Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.8 L+₹878 (0.23%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S. MUTHU L1 | WILSON ANANTHA RAJ L2 |
|---|---|---|---|---|---|
| 1.00Maintenance of Storm water drain | |||||
| 1.01 | Earth cutting and sectioning and levellingincluding initial lead of 10m and initial llift of 2m in sand silt or other loose soil wet sand or silt not under water light black cotton soil sndy loam and ordinary soil including excavated earth etc. complete (TNBP No.20B) | 17 | m3 | 87 ₹1,479 Lowest | 90 ₹1,530 |
| 1.02 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B) | 57 | m3 | 110 ₹6,270 Lowest | 112 ₹6,384 |
| 1.03 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 25 | m3 | 5,710 ₹1,42,750 Lowest | 5,714 ₹1,42,850 |
| 1.04 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 113 | m2 | 493 ₹55,709 Lowest | 496 ₹56,048 |
| 1.05 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 22 | m3 | 6,633 ₹1,45,926 Lowest | 6,638 ₹1,46,036 |
| 1.06 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 41 | m2 | 598 ₹24,518 Lowest | 602 ₹24,682 |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
14 Oct 2025, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Maintenance of Storm water drain at Nesamony Nagar and Providing Cement Concrete Road at Pattu Street in Ward no.21
2025_MAWS_611297_1
267/2025-26/AEE
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Maintenance of Storm water
Registered Contractor
4 documents required · 4 mandatory
₹0
₹4,500
17 Oct 2025
4 Oct 2025
14 Oct 2025
4 Oct 2025
14 Oct 2025
4 Oct 2025
Amount
Maintenance of Storm water drain
Earth cutting and sectioning and levellingincluding initial lead of 10m and initial llift of 2m in sand silt or other loose soil wet sand or silt not under water light black cotton soil sndy loam and ordinary soil including excavated earth etc. complete (TNBP No.20B)
Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B)
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
WILSON ANANTHA RAJ (BID ID -1484971)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .