61,050 | BI01010001010000000000000515BI0100001120 |
| 9.01 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 37.13 | P CUM | 4,860 | ₹1,80,427.5 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Tbid.pdf
Tender Documents • 1.60 MB
BOQ_983407.xls
BOQ • 0.34 MB
Userguide.pdf
Tender Documents • 3.59 MB
Ub.pdf
Tender Documents • 0.33 MB
06.pdf
Tender Documents • 2.00 MB
Download all tender documents and submit your bid