Loading…
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ADMITTED FOR TECHNICAL EVALUATION |
| 2 | Accepted-Technical SAKRAUR MARCHAUR GONDA | GONDA | GONDA | UTTAR PRADESH | Accepted-Technical ADMITTED FOR TECHNICAL EVALUATION |
| 3 | Accepted-Technical | Accepted-Technical ADMITTED FOR TECHNICAL EVALUATION |
| 4 | Accepted-Technical | Accepted-Technical ADMITTED FOR TECHNICAL EVALUATION |
| 5 | Accepted-Technical 2K 23 HOUSING BOARD KRISHNA NAGAR BHARATPUR RAJASTHAN 321001 | BHARATPUR | BHARATPUR | RAJASTHAN | 321001 | Accepted-Technical ADMITTED FOR TECHNICAL EVALUATION |
Tender Value
₹14.5 Cr
EMD Value
₹29.0 L
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
WIDENING AND STRENGTHENING OF ITAULI GOPAMAU PISAWAN ROAD (O.D.R) FROM KM- 11,12,13,14 AND 15 (LENGTH 5.00KM) IN DIST. HARDOI WITH FIVE YEAR MAINTENANCE
2026_CEUCZ_1195558_1
4240/M/1MT/E-TENDER/UC/2026 DT 01.10.2026
Open Tender
Civil Works - Roads
Item Rate
365 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹29.0 L
Yes
SUPERINTENDING ENGINEER
24 Oct 2026
12 Oct 2026
17 Oct 2026
12 Oct 2026
17 Oct 2026
12 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location within all lifts and lead upto 1000 m. (including Labour Cess but excluding GST) | 5,092 | Cum | - | - |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Compaction only) (including Labour Cess but excluding GST) | 5,092 | Cum | - | - |
| 3 | Construction of embankment with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2 (including Labour Cess but excluding GST) | 12,100 | Cum | - | - |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2. (including Labour Cess but excluding GST) | 9,244 | Cum | - | - |
| 5 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (including Labour Cess but excluding GST) | 3,287 | Cum | - | - |
| 6 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with 4% portland cement with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer with paver as cemented base on sub base/subgrade (modified soil) and compacting with the road roller to achieve uniformed compressive strength as specified by Engineer-in-charge. (including Labour Cess but excluding GST) | 6,685 | Cum | - | - |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including Labour Cess but excluding GST) | 5,474 | Cum | - | - |
| 8 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical broom. (including Labour Cess but excluding GST) | 34,755 | Sqm | - | - |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (including Labour Cess but excluding GST) | 1,390 | Cum | - | - |
| 10 | Dismanteling brick work or stone work in lime or cement mortar and including stacking of Dismateled materials as directed by Engineer in charge within a distance of 60 mtr. As per SI no.- 692. (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) | 240 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.63 MB
SBDANDADDENDUMS.pdf
Tender Documents • 1.65 MB
ADDENDUM.pdf
Tender Documents • 1.30 MB
BOQ_2257893.xls
BOQ • 0.31 MB
CORRECTADDENDUM.pdf
PDF • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .