Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC 86 TOLLYGUNGE CIRCULAR ROAD KOLKATA WEST BENGAL 700053 | KOLKATA | KOLKATA | WEST BENGAL | 700053 | L1 | Accepted-AOC AOC issued | |
| 2 | L2₹3.1 L+₹22,800 (7.90%)Rejected-Finance F IA 24 4210 CO JAYKRISHNAPUR P O BEGAMPUR DIST HOOGHLY | BEGAMPUR | HOOGHLY | WEST BENGAL | L2 | Rejected-Finance That the Bid is not L1 | |
| 3 | L3₹3.2 L+₹27,086 (9.38%)Rejected-Finance 33 PEMANTLE STREET KOLKATA 700016 | KOLKATA | KOLKATA | WEST BENGAL | 700016 | L3 | Rejected-Finance That the Bid is not L1 | |
| 4 | L4₹3.2 L+₹36,050 (12.5%)Rejected-Finance | L4 | Rejected-Finance That the Bid is not L1 | |
| 5 | L5₹3.8 L+₹89,550 (31.0%)Rejected-Finance 10B DR LAHIT BANERJEE SARANI GROUND FLOOR KOLKATA 700 073 | KOLKATA | KOLKATA | WEST BENGAL | 700073 | L5 | Rejected-Finance That the Bid is not L1 |
| Sl No | Description | Qty | Unit | Lyric International L1 | CARRION AIR COOLING L5 | MILLENNIUM AIRCON L3 | M.S. COOLING & ENGINEERING CO. L4 | P. M. COOLING AND ENGINEERING CO L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling of existing damaged AC machine and deposited to the section store by co's own tools and tackles as per deirection of EIC. | 1 | Set | 11,500 ₹11,500 | 10,000 ₹10,000 | 8,286 ₹8,286 | 3,500 ₹3,500 | 3,000 ₹3,000 Lowest |
| 2.00 | Supply Installation Testing & Commissioning of Microprocessor based air cooled 8.5TR. Ceiling Suspended Ductable type Split Air Conditioner with R-410A Gas, having nominal cooling capacity of 102000 BTU/Hr. With multiple scroll compressor, condenser make as per OEM standard, Noise Level 51 dBA, Cfm 3400, suitable for operation on 415 Volt. +/- 550 HZ, - 3Ph. AC supply.(Make :- Hitachi Toushi Pro Series - Scroll, model no-- PAG102SSHDDA3Z1/Voltas/Blue Star) Installation the Indoor unit after supply 4 nos. 50mm. x 50mm x 305 mm. Iron angel, making 3 nos. 12mm. hole & 10 mm. hole of each angel, fixing the angel on roof by best quality booklets and hanging with full threaded 10 mm. stick with necessary nut & washer, carrying the outdoor units on Stuckure/roof top by well trended potter, fabrication & fixing of 2 nos. MS U Channel of 6mm. Thick of size (75mmx40mmx40mm) & fabricated by 1" Angel for installation of outdoor unit of Ductable Split & painting the same, installed on the iron structure by necessary materials, after Installation, Commissioning the units & pipe line testing the leack on high pressure testing up to 500 psi by Nitrogen gas and double stage vacuuming indoor unit and pipe line at least -50 psi, before release the refrigerant gas. | 1 | Item | 2,45,000 ₹2,45,000 Lowest | 3,24,500 ₹3,24,500 | 2,57,000 ₹2,57,000 | 2,78,000 ₹2,78,000 | 2,65,000 ₹2,65,000 |
| 3.00 | SITC of Suitable Capacity Drier as per Direction of EIC. | 1 | Set | 6,500 ₹6,500 | 4,500 ₹4,500 | 2,500 ₹2,500 Lowest | 2,850 ₹2,850 | 2,500 ₹2,500 Lowest |
| 4.00 | Supply & Charging R-410A/R32 (As per company gas charge for 7.5 mtrs. Length so for Additional pipe line) | 10 | Kg | 600 ₹6,000 | 1 ₹10 Lowest | 100 ₹1,000 | 980 ₹9,800 | 950 ₹9,500 |
| 5.00 | SITC of Copper Refrigeration pipe line for Liquid Line hard drawn Cu piping (1 1/8" OD with 0.6 mm thick) & Copper Refrigeration pipe line for Suction Line hard drawn Cu piping (5/8" OD with 0.7 mm thick) with necy supports & brackets as per direction of EIC. | 20 | Rmt | 950 ₹19,000 Lowest | 1,950 ₹39,000 | 2,200 ₹44,000 | 1,380 ₹27,600 | 1,450 ₹29,000 |
| 6.00 | Supply & Fixing of Nitrile Rubber tube insulation (make : Twiga) of 9 mm thick on Suction & Liquid Line Copper Pipe. | 20 | Rmt | 35 ₹700 | 12 ₹240 Lowest | 150 ₹3,000 | 150 ₹3,000 | 125 ₹2,500 |
| 7.00Special Terms and Conditions 1. It is stated that the above work place is existing COVID Hospital, In case of any mishap or accidental to any staff that deputed by the agency the whole responsibility is to be borne by the concern agency. 2. The Agency shall be responsible for provisioning of all COVID safety measures including regular sanitiziation of work places, vaccination of employees and compliance of stated directive and COVID appropriate norms. 3. All the issues related to the safety of the staffs should be taken care by the agency itself. (Defect Libilities period for 01 year from the date of completion of work) (Rate should be quotated including all taxes and duties) | ||||||||
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
2 Sept 2025, 1:00 pmClosed
Assistant Engineer, KMC Electrical Sub-Division
Kolkata Medical College Electrical Sub-Division, P.W.Dte.Green Building, MCH Campus 88, College Street, Kolkata-700073.
Replacement of one no 8.5 TR Ductable Split type Air conditioning machine installed at CCU under School of Tropical Medicine, Kolkata.
2025_WBPWD_886140_1
WBPWD/AE/KMCESD/NIQ-58/25-26
Open Tender
A/C ORG
Item Rate
15 days
Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,500
8 Sept 2026
1 Aug 2025
4 Sept 2025
7 Aug 2025
2 Sept 2025
7 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .