Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance 3 238 VENKATESA LAYOUT S V MILLS POST UDUMALPET 642 128 | UDUMALPET | TIRUPPUR | TAMIL NADU | 642128 | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.7 Cr+₹10.0 L (2.75%)Admitted-Finance NO 103 KAMARAJ NAGAR 1ST STREET BHAVANI 638301 ERODE DT | BHAVANI | ERODE | TAMIL NADU | 638301 | ₹3.7 Cr+₹10.0 L (2.75%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 Cr+₹18.3 L (5.03%)Admitted-Finance | ₹3.8 Cr+₹18.3 L (5.03%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹39.3 L (10.8%)Admitted-Finance 4 132 M OLAIPATTY MANATHAL PO SALEM TAMIL NADU 636503 | SALEM | SALEM | TAMIL NADU | 636503 | ₹4.0 Cr+₹39.3 L (10.8%) | L4 | Admitted-Finance |
| 5 | L5₹5.2 Cr+₹1.6 Cr (44.2%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹5.2 Cr+₹1.6 Cr (44.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | mk constructions L2 | M/s.Vetri constructions L4 | ARAVIND ASSOCIATES L3 | vasanthaconstructions L1 | K DHINAKARAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Yard works | ||||||||
| 1.01 | Earth work excavation in hard gravelly soil. Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. | 3,184 | M3 | 255 ₹8,11,920 | 163 ₹5,18,992 Lowest | 199.85 ₹6,36,322.4 | 200 ₹6,36,800 | 300 ₹9,55,200 |
| 2.00 | Earth work excavation for foundation in Removing Hard Rock by wedging, chiseling and trimming to proper shape and stocking for measurement, as per standard specification complete. | 168 | M3 | 3,100 ₹5,20,800 | 1,500 ₹2,52,000 | 499.8 ₹83,966.4 Lowest | 3,000 ₹5,04,000 | 960 ₹1,61,280 |
| 3.00 | Plain cement concrete 1:3:6, using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 293 | M3 | 4,500 ₹13,18,500 Lowest | 5,200 ₹15,23,600 | 4,500 ₹13,18,500 Lowest | 5,000 ₹14,65,000 | 6,000 ₹17,58,000 |
| 4.00 | Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 12 to 20 mm HBG machine crushed metal for Raft concrete without form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) | 582 | M3 | 5,500 ₹32,01,000 Lowest | 8,400 ₹48,88,800 | 7,499.5 ₹43,64,709 | 7,200 ₹41,90,400 | 7,500 ₹43,65,000 |
| 5.00 | Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 12 to 20 mm HBG machine crushed metal for cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. (but excluding cost of steel reinforcement) | 502 | M3 | 9,000 ₹45,18,000 Lowest | 15,000 ₹75,30,000 | 12,499.75 ₹62,74,874.5 | 12,000 ₹60,24,000 | 10,000 ₹50,20,000 |
| 6.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 75 mm thickness in RCC 1:11/2:3, using 12 to 20mm HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing, transporting charges, placing on cable duct etc., complete complying with standard specification and as directed by the TANTRANSCO Engineer. | 58 | M3 | 9,000 ₹5,22,000 Lowest | 15,000 ₹8,70,000 | 11,999.68 ₹6,95,981.44 | 10,000 ₹5,80,000 | 12,000 ₹6,96,000 |
| 7.00 | Providing steel reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete | 91.5 | MT | 70,000 ₹64,05,000 | 75,000 ₹68,62,500 | 84,999.95 ₹77,77,495.43 | 68,000 ₹62,22,000 | 63,000 ₹57,64,500 Lowest |
| 8.00 | Supplying and fixing of GI/MS angle to required length and fixing keeping in required alignment and level for cable duct including cost of material and Labour lead, lift, etc., complete, as per standard specification. | 21,325 | kg | 65 ₹13,86,125 | 60 ₹12,79,500 | 59.95 ₹12,78,433.75 Lowest | 60 ₹12,79,500 | 80 ₹17,06,000 |
| 9.00 | Brick work in C.M. 1:5, using class II ground moulded chamber burnt bricks including, cost of cement, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete | 830 | m3 | 8,300 ₹68,89,000 | 7,000 ₹58,10,000 | 6,900 ₹57,27,000 | 6,200 ₹51,46,000 Lowest | 7,000 ₹58,10,000 |
Tender Value
₹4.3 Cr
EMD Value
₹4.3 L
Closing Date
20 Dec 2022, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Providing cable duct and Drainage arrangements for the proposed Kalivelampatty 230 KV SS
2022_EB_265896_1
CE/TP-II/TRY/C-34/22-23
Open Tender
Civil Works
Works
150 days
Kalivelampatty
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹4.3 L
Yes
2 Jan 2023
19 Nov 2022
21 Dec 2022
19 Nov 2022
20 Dec 2022
19 Nov 2022
Amount
Yard works
Earth work excavation in hard gravelly soil. Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification.
Earth work excavation for foundation in Removing Hard Rock by wedging, chiseling and trimming to proper shape and stocking for measurement, as per standard specification complete.
Plain cement concrete 1:3:6, using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 12 to 20 mm HBG machine crushed metal for Raft concrete without form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement)
Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 12 to 20 mm HBG machine crushed metal for cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. (but excluding cost of steel reinforcement)
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 75 mm thickness in RCC 1:11/2:3, using 12 to 20mm HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing, transporting charges, placing on cable duct etc., complete complying with standard specification and as directed by the TANTRANSCO Engineer.
Providing steel reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete
Supplying and fixing of GI/MS angle to required length and fixing keeping in required alignment and level for cable duct including cost of material and Labour lead, lift, etc., complete, as per standard specification.
Brick work in C.M. 1:5, using class II ground moulded chamber burnt bricks including, cost of cement, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete
Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Disposal of excess soil then and there away in low lying area with a lead of 1km distance including cost of loading, transporting, spreading and levelling labour, lead, lift as directed TANTRANSCO Engineer at site complete.
Refilling with excavaed earth other than Sand in foundation and Consolidation as per standard specification with water including all labour,lead,lift,etc,complete
Painting two coats of plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
mk constructions
ARAVIND ASSOCIATES
M/s.Vetri constructions
K DHINAKARAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_315172.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .