Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹15.3 L+₹18,200 (1.20%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.5 L+₹36,250 (2.39%)Rejected-Finance VILL 81 LAJPAT NAGAR DIST MATHURA | MATHURA | UTTAR PRADESH | 209402 | L3 | Rejected-Finance L3 | |
| 4 | L4₹17.0 L+₹1.8 L (11.9%)Rejected-Finance 255T SMARAT ASHOK NAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S TANVI CONSTRUCTION L3 | M/S CHANDRAPAL SINGH L4 | M/S YAMUNA EARTH MOVERS L1 | M/s CHANCHAL ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting Junds And Moonj with Disposal away from site | 1,000 | M2 | 30 ₹30,000 | 31.54 ₹31,540 | 28 ₹28,000 | 21.45 ₹21,450 Lowest |
| 2.00 | Earth work in silt clearance including lift upto 1.50 m and lead upto 6.0 m by machines with rough /partial dressing.The Earth from clearance to be used in side embankment or to be disposed off on spoil bak or as directed by Engineer-in-Charge (by mechenical means -poklin) | 25,000 | M3 | 35 ₹8,75,000 | 37.85 ₹9,46,250 | 33.63 ₹8,40,750 Lowest | 37.5 ₹9,37,500 |
| 3.00 | Scrapping internal section of existing channel i.e. Bed & Slope with silt up to 5 cm.per sqm | 1,80,000 | M2 | 3.6 ₹6,48,000 | 4 ₹7,20,000 | 3.6 ₹6,48,000 | 3.2 ₹5,76,000 Lowest |
Tender Value
₹18.9 L
EMD Value
₹38,000
Closing Date
19 Sept 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance of Sadabad dy From Km 0.000 to 46.300 For the Year 2026-27
2026_UPIDC_1182854_32
04 EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
Item Rate
20 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,194
₹38,000
29 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Junds And Moonj with Disposal away from site | 1,000 | M2 | - | - |
| 2 | Earth work in silt clearance including lift upto 1.50 m and lead upto 6.0 m by machines with rough /partial dressing.The Earth from clearance to be used in side embankment or to be disposed off on spoil bak or as directed by Engineer-in-Charge (by mechenical means -poklin) | 25,000 | M3 | - | - |
| 3 | Scrapping internal section of existing channel i.e. Bed & Slope with silt up to 5 cm.per sqm | 1,80,000 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2225534.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .