Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹35,000 (0.13%)Rejected-AOC | ₹2.7 Cr+₹35,000 (0.13%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.8 Cr+₹14.5 L (5.41%)Rejected-AOC CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | ₹2.8 Cr+₹14.5 L (5.41%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.9 Cr+₹21.0 L (7.84%)Rejected-AOC HOUSE NO 115 GALI NO 3 ADC COLONY SIRSA 125055 | SIRSA | SIRSA | HARYANA | 125055 | ₹2.9 Cr+₹21.0 L (7.84%) | L4 | Rejected-AOC L4 |
| 5 | L5₹3.0 Cr+₹36.2 L (13.5%)Rejected-AOC BAKRIANWALI SIRSA HARYANA 125055 | SIRSA | SIRSA | HARYANA | 125055 | ₹3.0 Cr+₹36.2 L (13.5%) | L5 | Rejected-AOC L5 |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
3 Nov 2023, 3:00 pmClosed
BHANU PARKASH SHARMA
EE PHE Division No. 2 Sirsa
Ottu Estimate for Providing Canal Based Water Works at Village Ottu, Distt. Sirsa. (Quality Affected Village)
2023_HRY_321939_1
2023A435E115 5C30 4B2A 8A6D 1D5A003B8AA0583PUH
Open Tender
Civil Works
Works
450 days
OTTU
2 documents required · 2 mandatory
₹15,000
₹5.8 L
Yes
13 Dec 2023
20 Oct 2023
3 Nov 2023
20 Oct 2023
3 Nov 2023
20 Oct 2023
Amount
N.S. Item
Construction of One No Water Treatment Plants of Capacity 1.00 MLD as per standard Design.
Provision for Installation of Panel Board including all required electric accessories complete in all respects.
Provision for Providing and installing of Horizontal centrifugal pumping sets for Raw Water capable of delivering a discharge of 12500 glns. (1000 LPM) per hour against a head of 12.50 mtrs. driven by electric motors of 10.00 BHP Respectively.
Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd Operation and maintenance
4th Operation and maintenance
5th Operation and maintenance
Bidder Name
Amount
Krishan Kumar Aggarwal Contractor(GSTN-06ABZPG8254A1ZI)
Lokesh Kumar, Contractor(GSTN-06AYAPK6590K1Z4)
RAKESH KUMAR CONTRACTOR(GSTN-06BALPR8992J2ZP)
M/s Jai Parkash Garg Contractor(GSTN-NA)
M.S. Construction Co.(GSTN-NA)
M/s Jai Parkash Garg Contractor
RAKESH KUMAR CONTRACTOR
Krishan Kumar Aggarwal Contractor
M.S. Construction Co.
Lokesh Kumar, Contractor
RAKESH KUMAR CONTRACTOR
Krishan Kumar Aggarwal Contractor
M.S. Construction Co.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .